History
The first phase of Shenzhen Metro Line 3 started construction in July 2007. On 23 April 2008, the Shenzhen Municipal Planning Bureau renamed the still under construction Shenzhen Metro Line 3 to "Longgang Line". The renaming was later reverted in 2013.First stage
The first phase of the line from to stations officially began operations on 28 December 2010. This section is almost entirely elevated except near . It starts from Longgang District and runs mainly along Shenhui Road, to Luohu District. The first phase has 16 stations, with a total length of .Second stage
The first phase (underground section) of the line from to stations and the second phase of the line from to stations, opened on 28 June 2011.Third stage
The third phase of the line from to stations, opened on 28 October 2020.Fourth stage
The fourth phase of the line from to stations, opened on 28 December 2024.Future development
Long term plans
Long term plans include extending Line 3 even further east into neighboring Huizhou City along with Line 14. On 7 August 2013 a "Memorandum of Cooperation" was signed to coordinate transport planning and urban development between the two cities, formalizing the planning process for the proposal.Service routes
* — (Before 11:00 PM) * — (Working days peak hours only) * Some train services from Futian Bonded Area to Tangkeng (usually at peak hours and 11:00 PM to 11:30 PM). * Some train services from Pingdi Liulian to Huaxin (usually at peak hours and 11:00 PM to 11:30 PM).Stations
Rolling stock
References
{{Shenzhen Metro stations, line3=yes Shenzhen Metro lines Railway lines opened in 2010 2010 establishments in China