Line 2 (Xuzhou Metro)
   HOME

TheInfoList



OR:

Line 2 of the
Xuzhou Metro The Xuzhou Metro () is a rapid transit system in Xuzhou, Jiangsu Province, China. Construction began in February 2014, and Line 1 was opened on September 28, 2019, Line 2 was opened on November 28, 2020, and Line 3 was opened on June 28, 2021. ...
() is a
rapid transit Rapid transit or mass rapid transit (MRT) or heavy rail, commonly referred to as metro, is a type of high-capacity public transport that is generally built in urban areas. A grade separation, grade separated rapid transit line below ground su ...
line in
Xuzhou Xuzhou ( zh, s=徐州), also known as Pengcheng () in ancient times, is a major city in northwestern Jiangsu province, China. The city, with a recorded population of 9,083,790 at the 2020 Chinese census, 2020 census (3,135,660 of which lived in ...
city,
Jiangsu Jiangsu is a coastal Provinces of the People's Republic of China, province in East China. It is one of the leading provinces in finance, education, technology, and tourism, with its capital in Nanjing. Jiangsu is the List of Chinese administra ...
province,
China China, officially the People's Republic of China (PRC), is a country in East Asia. With population of China, a population exceeding 1.4 billion, it is the list of countries by population (United Nations), second-most populous country after ...
. Construction commenced in February 2016, and the line was opened on November 28, 2020. It is the second metro line to open in Xuzhou. Line 2 runs primarily north–south through Xuzhou's CBD and Xuzhou New District, from North Coach Station in the north to Xinchengqu East in the south.


Line overview


History

Xuzhou Metro Line 2 officially began construction on February 22, 2016. As of September 2018, about half of the stations have begun main structure construction, while the other half have been capped successfully. Tunneling has begun on most stations, with eight stations having tunneled through for both tracks on the line. Civil engineering work on Line 2 is expected to complete in May 2019, with railway work completing in October 2019. Installation of electromechanical equipment will complete in March 2020, railway adjustment work will complete in June 2020, rolling stock will be tested on the line from July 1 to September 30, 2020, and the line opened to traffic in November 2020. As of 2018, the second phase has not begun construction; it will include six elevated stations to the south of Xinchengqu East Station.


References

{{DEFAULTSORT:Xuzhou Metro, Line 02 02 Railway lines opened in 2020 2020 in Xuzhou