History
The line was opened in two phases, with the long first phase from to () near Baodai Bridge started operations on December 28, 2013. This section consisted of of elevated track and of underground track. The second phase, running from to in the north, and from () to () in the east, commenced trial operations on September 24, 2016. A north extension to Aigehao Road is under construction, and it's expected to open in 2026.Opening timeline
Stations
Operations
Intervals
Rolling stock
References
{{DEFAULTSORT:Suzhou Rail Transit, Line 2 Suzhou Metro lines Railway lines opened in 2013 2013 in Suzhou