History
First stage
The first section of Line 2 runs from to , it is long, and these 12 stations are all underground. This section opened on 28 December 2010.Second stage
The second section runs from to , it is long, and has 17 stations. The second stage of Line 2 opened on 28 June 2011.Third stage
The third section runs from to , it is long, and has 3 stations. The third stage of Line 2 opened on 28 October 2020.Timeline
Service routes
* — (trains are through service with Line 8 after ) * — (Working days peak hours only)Stations
Rolling stock
Notes
References
{{Shenzhen Metro stations, line2=yes Shenzhen Metro lines Railway lines opened in 2010 2010 establishments in China 2010 in Shenzhen