Line 2 of
Metrovalencia
Metrovalencia is an urban rail system serving a large part of the metropolitan area of Valencia. The network is a modern amalgamation of former FEVE narrow gauge electric operated suburban railways. It is a large suburban network that crosse ...
opened on March 6, 2015 in the city of
Valencia, Spain
Valencia ( va, València) is the capital of the autonomous community of Valencia and the third-most populated municipality in Spain, with 791,413 inhabitants. It is also the capital of the province of the same name. The wider urban area also ...
. The line, which featured no new stations, was created as part of a restructuring of public transport in the city. It replaced the branch of
Line 1 Line 1 or 1 line may refer to:
Public transport Africa
* Line 1 (Algiers Metro), Algeria
* Cairo Metro Line 1, Egypt
Asia China
* Line 1 (Beijing Subway)
* Line 1 (Changchun Rail Transit)
* Line 1 (Changsha Metro)
* Line 1 (Changzhou Metro)
* L ...
which ran from
Llíria
Llíria (; es, Liria) is a medium-sized town off the CV35 motorway to the north of Valencia, Spain. Known as ''Edeta'' in ancient Iberian times, it is the musical capital of the region. On October 30, 2019, Llíria was declared a Creative Ci ...
to
Torrent
Torrent or torrents may refer to:
* A fast flowing stream
Animals
* Torrent duck, a species of the family Anatidae
* Torrent fish
* Torrent frog, various unrelated frogs
* Torrent robin, a bird species
* Torrent salamander, a family of sal ...
.
History
The original line 2 of Metrovalencia was opened with the rest of the network in 1988 and ran from Llíria to
Villanueva de Castellón. On 16 September 1999, line 2 ceased to exist when it was merged into line 1.
In the 2000s, a new line 2 was planned, to run from
Tavernes Blanques
Tavernes Blanques (, es, Tabernes Blanques) is a municipality in the ''comarca'' of Horta Nord in the Valencian Community
The Valencian Community ( ca-valencia, Comunitat Valenciana, es, Comunidad Valenciana) is an autonomous community of ...
to Valencia's Natzaret district. As of October 2018,
this line is partially complete. Construction had been halted for several years due to Spain's economic problems, but resumed in June 2017 and that line is now designated as Line 10. The line 2 designation is now used for existing branches of the network. The frequency of trains on these branches will remain unchanged.
References
External links
{{Valencia Metro Lines
Metrovalencia
1988 establishments in the Valencian Community
1999 disestablishments in the Valencian Community
2015 establishments in the Valencian Community
Rapid transit lines in Spain