Limestone Generating Station is a run-of-the-river
hydroelectric dam Hydroelectricity, or hydroelectric power, is Electricity generation, electricity generated from hydropower (water power). Hydropower supplies 15% of the world's electricity, almost 4,210 TWh in 2023, which is more than all other Renewable energ ...
on the
Nelson River The Nelson River is a river of north-central North America, in the Provinces and territories of Canada, Canadian province of Manitoba. The river drains Lake Winnipeg and runs before it ends in Hudson Bay near Port Nelson, Manitoba, Port Nels ...
approximately north of
Winnipeg Winnipeg () is the capital and largest city of the Provinces and territories of Canada, Canadian province of Manitoba. It is centred on the confluence of the Red River of the North, Red and Assiniboine River, Assiniboine rivers. , Winnipeg h ...
near Gillam, Manitoba. Part of the Nelson River Hydroelectric Project, Limestone was Manitoba Hydro's fifth and largest generating station to be built on the Nelson River. The station was built on the
Nelson River The Nelson River is a river of north-central North America, in the Provinces and territories of Canada, Canadian province of Manitoba. The river drains Lake Winnipeg and runs before it ends in Hudson Bay near Port Nelson, Manitoba, Port Nels ...
at Long Spruce Rapids. The site is approximately downstream of Manitoba Hydro's Long Spruce Generating Station. The dam is owned and operated by
Manitoba Hydro The Manitoba Hydro-Electric Board (), operating as Manitoba Hydro, is the electric power and natural gas public utility, utility in the province of Manitoba, Canada. Founded in 1961, it is a provincial Crown Corporation, governed by the Manitoba ...
. It has ten generating units with a capacity of 1,330
megawatt The watt (symbol: W) is the unit of Power (physics), power or radiant flux in the International System of Units (SI), equal to 1 joule per second or 1 kg⋅m2⋅s−3. It is used to quantification (science), quantify the rate of Work ...
s and annual generation around 8.5 terawatt-hours. Although work at the site began in 1976 with a cofferdam completed in 1978, construction was suspended owing to a slowing of demand for electric power. The project resumed in 1985, with the first generating unit delivering power in 1990 and completion in 1992. Construction cost was $CDN 1.43 billion; favorable economic conditions at the time resulted in lower cost than budget.Manitoba Hydro
Limestone Generating Station
Retrieved: 2 February 2012.


See also

*
List of largest power stations in Canada This article lists the largest electrical generating stations in Canada in terms of current installed Nameplate capacity, electrical capacity. Non-renewable resource, Non-renewable power stations are those that run on coal, fuel oils, Nuclear powe ...
* Kettle Generating Station – first dam upstream, completed in 1973 * Long Spruce Generating Station – second dam upstream, completed in 1979 *
Nelson River DC Transmission System The Nelson River DC Transmission System, also known as the Manitoba Bipole, is an electric power transmission system of three High-voltage direct current, high voltage, direct current lines in Manitoba, Canada, operated by Manitoba Hydro as part ...
– transmission system to loads in the South of the province


References


External links

{{Nelson River dams Energy infrastructure completed in 1992 Hydroelectric power stations in Manitoba Run-of-the-river power stations Buildings and structures in Northern Region, Manitoba