HOME

TheInfoList



OR:

The Rocco A. Petrone Launch Control Center (commonly known as just the Launch Control Center or LCC) is a four-story building at NASA's Kennedy Space Center on Merritt Island, Florida, used to manage launches of launch vehicles from
Kennedy Space Center Launch Complex 39 Launch Complex 39 (LC-39) is a rocket launch site at the John F. Kennedy Space Center on Merritt Island in Florida, United States. The site and its collection of facilities were originally built as the Apollo program's "Moonport" and later m ...
. Attached to the southeast corner of the Vehicle Assembly Building, the LCC contains offices; telemetry, tracking, and instrumentation equipment; and firing rooms. LCC has conducted launches since the unmanned Apollo 4 (Apollo-Saturn 501) launch on November 9, 1967. LCC's first launch with a human crew was
Apollo 8 Apollo 8 (December 21–27, 1968) was the first crewed spacecraft to leave low Earth orbit and the first human spaceflight to reach the Moon. The crew orbited the Moon ten times without landing, and then departed safely back to Earth. These ...
on December 21, 1968. NASA's Space Shuttle program also used LCC. NASA has renovated the center for Space Launch System (SLS) missions, which began in 2022 with
Artemis 1 Artemis 1, officially Artemis I and formerly Exploration Mission-1 (EM-1), was an uncrewed Moon-orbiting mission. As the first major spaceflight of NASA's Artemis program, Artemis 1 marked the return of the agency to lunar exploration original ...
. In February 2022, the center was renamed after former launch director Rocco A. Petrone.


Firing rooms

Launch operations are supervised and controlled from several control rooms known as firing rooms. The controllers are in control of pre-launch checks, the booster and spacecraft. Once the rocket has cleared the launch tower (usually within the first 10–15 seconds), is when control is switched over to the mission's relative mission control center. (The
Christopher C. Kraft Jr. Mission Control Center NASA's Christopher C. Kraft Jr. Mission Control Center (MCC-H, initially called Integrated Mission Control Center, or IMCC), also known by its radio callsign, Houston, is the facility at the Lyndon B. Johnson Space Center in Houston, Texas, ...
at the
Johnson Space Center The Lyndon B. Johnson Space Center (JSC) is NASA's center for human spaceflight (originally named the Manned Spacecraft Center), where human spaceflight training, research, and flight control are conducted. It was renamed in honor of the late U ...
in
Houston, Texas Houston (; ) is the most populous city in Texas, the most populous city in the Southern United States, the fourth-most populous city in the United States, and the sixth-most populous city in North America, with a population of 2,304,580 in ...
for NASA launches or
SpaceX Space Exploration Technologies Corp. (SpaceX) is an American spacecraft manufacturer, launcher, and a satellite communications corporation headquartered in Hawthorne, California. It was founded in 2002 by Elon Musk with the stated goal of ...
Mission Control Center in Hawthorne, California for SpaceX launches.) Extensive renovation of Firing Room 4 was finished in 2006. Firing Room 4 is leased by
SpaceX Space Exploration Technologies Corp. (SpaceX) is an American spacecraft manufacturer, launcher, and a satellite communications corporation headquartered in Hawthorne, California. It was founded in 2002 by Elon Musk with the stated goal of ...
and serves as their launch control center for Launch Complex 39A.


Key personnel


Launch Director (LD)

The Launch Director is the head of the launch team, and is responsible for making the final "go" or "no go" decision for launch after polling the relevant team members. There have been eight different Space Shuttle launch directors between 1981 and 2011.


Flow Director (FD)

The Flow Director is responsible for the preparation of the spacecraft for launch, and remains in the LCC in an advisory capacity.


NASA Test Director (NTD)

The NASA Test Director is responsible for all pre-launch testing, whether involving the flight crew, the orbiter, the external tank/solid rocket booster, or ground support equipment. The NTD is also responsible for the safety of all personnel on the pad after fuelling has occurred. Reports to the Launch Director.


Orbiter Test Conductor (OTC)

The Orbiter Test Conductor is in charge of all pre-flight checkout and testing of the orbiter, and manages the engineers in the firing room who monitor the orbiter's systems. OTC is an employee of a contractor rather than of NASA.


Tank/Booster Test Conductor (TBC)


Payload Test Conductor (PTC)

The Payload Test Conductor is responsible for the pre-flight test and checkout of payloads carried by the orbiter and manages the engineering and test teams responsible for monitoring and controlling payload ground operations. PTC is a contractor member of the Space Shuttle Team.


Launch Processing System Coordinator (LPS)

The LPS Coordinator monitors and oversees the LPS System; specifically, the desired launch rate, Space Shuttle ''stacking'' (assembly), and all safety requirements. This is made possible by the Launch Processing System, or LPS — a highly automated, computer-controlled system that oversees the entire checkout and launch process.NASA: ''KSC Launch Control Center''
/ref>


Support Test Manager (STM)


Safety Console Coordinator (SAFETY)


Shuttle Project Engineer (SPE)


Landing and Recovery Director (LRD)


No Landing and Recovery Director (NLRD)


Superintendent of Range Operations (SRO)

The Superintendent of Range Operations ensures that all tracking and communications systems are ready to support the launch operation as well as ensuring that downrange airspace and splashdown areas remain clear for launch, and monitors weather near the launch site.


Ground Launch Sequencer Engineer (CGLS)

The Ground Launch Sequencer Engineer is responsible for monitoring the operation of the automated Ground Launch Sequencer system, which controls the countdown from T-9 minutes until launch. After this point through to T-31 seconds, they are in charge of implementing a manual hold if necessary. After T-31 seconds only an automatic cutoff is available. The automatic cutoff recycles the countdown clock to T-20 minutes. Usually this will extend the launch time beyond the launch window causing a scrub and a 24-hour turnaround.


Gallery

File:NASA Launch Control Center renovated control room.jpg, Interior of the recently renovated firing room 2 in 2018.


See also

*
Ground station A ground station, Earth station, or Earth terminal is a terrestrial radio station designed for extraplanetary telecommunication with spacecraft (constituting part of the ground segment of the spacecraft system), or reception of radio waves fro ...
* Launch status check * Mission control center *
Spacecraft naming Spacecraft and their missions are given descriptive, sometimes technical names, by scientists, engineers and administrators involved. Space agencies sometimes open the naming up to the public or to school children in the form of essay contests. Lu ...


References


Sources


Launch Control Center
Main page.


External links



at the Launch Control Center
Floor plan layout of the Firing Rooms
at the Launch Control Center

{{Use American English, date=January 2014 Kennedy Space Center Buildings and structures in Merritt Island, Florida National Register of Historic Places in Brevard County, Florida