HOME

TheInfoList



OR:

King George Hub is a
mixed-use development Mixed use is a type of urban development, urban design, urban planning and/or a zoning classification that blends multiple uses, such as residential, commercial, cultural, institutional, or entertainment, into one space, where those functions ...
with retail, office and residential high-rises in
Surrey, British Columbia Surrey is a city in British Columbia, Canada. It is located south of the Fraser River on the Canada–United States border. It is a member municipality of the Metro Vancouver regional district and metropolitan area. Mainly a suburban city, Surr ...
, Canada, located at the northeast corner of King George Boulevard and
Fraser Highway Fraser Highway is a major arterial road in the Lower Mainland of British Columbia. Connecting the cities of Surrey and Abbotsford, the highway formerly constituted a major portion of British Columbia Highway 1A until the latter was decommissi ...
in the
Surrey City Centre Whalley is the most densely populated and urban area, urban of the six town centres in Surrey, British Columbia, Canada. It encompasses City Centre, the city's central business district, and is home to the Surrey City Hall, the Surrey City Centr ...
district. Developed by the PCI Group and designed by MCM Partnership, the project is located adjacent to the transit hub at
King George station King George is an elevated station on the Expo Line of Metro Vancouver's SkyTrain rapid transit system. The station is located in the south end of the Surrey City Centre district of Surrey, British Columbia, Canada, and is one of the outbound ...
.


History

Phase A began construction in 2012 and was completed in early 2016, houses the headquarters for Coast Capital Savings, a federal credit union. The second phase, which began construction in early 2018, consists of the Hub 9850 office building, and the Hub One and Two residential towers. Phase B was completed in 2021. Phase C, which began construction in 2019, consists only of The Line residential building. Phase D, the final phase, began construction in 2021. It consists of the Plaza One and Two residential buildings and are both estimated to be completed in 2025.


Buildings


Hub One

Hub One is a residential building located at 13615 Fraser Highway. Completed in 2021, it stands at tall and is the second tallest building in Surrey.


Hub Two

Hub Two is a residential building located at 13655 Fraser Highway. Completed in 2021, it stands at tall.


Hub 9850

Hub 9850 is an office building located at 9850 King George Boulevard. Completed in 2021, it stands at tall. Westland Insurance has occupied the top seven floors of the building since 2022.


The Line

The Line is a residential building located at 13639 George Junction. Completed in 2021, it stands at tall. All units in the building are rentals.


References


External links

*
King George Hub

PCI Group - King George Hub
{{Shopping Malls in Metro Vancouver Buildings and structures in Surrey, British Columbia Modernist architecture in Canada Buildings and structures under construction in Canada