HOME

TheInfoList



OR:

JAGAL (''Jamal-Gas-Anbindungsleitung'') is a German section of the Yamal-Europe pipeline. The pipeline is used for the Russian natural gas import and it is owned and operated by Gascade Gastransport GmbH. It runs from the Polish–German border at
Lebus Lebus ( pl, Lubusz) is a historic town in the Märkisch-Oderland District of Brandenburg, Germany. It is the administrative seat of ''Amt'' ("collective municipality") Lebus. The town, located on the west bank of the Oder river at the border w ...
near
Frankfurt (Oder) Frankfurt (Oder), also known as Frankfurt an der Oder (), is a city in the German state of Brandenburg. It has around 57,000 inhabitants, is one of the easternmost cities in Germany, the fourth-largest city in Brandenburg, and the largest German ...
to Rückersdorf. In Rückersdorf JAGAL is connected with
STEGAL STEGAL (''Sachsen-Thüringen-Erdgas-Anbindungsleitung'') is a natural gas pipeline in Saxony and Thuringia, Germany. It connects the Czech Transgas pipeline at Olbernhau and the JAGAL pipeline (exporting gas from the Yamal–Europe pipeline) at ...
pipeline carrying gas further west. In Bernau JAGAL is connected with the Verbundnetz Gas AG-operated long-distance gas pipeline No. 302. Construction of the JAGAL pipeline started in 1995, when a double duct between
Lebus Lebus ( pl, Lubusz) is a historic town in the Märkisch-Oderland District of Brandenburg, Germany. It is the administrative seat of ''Amt'' ("collective municipality") Lebus. The town, located on the west bank of the Oder river at the border w ...
and Górzyca in
Poland Poland, officially the Republic of Poland, , is a country in Central Europe. Poland is divided into Voivodeships of Poland, sixteen voivodeships and is the fifth most populous member state of the European Union (EU), with over 38 mill ...
was laid under
Oder The Oder ( , ; Czech language, Czech, Lower Sorbian language, Lower Sorbian and ; ) is a river in Central Europe. It is Poland's second-longest river in total length and third-longest within its borders after the Vistula and Warta. The Oder ri ...
and long connection from Lebus to Mallnow compressor station was built. This section was completed in 1996. The second section of JAGAL from Mallnow to
Baruth/Mark Baruth/Mark is a town in the Teltow-Fläming district of Brandenburg, Germany. It is situated 24 km east of Luckenwalde, and 53 km south of Berlin. Geography Baruth/Mark is structured in the following parts of town,Main constitution ...
was completed in 1997. JAGAL II from Baruth to Rückersdorf was constructed in 1999. The section from the border to Mallnow has a diameter of while rest of the pipeline has a diameter of . It has a capacity of of natural gas per year.


See also

* MEGAL * OPAL pipeline


References


External links


JAGAL (Gascade website)
{{coord missing, Germany 1999 establishments in Germany Natural gas pipelines in Germany