The Interstate-395 Signature Bridge (also referred to as The Fountain) is an ongoing construction project on the I-395/SR-836/
I-95 Interstate 95 (I-95) is the main north–south Interstate Highway on the East Coast of the United States, running from U.S. Route 1 (US 1) in Miami, Florida, north to the Houlton–Woodstock Border Crossing between Maine and the ...
Midtown Interchange The Midtown Interchange, located in the Civic Center and Overtown neighborhoods of Miami, Florida, is the convergence of three major motorways: I-95, I-395 (which connects to the MacArthur Causeway to the east), and the Dolphin Expressway (SR ...
in
downtown Miami Downtown Miami is the urban city center of Miami, Florida, United States. The city's greater downtown region consists of the Central Business District, Brickell, the Historic District, Government Center, the Arts & Entertainment District, and ...
,
Florida Florida ( ; ) is a U.S. state, state in the Southeastern United States, Southeastern region of the United States. It borders the Gulf of Mexico to the west, Alabama to the northwest, Georgia (U.S. state), Georgia to the north, the Atlantic ...
. The bridge was designed by Donald MacDonald architects, led by the Archer-Western-de Moya Group. The
Florida Department of Transportation The Florida Department of Transportation (FDOT) is a decentralized agency charged with the establishment, maintenance, and regulation of public transportation in the U.S. state of Florida. The department was formed in 1969. It absorbed the power ...
and
Miami-Dade Expressway Authority The Greater Miami Expressway Agency (GMX) (formerly the Miami-Dade Expressway Authority, MDX) is an independent agency governed by the state of Florida. Since 1997, GMX has operated and maintained five expressways that run within the county. All ...
are the current overseers of the project.Connecting Miami I-395/SR 836/I-95 Design Build Project. (2025, January 30). I-395/SR 836/I-95 Design Build Project. https://i395-miami.com The bridge spans 1025 feet (312 meters), with a maximum arch height reaching 325 feet (100 meters). The construction project began in 2016 and was intended to be completed in 2024, but setbacks have moved the expected completion date to 2027.Robbins, J. C. (2024, December 4). I-395 Signature Bridge project rises higher. Miami Today. https://www.miamitodaynews.com/2024/12/04/i-395-signature-bridge-project-rises-higher/ The Fountain aspect of the bridge intends to stand as a landmark for passerby visible from the
Port of Miami The Port of Miami, styled as PortMiami and formally known as the Dante B. Fascell Port of Miami, is a major seaport located in Biscayne Bay at the mouth of the Miami River in Miami, Florida. It is the largest passenger port in the world and one ...
, while the bridge additionally serves as an emergency evacuation route from
Miami Beach Miami Beach is a coastal resort city in Miami-Dade County, Florida, United States. It is part of the Miami metropolitan area of South Florida. The municipality is located on natural and human-made barrier islands between the Atlantic Ocean an ...
. The wider project, known as Connecting Miami, also includes double decking a portion of the Dolphin Expressway (SR 836) west of the Midtown Interchange.


Project concept

The I-395 Signature Bridge project was created with the intention of displaying the greater city of Miami as a center of the arts, standing alongside nearby art hubs such as the
Adrienne Arsht Center for the Performing Arts The Adrienne Arsht Center for the Performing Arts of Miami-Dade County is a performing arts center located in Miami, Florida. It is one of the largest performing arts centers in the United States. According to Arts Management Magazine, the Arsht C ...
and the Perez Art Museum. The name "The Fountain" was coined to tie the bridge's water-like expression to Miami's connection to water. The fountain-like appearance of the bridge will also include LED luminaries that will create a lighting effect across the arches. The bridge is one part of the greater highway interchange project taking place on I-395 and nearby highways. New lanes are being added to I-395-MacArthur Causeway interchange, and modifications will be made to the exits toward NE and NW 2nd Avenues. On the I-95 interchange, roads will be repaved and new ramps to SR-836 and I-95 will facilitate traffic flow. In addition to the Bridge, the project will form an urban park with the 55-acre plot beneath the highway interchange. The role of bridges in urban environments often serves to resemble the culture and history of the city it inhabits, influencing city identity and public opinion. In accordance, under the bridge, the proposed Heritage Walk will honor Miami's history, with references to the
Tequesta The Tequesta, also Tekesta, Tegesta, Chequesta, Vizcaynos, were a Native American tribe on the Southeastern Atlantic coast of Florida. They had infrequent contact with Europeans and had largely migrated by the middle of the 18th century. Loca ...
Indians,
Julia Tuttle Julia DeForest Tuttle (née Sturtevant; January 22, 1849 – September 14, 1898) was an American businesswoman who owned the property upon which Miami, Florida, was built. For this reason, she's called the "Mother of Miami." She's the only woman ...
,
Henry Flagler Henry Morrison Flagler (January 2, 1830 – May 20, 1913) was an American industrialist and a founder of Standard Oil, which was first based in Ohio. He was also a key figure in the development of the Atlantic coast of Florida and founder ...
, the African American settlers of Overtown, Cuban immigrants, and more. These founders and figures of Miami will be part of the new landmark in a combination with a recreational space intended to provide nature and promote sustainability in the otherwise urban area. The clearance over the boulevard is about 27 feet.


Construction process


Planning

As of April 2025, notable progress has been made on the completion of the bridge. The previous I-395 bridge part of the interchange has been demolished and the installation of foundations and piers for the new bridge has begun. Crews have completed one of the six arches over Northeast Second Avenue and have nearly finished erecting all 41 precast, 90-ton arch segments for a second arch. Plans for the urban park beneath I-395, which will be known as the "Underdeck," have received a $60.3 million grant from the City of Miami to fund amenities such as interactive water features, an amphitheater, and urban gardens. Despite the progress, construction of the bridge has faced a number of setbacks, which have brought the projected completion date from 2024 to 2027 and the total cost from $800 million to $840 million. Due to the
COVID-19 pandemic The COVID-19 pandemic (also known as the coronavirus pandemic and COVID pandemic), caused by severe acute respiratory syndrome coronavirus 2 (SARS-CoV-2), began with an disease outbreak, outbreak of COVID-19 in Wuhan, China, in December ...
, the construction efforts faced a variety of supply chain issues which led to the delay of delivery of essential materials such as steel and concrete. Labor shortages and health and safety protocols related to the pandemic additionally slowed the construction timeline. Existing in the waterside, tropical climate of Miami, the bridge construction has also faced severe weather which has further prolonged the project. The rise in the projected total cost is attributed to a variety of factors. In addition to materials cost escalation, design changes in parts of the project, such as the Underdeck, and additional expenses for maintaining the construction site and traffic protocols over the extended period of time have all contributed to the elevated cost.


Traffic concerns

The extended construction process of the I-395 Signature Bridge has impacted the transportation and overall livelihood of the downtown Miami area. The closure of lanes on I-395 and nearby roads has led to traffic detours affecting day-to-day commute. The closed lanes have increased traffic congestion, especially during peak commute hours in the morning and afternoon. The I-395 Signature Bridge upon completion intends to form wider lanes and more accessible highway interchanges which will overall reduce traffic in comparison to before the project's commencement. In order to minimize disruptions during construction, the Florida Department of Transportation (FDOT) has implemented a variety of traffic management measures, which include the adjustment of traffic signaling, the creation of additional lanes in certain areas to compensate for those lost, and providing real-time traffic updates to assist drivers in navigating construction zones.


References

{{reflist Road bridges in Florida Transportation buildings and structures in Miami Bridges of the United States Numbered Highway System Bridges on the Interstate Highway System Buildings and structures under construction in the United States Bridges under construction Works impacted by the COVID-19 pandemic