Fitting out, or outfitting, is the process in
shipbuilding Shipbuilding is the construction of ships and other Watercraft, floating vessels. In modern times, it normally takes place in a specialized facility known as a shipyard. Shipbuilders, also called shipwrights, follow a specialized occupation th ...
that follows the float-out/launching of a vessel and precedes
sea trial A sea trial or trial trip is the testing phase of a watercraft (including boats, ships, and submarines). It is also referred to as a "shakedown cruise" by many naval personnel. It is usually the last phase of construction and takes place on op ...
s. It is the period when all the remaining construction of the ship is completed and readied for delivery to her owners. Since most of the fitting-out process is interior work, this stage can overlap with latter stages, such as the sea trials.


Launching or floating

After a vessel has been floated (in contemporary shipbuilding) or launched (in traditional shipbuilding), it is then towed out of its
drydock A dry dock (sometimes drydock or dry-dock) is a narrow basin or vessel that can be flooded to allow a load to be floated in, then drained to allow that load to come to rest on a dry platform. Dry docks are used for the construction, maintenance, ...
and moored at a fitting-out berth.
The Fairfield Shipbuilding and Engineering Works: History of the Company: Review of Its Productions; and Description of the Works
'. Fairfield Ship Building & Engineering Company, 1909. 108.
While still afloat, its construction is then continued. Depending on the type of vessel, fitting-out can last weeks or many months. Vessels with comparatively little space for human occupation, such as oil tankers, bulk carriers and container ships, can take the least time for fitting. Conversely,
passenger ship A passenger ship is a merchant ship whose primary function is to carry passengers on the sea. The category does not include cargo vessels which have accommodations for limited numbers of passengers, such as the ubiquitous twelve-passenger freig ...
s take the longest. The process can include: * completion of the superstructure, * installation of the ship’s power plant, engines, and other machinery, * interior equipment and systems, including
electrical Electricity is the set of physical phenomena associated with the presence and motion of matter possessing an electric charge. Electricity is related to magnetism, both being part of the phenomenon of electromagnetism, as described by Maxwel ...
,
plumbing Plumbing is any system that conveys fluids for a wide range of applications. Plumbing uses piping, pipes, valves, piping and plumbing fitting, plumbing fixtures, Storage tank, tanks, and other apparatuses to convey fluids. HVAC, Heating and co ...
, and
HVAC Heating, ventilation, and air conditioning (HVAC ) is the use of various technologies to control the temperature, humidity, and purity of the air in an enclosed space. Its goal is to provide thermal comfort and acceptable indoor air quality. ...
, * finishing of interior spaces, * and installation of
furnishings ] The decorative arts are arts or crafts whose aim is the design and manufacture of objects that are both beautiful and functional. This includes most of the objects for the interiors of buildings, as well as interior design, but typically excl ...
. Whatever construction is completed during fitting is also dependent on the shipyard’s capabilities and the availability of equipment prior to floating. For example, '' Queen Mary 2'' was originally to have its propeller pods installed prior to floating, but this was not done until the fitting-out stage. Contemporary ship construction usually has the vessel returning to drydock several times for installation of propulsion mechanisms (such as propulsion pods in contemporary vessels) and for the painting of surfaces below the waterline.