The First Jordan Hydro-Electric Power House, also known as the Rutenberg Power Station or the Naharayim Power Plant or the Tel Or Power Plant, was a conventional dammed hydroelectric power station on the Jordan river, which operated between 1932 and 1948. It was situated in the Emirate of Transjordan (modern
Jordan Jordan, officially the Hashemite Kingdom of Jordan, is a country in the Southern Levant region of West Asia. Jordan is bordered by Syria to the north, Iraq to the east, Saudi Arabia to the south, and Israel and the occupied Palestinian ter ...
), but built to supply power to
Mandatory Palestine Mandatory Palestine was a British Empire, British geopolitical entity that existed between 1920 and 1948 in the Palestine (region), region of Palestine, and after 1922, under the terms of the League of Nations's Mandate for Palestine. After ...
(modern
Israel Israel, officially the State of Israel, is a country in West Asia. It Borders of Israel, shares borders with Lebanon to the north, Syria to the north-east, Jordan to the east, Egypt to the south-west, and the Mediterranean Sea to the west. Isr ...
). The plant was built in an area known as Jisr el-Majami, later renamed by Pinhas Rutenberg's Palestine Electric Corporation as Naharayim, and following the Israel–Jordan peace treaty it is today part of the Jordanian area of Baqoura. The plant was constructed – under concession from the Mandatory government – by the Palestine Electric Corporation based on a plan put forward in 1926. It followed his original 1920 ''Rutenberg plan'' to build ten reservoirs and fourteen hydroelectric plants on the Jordan river. Financial capital for the project came from the worldwide Jewish community, organized with limited publicity in order to allow Rutenberg to be presented as an "entrepreneur" rather than part of the Zionist Organization.


Concession

thumb , Palestine Electric Company: Plans for the three power stations across the region On 8 December 1920, Pinhas Rutenberg submitted a 60 page proposal to the British government, proposing to build 14 hydroelectric power stations along the Jordan River On 21 September 1921, a concession agreement was signed between the British Government and Rutenberg granting him a monopoly over "utilization of such of the waters of the River Jordan and its basin including the Yarmuk River and all other affluents" and a right to "erect a power house near Jisr-el-Mujamyeh". This agreement required Rutenberg to form a company with at least GBP1 million of capital within two years; such company was formed, named the Palestine Electric Corporation (PEC). The concession was then formalized on 5 March 1926 for a 70-year period and validated in
Mandatory Palestine Mandatory Palestine was a British Empire, British geopolitical entity that existed between 1920 and 1948 in the Palestine (region), region of Palestine, and after 1922, under the terms of the League of Nations's Mandate for Palestine. After ...
by the Electricity Concessions Ordinance 1927 and in the Emirate of Transjordan by the Electricity Concession Law, 1928.


Construction

thumb , Jewish-owned lands in the area useful to the project (previous acquisitions, and additional ones made by the PEC) The plant was constructed between 1926 and 1933. About 3000 workers were employed during the construction. Rutenberg's original proposal explained that the location near Jisr el-Majami was the only site on which it was "possible to begin construction of a powerhouse immediately", due to the required proximity to the
Sea of Galilee The Sea of Galilee (, Judeo-Aramaic languages, Judeo-Aramaic: יַמּא דטבריא, גִּנֵּיסַר, ), also called Lake Tiberias, Genezareth Lake or Kinneret, is a freshwater lake in Israel. It is the lowest freshwater lake on Earth ...
(which would act as a natural reservoir) and because it represented the location which had been most densely settled by Jews. The choice of the location influenced the ongoing Anglo-French discussions over the location of the mandatory borders, which became the Paulet–Newcombe Agreement. A similar dynamic appeared in the finalization of the eastern border with respect to what became known as the "Semakh triangle".


Operation

The plant operated between 1932 and 1948. The opening ceremony took place on 9 June 1932, attended by Emir Abdullah I of Jordan and British officials including the High Commissioner Arthur Grenfell Wauchope, Colonel Charles Henry Fortnom Cox, and Sir Steuart Spencer Davis. The plant ceased operations following the 1948 Arab-Israeli war. It was captured and looted by the Iraqi Army on 14 May 1948. Transjordan had a secret agreement with Israel regarding protection of the works. United States
Chargé d'affaires A (), plural ''chargés d'affaires'', often shortened to ''chargé'' (French) and sometimes in colloquial English to ''charge-D'', is a diplomat who serves as an embassy's chief of mission in the absence of the ambassador. The term is Frenc ...
Wells Stabler reported in a confidential despatch that when the Iraqi army arrived, the Israeli operators of the plant blew up some of the electricity generators ( alternators) in the plant and the plant was subsequently looted by the Iraqi troops. Thirty-eight workers were captured; they were released only after the Armistice Agreements were signed on 3 April 1949.Meiton, 2019, p.214 Stabler's despatch on 11 July 1949, written after a visit to the site, read:
It is understood that prior to the hostilities In May 1948, the Jordan Government and the Jewish Agency reached some form of agreement concerning the protection of the Hydro-Electric works. It is possible that the Jordan Government would have been able to observe this agreement if it had not been for the arrival of the Iraqi forces. When the Iraqi forces came into the area, the Israelis departed, but only after blowing up certain of the dynamos in the main dynamo building. Later the Iraqi finished the job, even removing numerous machines.... The area has been under the control of the Arab Legion since the departure of the Iraqi troops three months ago. All looting and damage has been stopped by the Legion and the area is under guard. ... It is quite obvious that the Rutenberg Hydro-Electric works can only be operated again by an agreement between Jordan and Israel. Jordan, on its part, is incapable of operating such a works by itself and, moreover, the Israelis can control the flow of the Jordan. Israel, on the other hand, cannot commence operations of the works as all the buildings are in Jordan territory. In addition, Jordan can control the flow of the Yarmuk River. It would appear that it would take some time yet to reach an agreement on the operation of the Rutenberg Hydro-Electric works as it remains, along with the Dead Sea Potash Works, an important bargaining point for Jordan.


1948 proposals to reopen

Various proposals were made for cooperation between Israel and Jordan regarding the use of the Jordan river in the wake of the 1948 war. After an armistice agreement was signed PEC executives proposed to open the plant but the Jordanian king refused.Meiton, 2019, p.214 Proposal to apply the seven-state Tennessee Valley Authority scheme to the area was submitted to the United Nations in 1953, stating:


Tourism

After the Israel–Jordan peace treaty of 1994, the so-called " Peace Island" at the confluence of the Yarmuk and Jordan has become a tourist attraction, with plans to include visits to the actual power plant (the building with the turbines that lies south of Peace Island) sometime in the future. The 2019 cooling-down in the bilateral relations, with Jordan withdrawing the 25-year special arrangement for Naharayim/Baqoura, meant that the Peace Island became a no-go area for tourists, before any plans regarding the power plant were put into practice.


Gallery

File:Agreement for the Granting of a Concession for the Utilization of the Waters of the Rivers Jordan and Yarmuk and their affluents for generating and supplying Electrical Energy.pdf, 1921 Agreement for the Granting of a Concession for the Utilization of the Waters of the Rivers Jordan and Yarmuk and their affluents for generating and supplying Electrical Energy File:The Half Promised Land Palestine Rutenberg 7 June 1922 Punch Magazine.jpg, Rutenberg caricatured in '' Punch'' on 7 June 1922, whilst the concession was being actively discussed during the British
House of Lords The House of Lords is the upper house of the Parliament of the United Kingdom. Like the lower house, the House of Commons of the United Kingdom, House of Commons, it meets in the Palace of Westminster in London, England. One of the oldest ext ...
debates on the
Mandate for Palestine The Mandate for Palestine was a League of Nations mandate for British Empire, British administration of the territories of Mandatory Palestine, Palestine and Emirate of Transjordan, Transjordanwhich had been Ottoman Syria, part of the Ottoman ...
. File:RutenbergConcessions1927.pdf, 1927 documents containing the concession as signed in 1926 and their passage into Palestinian law File:1928 Palestine Electric Corporation General Scheme for the area around the First Jordan Power House.jpg, 1928 General Scheme plan File:נהרים - תחנת חשמל בבנייתה.-JNF034536.jpeg, Under construction 1930 First Jordan Hydro-Electric Power House Opening Ceremony.jpg, Opening ceremony File:Falastin newspaper front page 2 November 1932 on the anniversary of the Balfour Declaration.jpg, Front page of the Arabic newspaper '' Falastin'' on the 15th anniversary of the Balfour Declaration, 2 November 1932. The power plant is shown in the top left corner of the cartoon () File:נהרים - מפעל רוטנברג, מראה כללי.-JNF044521.jpeg, General view 1935 File:נהרים - מפעל רוטנברג, תחנת הכוח מבפנים.-JNF044517.jpeg, Interior of power station 1935 File:1936 Palestine Electric Corporation diagram of transmission lines around the Jisr El Majami area.jpg, 1936 diagram of the transmission lines leading from the plant File:1935 Palestine Electric Corporation General Scheme for the area around the First Jordan Power House.jpg, 1935 General Scheme plan File:1931 Palestine Electric Corporation First Jordan Power House cross section.jpg, Cross section File:1931 Palestine Electric Corporation First Jordan Power House longditudinal section.jpg, Longitudinal section File:1940s Survey of Palestine map of Jisr el Majami, Naharayim and Baqoura.png, 1940s Survey of Palestine map


Relevant documents

* P. Rutenberg, "Water Resources of Palestine, I. Jordan Valley, Preliminary Project", a Confidential Report issued in Jerasalem, dated June 1920, bilingual (English and Hebrew), pp. 61 (Rutenberg proposal, 8 Dec. 1920, TNA CO 733/9) * The Crown Agents for the Colonies and Mr. Pinhas Rutenberg, " Agreement for the Granting of a Concession for the Utilization of the Waters of the Rivers Jordan and Yarmouk and Their Affluents for Generating and Supplying Electrical Energy", witnessed by Burchells Solicitors of Westminster, London; Herbert Oppenheimer Nathan and Vandyk, Solicitors, London; and Harry Sacher, Barrister at Law and Notary Public, Jerusalem, dated 21 September 1921. * 5 March 1926 concession agreement * "Official Gazette No. 177", Princedom of Transjordan, 1928. * House of Commons discussions: *
ELECTRIC POWER CONCESSION, HC Deb 07 November 1921 vol 148 cc41-2
*
CONCESSIONS. PALESTINE (MR. RUTENBERG), HC Deb 31 May 1922 vol 154 cc2119-20W