Expressway S2 is a short
highway A highway is any public or private road or other public way on land. It includes not just major roads, but also other public roads and rights of way. In the United States, it is also used as an equivalent term to controlled-access highway, or ...
in Poland, serving as the southern section of the (partially completed)
Warsaw Warsaw, officially the Capital City of Warsaw, is the capital and List of cities and towns in Poland, largest city of Poland. The metropolis stands on the Vistula, River Vistula in east-central Poland. Its population is officially estimated at ...
Express Ring Road. Conceptually forming one continuous route with motorway A2, it was initially planned (since 1970s) as a part of it, however after local Warsaw residents objected to the plans of an inner-city motorway, the proposed road was downgraded to an expressway (though the actual route was not changed). The western half of the road was opened to traffic in 2013, while the eastern half was opened in 2020 and 2021.


Chronology

Construction of the first phase of the project was divided into two sections. Work on a 3.9 km stretch between ''Warszawa Lotnisko'' junction (linking to expressway S79) and ''Puławska'' junction at the eastern end of this phase of the project began in September 2009, while construction of the other, 11.1 km long section between the western ''Konotopa'' junction (linking the motorway A2 and the western portion of the ring road, expressway S8) and ''Warszawa Lotnisko'' junction, began in the Summer of 2010. Both sections were scheduled to be completed in mid 2012 in time for the
Euro 2012 The 2012 UEFA European Football Championship, commonly referred to as UEFA Euro 2012 or simply Euro 2012, was the 14th European Championship for men's national football teams organised by UEFA. The final tournament, held between 8 June and 1 ...
football championships, however this deadline was not met. The S2 Expressway was eventually opened in a number of stages, beginning in the west at ''Konotopa'' junction in August 2013, with further sections opening in September 2013, linking the road with expressway S79 leading to Warsaw Chopin Airport. The final part of this phase of the project up to ''Puławska'' junction was opened in late September 2013. The second phase of the project took the expressway S2 east of ''Puławska'' across the
Vistula river The Vistula (; ) is the longest river in Poland and the ninth-longest in Europe, at in length. Its drainage basin, extending into three other countries apart from Poland, covers , of which is in Poland. The Vistula rises at Barania Góra ...
, through the Anna Jagiellon Bridge, connecting the route with the eastern part of the Warsaw Express Ring Road and the continuation of the motorway A2 eastwards. The design-and-build tender for this section (divided into 3 separate contracts) was announced on December 18, 2013, with completion date specified as 41 months from the date contract is signed (not counting 3 winter months). The contract was signed in December 2015, with completion planned for December 2020. The final section including the Ursynów Tunnel opened on 20 December 2021. The contracts were: * Contract A (4.6 km) including tunnel under Ursynów :
Astaldi Astaldi S.p.A. is an Italian multinational major construction company based in Rome. The group is active in the fields of civil engineering, hydraulic engineering, electromechanical engineering and transportation. Significant subsidiaries incl ...
S.p.A., price about 1 222 mln zł. * Contract B (6.45 km) including a bridge over the Vistula river: Gülermak Ağır Sanayi İnşaat ve Taahhüt A.S. and PBDiM Mińsk Maz. , price about 757.6 mln zł. * Contract C (7.45 km) including overpasses in Masovian Landscape Park: Warbud S.A. price about 561.7 mln zł. * Oversight: Egis Polska Inżynieria Sp. z o.o., price about 53.4 mln zł.


Future developments

From 2025, on the section between Wilanow and Lubelska junctions, average speed measurement devices will be installed to reduce noise pollution.


Route description


Ursynów tunnel

The Expressway S2 Tunnel () or Ursynów Tunnel () is a part of the S2 expressway in Warsaw. The tunnel began construction on 1 March 2017 and opened on 20 December 2021. The contractor was
Astaldi Astaldi S.p.A. is an Italian multinational major construction company based in Rome. The group is active in the fields of civil engineering, hydraulic engineering, electromechanical engineering and transportation. Significant subsidiaries incl ...
SpA. As of 2021, the tunnel is the longest road tunnel in Poland. From the west, the tunnel entry begins at Węzeł Ursynów Zachód junction. In the east, the tunnel joins the Węzeł Ursynów Wschód junction. The tunnel is around 2330 meters in length (some sources claim 2335 meters in length), and crosses underneath the pre-existing tunnel of the Warsaw Metro Line M1. Each of the two roadways has a width of 14.5 meters, with three traffic lanes each, and a hard shoulder 3.75 meters in width. Each roadway has a 1-meter wide emergency path.


See also

*
Highways in Poland Controlled-access highways in Poland are part of the National roads in Poland, national roads network and they are divided into motorways and Controlled-access highway, expressways. Both types of highways feature grade-separated Interchang ...
*
European route E30 European route E30 is an A-Class European route from the port of Cork (city), Cork in Republic of Ireland, Ireland in the west to the Russian city of Omsk, near the border with Kazakhstan in the east. For much of the Russian stretch, it follow ...