The European Network of Transmission System Operators for Electricity (ENTSO-E) is an association representing 40 electricity
transmission system operator File:Electricity grid simple- North America.svg, 380px, Simplified diagram of AC electricity grid from generation stations to consumers in North America rect 2 243 235 438 Power station rect 276 317 412 556 Transformer rect 412 121 781 400 Elect ...
s (TSOs) from 36 countries across Europe, thus extending beyond EU borders. It manages the
Continental Europe Synchronous Area The Continental Europe Synchronous Area (CESA), formerly known as the UCTE grid, is one of the largest synchronous electrical grids in the world, primarily operating in Europe. It is interconnected as a single phase-locked mains frequency ele ...
(CESA). ENTSO-E was established and given legal mandates by the EU's Third Package for the Internal energy market in 2009, which aims at further liberalising the gas and electricity markets in the EU. Page not dated. Ukrainian
Ukrenergo The Private JSC NEK Ukrenergo is a state-owned electricity transmission system operator in Ukraine and the sole operator of the high-voltage lines which transmit electricity in Ukraine. It is a member of the European Network of Transmission Syste ...
became the 40th member of the association on 1January 2024.


History

On 27 June 2008, 36 European electricity
transmission system operator File:Electricity grid simple- North America.svg, 380px, Simplified diagram of AC electricity grid from generation stations to consumers in North America rect 2 243 235 438 Power station rect 276 317 412 556 Transformer rect 412 121 781 400 Elect ...
s (TSOs) signed a declaration of intent in
Prague Prague ( ; ) is the capital and List of cities and towns in the Czech Republic, largest city of the Czech Republic and the historical capital of Bohemia. Prague, located on the Vltava River, has a population of about 1.4 million, while its P ...
to create the ENTSO-E. ENTSO-E was established on 19 December 2008 in
Brussels Brussels, officially the Brussels-Capital Region, (All text and all but one graphic show the English name as Brussels-Capital Region.) is a Communities, regions and language areas of Belgium#Regions, region of Belgium comprising #Municipalit ...
by 42 TSOs as a successor of six regional associations of the electricity transmission system operators. ENTSO-E became operational on 1 July 2009. The former associations ETSO, ATSOI, UKTSOA, NORDEL, UCTE and BALTSO became a part of the ENTSO-E, while still offering data by their predecessors for public interest. Until then, the Union for the Coordination of Transmission of Electricity (UCTE) was the main organization managing what is now the
Continental Europe Synchronous Area The Continental Europe Synchronous Area (CESA), formerly known as the UCTE grid, is one of the largest synchronous electrical grids in the world, primarily operating in Europe. It is interconnected as a single phase-locked mains frequency ele ...
. Creation of ENTSO-E was initiated by the adoption of the European Union third legislative package on the gas and electricity markets. In 2003, the
European Commission The European Commission (EC) is the primary Executive (government), executive arm of the European Union (EU). It operates as a cabinet government, with a number of European Commissioner, members of the Commission (directorial system, informall ...
conducted a sector inquiry concerning the competition of
electricity market An electricity market is a system that enables the exchange of electrical energy, through an electrical grid. Historically, electricity has been primarily sold by companies that operate electric generators, and purchased by consumers or electr ...
in six European countries. Examining competition in these countries, the final report stated serious issues to be solved. It was noticed that the integration between member state's markets is still insufficient. Additionally, the absence of transparently available market information was assessed. As a result, the third legislative package on the EU gas and electricity markets was adopted by the European Commission in September 2007.


Objectives

According to its website, "ENTSO-E promotes closer cooperation across Europe’s TSOs to support the implementation of
EU energy policy The energy policy of the European Union focuses on energy security, Sustainable energy, sustainability, and integrating the energy markets of member states. An increasingly important part of it is climate policy. A key energy policy adopted in ...
and achieve Europe’s energy & climate policy objectives, which are changing the very nature of the power system. The main objectives of ENTSO-E centre on the integration of renewable energy sources (RES) such as wind and solar power into the power system, and the completion of the internal energy market (IEM), which is central to meeting the European Union’s energy policy objectives of affordability, sustainability and security of supply. ..ENTSO-E aims to be the focal point for all technical, market and policy issues relating to TSOs and the European network, interfacing with power system users, EU institutions, regulators and national governments."


Members

TSOs are responsible for the bulk transmission of electric power on the main
high voltage High voltage electricity refers to electrical potential large enough to cause injury or damage. In certain industries, ''high voltage'' refers to voltage above a certain threshold. Equipment and conductors that carry high voltage warrant sp ...
electric networks. TSOs provide
grid Grid, The Grid, or GRID may refer to: Space partitioning * Regular grid, a tessellation of space with translational symmetry, typically formed from parallelograms or higher-dimensional analogs ** Grid graph, a graph structure with nodes connec ...
access to the
electricity market An electricity market is a system that enables the exchange of electrical energy, through an electrical grid. Historically, electricity has been primarily sold by companies that operate electric generators, and purchased by consumers or electr ...
players (i.e., generating companies, traders, suppliers, distributors, and directly connected customers) according to non-discriminatory and transparent rules. In many countries, TSOs are in charge of the development of the grid infrastructure, too. TSOs in the
European Union The European Union (EU) is a supranational union, supranational political union, political and economic union of Member state of the European Union, member states that are Geography of the European Union, located primarily in Europe. The u ...
internal electricity market are entities operating independently from the other electricity market players (unbundling). ENTSO-E contained 40 Member TSOs from 36 countries as of January 2024. Due to
Brexit Brexit (, a portmanteau of "Britain" and "Exit") was the Withdrawal from the European Union, withdrawal of the United Kingdom (UK) from the European Union (EU). Brexit officially took place at 23:00 GMT on 31 January 2020 (00:00 1 February ...
three Great Britain based operators left and only Northern Ireland's SONI remains from the UK. On 26 April 2022
Ukrenergo The Private JSC NEK Ukrenergo is a state-owned electricity transmission system operator in Ukraine and the sole operator of the high-voltage lines which transmit electricity in Ukraine. It is a member of the European Network of Transmission Syste ...
signed an observer membership agreement and became the 40th member of ENTSO-E on 1 January 2024. On 14 January 2016
TEİAŞ Turkish Electricity Transmission Corporation (Turkish: Türkiye Elektrik İletim A. Ş., abbreviated TEİAŞ) is the transmission system operator for electricity in Turkey. It is a government-owned corporation. It is planned for a minority stake ...
signed an agreement with ENTSO-E to become first observer member, the agreement expired in January 2019. On 13 December 2022 TEİAŞ signed a new Observer Membership Agreement that will run for a period of three years.


Observers


Geographical area

The geographical area covered by ENTSO-E's member TSOs is divided into four synchronous areas and two isolated systems (Cyprus and Iceland). Synchronous areas are groups of countries that are connected via their respective power systems. The system
frequency Frequency is the number of occurrences of a repeating event per unit of time. Frequency is an important parameter used in science and engineering to specify the rate of oscillatory and vibratory phenomena, such as mechanical vibrations, audio ...
(50 Hz, with usually very minor deviations) is synchronous within each area, and a disturbance at one single point in the area will be registered across the entire zone. Individual synchronous areas are interconnected through
direct current Direct current (DC) is one-directional electric current, flow of electric charge. An electrochemical cell is a prime example of DC power. Direct current may flow through a conductor (material), conductor such as a wire, but can also flow throug ...
interconnector An interconnector (also known as a DC tie in the USA) is a structure which enables high-voltage DC electricity to flow between electrical grids, connecting separate AC networks, or linking synchronous grids. It may be formed of submarine power ...
s. The benefits of synchronous areas include pooling of generation capacities, common provisioning of reserves, both resulting in cost-savings, and mutual assistance in the event of disturbances, resulting in cheaper reserve power costs (for instance in case of a disturbance or outage).


Legal basis

The
Third Energy Package The European Union's Third Energy Package is a legislative package for an internal gas and electricity market in the European Union. Its purpose is to further open up the gas and electricity markets in the European Union. The package was proposed ...
and Regulation (EC) No 714/2009 on conditions for access to the network for cross-border exchanges in electricity regulation stipulate ENTSO-E's tasks and responsibilities. Regulation (EU) 838/2010 on guidelines relating to the inter-TSO compensation mechanism sets out the methodology by which TSOs receive compensation for the costs incurred in hosting cross-border flows of electricity. Regulation (EU) 347/2013 on guidelines for trans-European energy infrastructure defines European Projects of Common Interest (PCIs) identifies ENTSO-E's ten-year network development plan (TYNDP) as the basis for the selection of PCIs. ENTSO-E is also mandated to develop a corresponding cost–benefit methodology for the assessment of transmission infrastructure projects. The Transparency Regulation (EU) No. 543/2013 on submission and publication of data in electricity markets makes it mandatory for European Member State data providers and owners to submit fundamental information related to electricity generation, load, transmission, balancing, outages, and congestion management for publication through the ENTSO-E Transparency Platform. ENTSOE does not class as a "public sector body" under the meaning provided in the 2019 Open Data Directive.


Key activities


Pan-European Transmission Network plans and cost–benefit analysis

The ten-year network development plan 2016 (TYNDP) is drafted by ENTSO-E, in close cooperation with stakeholders, under scrutiny of ACER and is finally adopted by the
European Commission The European Commission (EC) is the primary Executive (government), executive arm of the European Union (EU). It operates as a cabinet government, with a number of European Commissioner, members of the Commission (directorial system, informall ...
. It is the only existing pan-European network development plan. It is the basis for the selection of EU projects of common interest (PCIs). The list of PCIs is not fixed by ENTSO-E and is subject to a different process led by the European Commission and EU Member States. The TYNDP is updated every two years. For inclusion in the TYNDP, each project, whether transmission or storage, has to go through a cost–benefit analysis. The benefit analysis methodology is developed by ENTSO-E in consultation with stakeholders and adopted by the European Commission. It assesses projects against socio-economic and environmental criteria.


Adequacy Outlooks

ENTSO-E publishes summer and winter adequacy outlooks, as well as a mid-term resource adequacy assessment, the European Resource Adequacy Assessment (ERAA). The seasonal outlooks assess if there is enough generation to cover supply and highlight possibilities for neighbouring countries to contribute to the generation/demand balance in critical situations in a specific country. The ERAA analyses resource adequacy on the decade ahead, accounting for investment and retirement decisions.


Network codes

ENTSO-E's network codes are binding pan-European rules drafted by ENTSO-E in consultation with stakeholders, with guidance from ACER. Network codes are grouped in three areas: * connection codes connecting electricity generators, demand, and direct current lines to the transmission grids; * operational codes governing how the pan-European electricity systems are operated; * and market codes facilitating and harmonising electricity trading across European borders. The drafting and adoption process of network codes is defined by the Third Package. ACER develops a framework guideline setting the policy choices for each code. On this basis, the codes are drafted by ENTSO-E in consultation with stakeholders. After ACER's opinion and recommendation for adoption, each code is submitted to the
European Commission The European Commission (EC) is the primary Executive (government), executive arm of the European Union (EU). It operates as a cabinet government, with a number of European Commissioner, members of the Commission (directorial system, informall ...
for approval through the Comitology process, i.e., to be voted on by Member State representatives and thus to become EU law, directly binding and implemented across all Member States.


Transparency Platform (TP)

ENTSO-E's Central Information Transparency Platform provides free access to fundamental data and information on pan-European wholesale energy generation, transmission, and consumption. CC‑BY‑4.0 license.


Research, development, and innovation (RDI)

ENTSO-E's R&D Roadmap provides the ENTSO-E vision on grid projects to be carried out by TSOs to meet EU objectives. The roadmap is supported by the annual R&D Implementation Plan, which combines both top-down and bottom-up approaches in meeting the requirements of the roadmap. ENTSO-E publishes annually a R&D Monitoring Report that assesses the progress of TSO-related R&D work.


Governance

ENTSO-E is an international non-profit association (
AISBL Laws regulating nonprofit organizations, nonprofit corporations, non-governmental organizations, and voluntary associations vary in different jurisdictions. They all play a critical role in addressing social, economic, and environmental issues. Th ...
) established according to Belgian law. ENTSO-E is financed by its members. The TSOs contribute to the budget according to the number of countries and the population served. The highest body of ENTSO-E is the Assembly, which is composed of representatives at CEO level of all the currently 43 members. The ENTSO-E Board is elected every two years from the overall membership and through the Assembly. It includes 12 representatives. The president, vice president, and committee chairs are invited to board meetings. The board coordinates the committees and LRG work and implements Assembly decisions. ENTSO-E has established four specialized committees composed of managers from member TSOs. Each committee leads a number of regional groups and working groups. At the same level as the four committees, the transversal Legal & Regulatory Group advises all ENTSO-E bodies on legal and regulatory issues. In addition, expert groups on data, network codes implementation, and EU affairs provide specific expertise and work products to the association. ENTSO-E's Secretariat is based in Brussels. It is headed by the secretary-general and represents ENTSO-E to the European institutions, regulators, and stakeholders.


Organizational chart


Key figures (2022)

* 39 transmission system operators * 35 European countries * 532 million customers served * of transmission lines * 3,174.2 TWh electricity transported * 423,586 GWh of electricity exchange between member TSOs * 1,023,721 MW net generation capacity connected to the grid


See also

* EURELECTRIC *
Agency for the Cooperation of Energy Regulators The European Union Agency for the Cooperation of Energy Regulators (ACER) is an Agency of the European Union created under the terms of the Third Energy Package of 2009. It was established in 2010 and has its seat in Ljubljana, Slovenia. The b ...
*
European Energy Community The Energy Community, commonly referred to as the Energy Community for South East Europe (ECSEE), is an international organization consisting of the European Union (EU) and a number of non-EU countries. It aims to extend the EU internal energ ...
*
European Network of Transmission System Operators for Gas The European Network of Transmission System Operators for Gas (ENTSOG) is an association of Europe's transmission system operators (TSOs). ENTSOG was created on 1 December 2009 by 31 TSOs from 21 European countries. Creation of the ENTS ...
(ENTSOG) *
IPS/UPS The IPS/UPS (), also widely known as the Russian grid is a wide area synchronous transmission grid, the Russian Unified Power System (UPS; ) and the Integrated Power System (IPS; ) portion of the network being the national networks of Azerbaij ...
– TSO organization for the networks of most of the
former Soviet republics The post-Soviet states, also referred to as the former Soviet Union or the former Soviet republics, are the independent sovereign states that emerged/re-emerged from the dissolution of the Soviet Union in 1991. Prior to their independence, they ...
and Mongolia *
SuperSmart Grid The SuperSmart Grid (SSG) is a hypothetical wide area electricity network connecting Europe with northern Africa, the Middle East, and the IPS/UPS system of CIS countries. The system would unify super grid and smart grid capabilities into a co ...
, European super grid *
Nord Pool Nord Pool AS is a pan-European Electric power, power List of commodities exchanges, exchange. Nord Pool has its main office in Oslo and further offices in Stockholm, Helsinki, Tallinn and London. The company is owned by the European exchange o ...


References


External links

*
ENTSO-E Transparency Platform


{{Authority control Electric power in the European Union Organisations based in Brussels Pan-European energy organisations