The Enloe Dam, also known as the Similkameen Dam, and its powerplant are located on the
Similkameen River
The Similkameen River runs through southern British Columbia, Canada, eventually discharging into the Okanagan River near Oroville, Washington, in the United States. Through the Okanagan River, it drains to the Columbia River. The river is said ...
about west-northwest of
Oroville, Washington
Oroville is a city located in the northern bulk of the Okanogan Highlands in north-central Washington, United States. Oroville is a member municipality of Okanogan County, Washington situated between Omak and Penticton. The population was 1,79 ...
. Located just above Similkameen (Coyote) Falls, the concrete
arch-gravity dam stands about high, with a crest length of about , built between 1916 and 1923. The dam was named after the president of the Okanogan Valley Power Company, Eugene Enloe. The dam was operated to generate power at its powerplant, located about downstream from the dam.
Lacking fish ladders, Enloe Dam prevents salmon and other river fish from migrating farther north and into
British Columbia, Canada
British Columbia is the westernmost province of Canada. Situated in the Pacific Northwest between the Pacific Ocean and the Rocky Mountains, the province has a diverse geography, with rugged landscapes that include rocky coastlines, sandy beach ...
.
History
The dam replaced a wood crib dam started in 1903 by J.M. Hagerty, a local entrepreneur, and completed a year after his death. The dam fed a generating plant in a wooden powerplant below the dam and falls. Power went to the towns of
Nighthawk
The nighthawk is a nocturnal bird of the subfamily Chordeilinae, within the nightjar family, Caprimulgidae, which is a grouping of 92 species of medium-sized birds with long wings and short bills specialized for eating insects. The nighthawk's ...
and
Oroville, as well as the nearby Owasco, Ivanhoe, Ruby and Canba mines. Attempts by Hagerty's estate to sell the dam in 1913 met no interest, partly because of the poor state of the crib dam. Eugene Enloe of the Okanogan Valley Power Company was able to secure the rights to the site in 1916, hiring C.F. Uhden to design the dam that year. Construction did not start until 1919 and was completed in 1920 at a cost of $350,000, $150,000 of it Enloe's money. Enloe sold the dam and powerplant in 1923 to
Washington Water Power Company, which added a second penstock.
Description
The dam features an unregulated overflow spillway whose height can be augmented by flashboards. The powerplant replaced a small
run-of-river
Run-of-river hydroelectricity (ROR) or run-of-the-river hydroelectricity is a type of hydroelectric generation plant whereby little or no water storage is provided. Run-of-the-river power plants may have no water storage at all or a limited amou ...
plant, which received water from a diversion channel. In 1923, the site was purchased by the Washington Water Power Company. In 1942 the WWPC was purchased by the Okanogan Public Utility District, which then ceased operations at Enloe Dam in 1958, as power was available from the
Bonneville Power Administration
The Bonneville Power Administration (BPA) is an American federal agency operating in the Pacific Northwest. BPA was created by an act of United States Congress, Congress in 1937 to market electric power from the Bonneville Dam located on the Col ...
system
[ at less cost. The dam's reservoir extends up the Similkameen River. Largely silted up, it is just deep.] Storage capacity is only .
The concrete powerhouse is in a partly ruinous state, and options have been presented to stabilize or demolish the structure when the proposed new hydroelectric development is undertaken. The powerhouse was fed by two wood stave penstocks, in diameter, running to Pelton wheel
The Pelton wheel or Pelton Turbine is an Impulse (physics), impulse-type water turbine invented by American inventor Lester Allan Pelton in the 1870s. The Pelton wheel extracts energy from the impulse of moving water, as opposed to water's dead w ...
s driving two 1.6 megawatt generators. The generator hall stands next to a heavily built transformer vault.[
]
Redevelopment
The Okanogan Public Utility District obtained a new license for power generation from the Federal Energy Regulatory Commission
The Federal Energy Regulatory Commission (FERC) is an independent agency of the United States government that regulates the interstate transmission and wholesale sale of electricity and natural gas and regulates the prices of interstate transport ...
in 1983, but the license was withdrawn in 1986 because the dam's impact on anadromous fish had not been addressed. A second license for a 4.1 megawatt plant was granted in 1996, but was again rescinded on the same grounds in 2000.[ Yet another application was submitted in August 2008, seeking to build a new powerplant to generate 9 megawatts, fed by a new intake channel.]
Enloe Dam was listed on the National Register of Historic Places
The National Register of Historic Places (NRHP) is the Federal government of the United States, United States federal government's official United States National Register of Historic Places listings, list of sites, buildings, structures, Hist ...
on October 18, 1978 as an example of early power development in rural Washington.
After a study showing reenergizing the dam would be too expensive, the Okanogan PUD voted in 2019 to abandon plans. They are seeking to give the dam away to have it demolished, but removal remains too expensive. The Colville Indian tribes are seeking its removal to restore salmon to the Similkameen River.
References
External links
*
*
{{authority control
Dams in Washington (state)
Buildings and structures in Okanogan County, Washington
Dams completed in 1920
Dams on the National Register of Historic Places in Washington (state)
Energy infrastructure completed in 1920
Historic American Engineering Record in Washington (state)
United States local public utility dams
National Register of Historic Places in Okanogan County, Washington