2011 / 2012: Monkey house and exhibit
Starting in April/May 2010 the monkey house and the surrounding area will undergo extensive construction. This includes the demolition of the small monkey house (home of theTemporary housing
According to the '' Basler Zeitung'' online on 10 March 2010, the orangutans left Basel. The gorillas and 150 other smaller monkey found a temporary home on an unidentified Novartis site in Basel. On 14 April 2010, '' Basler Zeitung'' reported that all apes left the zoo. All monkeys returned before the monkey house opening on 30 June 2011 - except the orangutans and the woolly monkeys. Die Zolli-Affen sind zurück im HausTime table
All projects are completed, with the exception of the opening of the five large outdoor cages. This, final phase, is scheduled to open on 28 September 2012.2014: Restaurant renovation and expansion
The renovation is scheduled to start in 2013 and just before Easter 2014 the restaurant, at least partially, will be re-opened. During renovation it is planned to continue restaurant services in tents.2016: New elephant house
The current elephant house (constructed in 1953) is due to be renovated and expanded. Planned are boxes for the females, a larger outdoor male area, and overall expansion of the area towards the old kangaroo exhibit. Because of an estimated 24-million-Swiss-franc donation for the monkey expansion project, Zoo Basel is able to finance this project. According to ''Basler Zeitung'' from 12 May 2010, the elephant house will be expanded before the Ozeanium project. On 21 June 2012 Zoo Basel's board of directors approved this project. Under the theme "mobility," a new exhibit is planned on the current elephant exhibit. According to Oliver Pagan, zoo director, this exhibit will be larger than the current elephant exhibit and include the old kangaroo exhibit, the playground adjacent to the elephant house, and the lemurs exhibit. The new elephant exhibit will have three parts: one for the male and two for females. Construction is scheduled to start in 2013 and is planned to conclude in 2016.2018: Ozeanium (additional aquarium)
On 17 March 2009 Zoo Basel announced its intent to build Switzerland's first large-scale ocean aquarium. Mainly through private donors, a 70-million-Swiss-franc building is planned to be built on the Heuwaage square and will extend into the downtown nightlife strip of ''Steinen''. It is scheduled to open in 2018.Future animals
The building will host several thousand animals from all five large oceans in tanks that are up to 8 metres and a diameter of up to 30 metres. Among these animals are planned to be sharks, coral reefs, large octopuses, and penguins.House description
The building will have four floors: One underground, on ground level, and two above ground. It will have a themed restaurant and shops that will be opened beyond the regular zoo hours.Aquarium in Middle Europe
Zoo Basel's proposal would be the only large scale aquarium in Switzerland in middle Europe. According to Zoo Basel, similar ocean aquariums are over away. Among them in Arnhem ( Netherlands), Genoa ( Italy),Panda exhibit
In the long run, Zoo Basel would like to acquire rareOther area expansion possibilities
Since 1961, the zoo has not grown in area.OZEANIUM ALS ZENTRUM DER BEGEGNUNG UND BILDUNG, http://www.zoobasel.ch/aktuell/index.php?PHPSESSID=cc20d3ec939135820a98670a3be2b888 Zoo BaselAsia theme area
There is a possibility to expand east across the Birsig river. This would allow additional space for the giant pandas and other exhibits in the Sauter Garden.Parking space
In various Basler Zeitung publications, a possible expansion to the north (Nachtigallen Wäldchen) was mentioned. A possible scenario would have demolished the parking facilities and moved them to another place, possibly a car park underneath the street just east of the current parking area, underneath the Erdbeerestreet.Past projects
Shelved
*Polaris: an arctic- andConstructed
*On 30 June 2011 the enlarged monkey house opened. While visitors have the same amount of space available, the apes' space more than double from to . The old outer walls were torn down and the living quarters were extended in depth and height. Eventually, there will be additional compartments with no public access, a service tunnel, worker quarters, and restrooms added.References