Deriner Dam ( tr, Deriner Barajı) is a concrete double-curved arch dam on the Çoruh River east of Artvin in Artvin Province, Turkey. The main purpose of the dam is
hydroelectric Hydroelectricity, or hydroelectric power, is electricity generated from hydropower (water power). Hydropower supplies one sixth of the world's electricity, almost 4500 TWh in 2020, which is more than all other renewable sources combined and ...
power production and additionally flood control. Construction on the dam began in 1998, the reservoir began to fill in February 2012 and the power station was completed by February 2013. It will have a 670 MW power house and is the tallest dam in Turkey. The dam is being implemented by Turkey's State Hydraulic Works and constructed by a consortium of Turkish, Russian and Swiss companies. The dam is named after İbrahim Deriner, who died while serving as the Chief Engineer of its research team.


Background

In 1969, a survey of the energy potential of the Coruh River was carried out by the Electrical Power Resources Survey Administration and later potential dam foundations were investigated. Based on the studies and investigations, a master plan for the river was started in 1979 and completed in 1982. The feasibility study for the Deriner Dam was not completed until 1987 and was carried out by the Swiss branch of Poyry Energy and Turkey's Dolsar Engineering. Several factors delayed construction of the dam during this period. The cost of relocating roads in such a mountainous area would be high and the need for
agricultural Agriculture or farming is the practice of cultivating Plant, plants and livestock. Agriculture was the key development in the rise of Sedentism, sedentary human civilization, whereby farming of Domestication, domesticated species created food ...
, not electric development was deemed a higher priority. As the demand for electricity in Turkey grew, the Çoruh Valley Project began its implementation. After negotiations and the signing of a protocol between the Turkish and Russian governments at the 1994 Turkish-Russian Mixed Economic Commission in Moscow, Turkey's State Hydraulic Works was authorized to move forward with the dam. The consortium started with the Russian company Technostroyexport and later expanded with Turkey's ERG Construction and the Swiss companies Stucky (engineering consulting), Andritz (turbines and hydromechanical works) and
Alstom Alstom SA is a French multinational rolling stock manufacturer operating worldwide in rail transport markets, active in the fields of passenger transportation, signalling, and locomotives, with products including the AGV, TGV, Eurostar, Avelia ...
(generators, energy transmission and balance-of-plant). The Environmental Impact Assessment Report for the dam was completed and approved in 1995 and funding to begin the project was available in 1997. In 1998, the consortium received the site and construction commenced.


Construction

Construction on the Deriner Dam began in January 1998, and by the end of 2005, the Coruh River had been diverted around the construction site and the dam's foundation was excavated and prepared. The river was diverted on the right-bank by means of a horseshoe-shaped tunnel with a diameter. The foundation required extensive excavation because layers of decompressed rock existed above the sound granodiorite rock. To secure the foundation, over 2,000 re-stressable post-tensioned rock anchors were installed. At the end of 2005, workers began pouring concrete for the dam's foundation but because of funding, this was delayed between September 2006 and September 2007. By January 2008, the dam reached a height of . By mid-2010, of the needed of concrete had been poured and 93% of the project was complete. The spillways within the dam's body were complete as well. On 24 February 2012, the dam was complete and began to impound its reservoir. The power station is expected to be operational by February 2013.


Specifications


Dam

The Deriner Dam is a high, long double-curved arch dam. It has a base width of and a crest width at the top cantilever of . A total of of concrete forms the dam's body which also contains its orifice spillway. This spillway consists of 8 x flap gates that can discharge a maximum of of water. The dam's other spillway consists of two tunnels, each on opposing banks behind the dam. The right tunnel is long and the left is long. Each tunnel is controlled by a high, long flap gate. Each of these tunnels have the same capacity as both combined can discharge up to of water. The reservoir behind the dam has a catchment area of , capacity of and regulating volume of .


Power house

The dam's power house is located underground on its right bank and has a width of , length of and height of . Contained in the power house are vertical
Francis turbine The Francis turbine is a type of water turbine. It is an inward-flow reaction turbine that combines radial and axial flow concepts. Francis turbines are the most common water turbine in use today, and can achieve over 95% efficiency. The proces ...
s that have a combined capacity of 670 MW and annual generation of 2,118 GWh. Water being transferred to the turbines does so by means of a diameter penstock. Once through the turbines, water exits the powerhouse via long horseshoe shaped tail-race tunnels.


See also

* Borçka Dam – downstream * Artvin Dam – upstream * List of dams and reservoirs in Turkey *
List of tallest dams in the world This is a list of the tallest dams in the world over in height. The tallest dam in the world is the Jinping-I Dam, an arch dam in China at . The tallest embankment dam and second tallest dam in the world is the Nurek Dam in Tajikistan. The tall ...


References

{{Power stations in Turkey Dams in Artvin Province Hydroelectric power stations in Turkey Dams on the Çoruh River Arch dams Dams completed in 2012 2013 establishments in Turkey Energy infrastructure completed in 2013