A crane vessel, crane ship, crane barge, or floating crane is a
ship A ship is a large watercraft, vessel that travels the world's oceans and other Waterway, navigable waterways, carrying cargo or passengers, or in support of specialized missions, such as defense, research and fishing. Ships are generally disti ...
with a crane specialized in lifting heavy loads, typically exceeding for modern ships. The largest crane vessels are used for
offshore construction Offshore construction is the installation of structures and facilities in a marine environment, usually for the production and transmission of electricity, oil, gas and other resources. It is also called maritime engineering. Construction a ...
. The cranes are fitted to conventional
monohull right A monohull is a type of boat having only one hull, unlike multihulled boats which can have two or more individual hulls connected to one another. Fundamental concept Among the earliest hulls were simple logs, but these were generally unstab ...
s and
barge A barge is typically a flat-bottomed boat, flat-bottomed vessel which does not have its own means of mechanical propulsion. Original use was on inland waterways, while modern use is on both inland and ocean, marine water environments. The firs ...
s, but the largest crane vessels are often
catamaran A catamaran () (informally, a "cat") is a watercraft with two parallel hull (watercraft), hulls of equal size. The wide distance between a catamaran's hulls imparts stability through resistance to rolling and overturning; no ballast is requi ...
or
semi-submersible Semi-submersible may refer to a self-propelled vessel, such as: *Heavy-lift ship, which partially submerge to allow their cargo (another ship) to float into place for transport *Narco-submarine, some of which remained partially on the surface *S ...
types which provide enhanced stability and reduced platform motion. Many crane vessels are fitted with one or more rotating cranes. Some of the largest crane vessels use fixed sheerlegs instead; in these designs, the crane cannot rotate relative to the ship, and the vessel must be manoeuvered to place loads. Other vessels use large
gantry crane A gantry crane is a Crane (machine), crane built atop a wikt:gantry, gantry, which is a structure used to straddle an object or workspace. They can range from enormous "full" gantry cranes, capable of lifting some of the heaviest loads in the wor ...
s and straddle the load.


Types

There are several major configurations of crane vessel, usually with overlapping ranges of functionality, but each has at least one major advantage over the others in some circumstances, and consequently all these arrangements coexist.


Crane ships

Conventional seagoing self propelled monohulls with heavy lift crane equipment.


Sheer-legs barges

A Sheer-legs barge is a barge with sheer-legs mounted at one end, which can lift loads and luff the sheer-legs to adjust the reach, but cannot swing the load independently of the hull orientation. A typical arrangement has a substantial
A-frame An A-frame is a basic structure designed to bear a Structural load, load in a lightweight economical manner. The simplest form of an A-frame is two similarly sized Beam (structure), beams, arranged in an angle of 45 degrees or less, attached a ...
hinged at the stern, supported by stays to the bow. When the load has been lifted, the barge is maneuvered to the position where the load is to be lowered by onboard thrusters or tugs, and the load is lowered. A sheer-legs barge always keeps the load in the line of maximum static stability, and may use ballasting at the bow to increase longitudinal righting moment to compensate for the load. The sheer-legs arrangement is more economical to manufacture and maintain than a slewing crane, but may be less convenient as the whole vessel must be moved to precise position for lifting and lowering. It is usual to luff the sheer-legs before lifting to a position suitable for both lifting and setting the load, as luffing under load is generally slow, and there is seldom any need.


Hammerhead crane barges

A heavy lift hammerhead crane barge has a fixed hammerhead crane, which neither slews nor luffs, but has a constant reach. They are operated in a similar way to sheer-legs barges. This arrangement may be mounted on a catamaran barge which allows it to straddle a bridge pier to lower a prefabricated section into place.


Catamaran gantry cranes

Catamaran A catamaran () (informally, a "cat") is a watercraft with two parallel hull (watercraft), hulls of equal size. The wide distance between a catamaran's hulls imparts stability through resistance to rolling and overturning; no ballast is requi ...
heavy lift barges that consist of two barges connected by
gantry crane A gantry crane is a Crane (machine), crane built atop a wikt:gantry, gantry, which is a structure used to straddle an object or workspace. They can range from enormous "full" gantry cranes, capable of lifting some of the heaviest loads in the wor ...
s across the top have been used in sheltered water like harbours and rivers. To reduce listing moments on the barges, the gantries may be attached to the hulls by pinned joints at the ends, allowing some independent roll. The gantry trusses are usually fitted at both ends of the barges, allowing lifts of long loads.


Semi-submersibles

Semi-submersible crane platforms have advantages where the water is too deep or the bottom composition unsuitable for a jack-up, and the water conditions are frequently too rough for efficient use of conventional hulls. The semi-submersible hull form has a lesser and slower response to waves and swell, due to reduced waterplane area, and
stability Stability may refer to: Mathematics *Stability theory, the study of the stability of solutions to differential equations and dynamical systems ** Asymptotic stability ** Exponential stability ** Linear stability **Lyapunov stability ** Marginal s ...
and righting moment are adjustable by ballasting to suit the load. The gaps between the columns also allow waves to pass between then with little impact on the vessel. Disadvantages are lower inherent stability, and much greater cost and complexity. The low waterplane area causes a low heave response, and this can be utilised to function as a tension leg platform by using vertical mooring lines to anchor piles or clump weights on the seabed sufficient to prevent heave in the prevailing sea state. In this configuration heave sensitive operations can be done with precision and control.


Revolving derrick barge

A revolving derrick barge is a slewing crane mounted on a barge, which can be rotated independently of the hull when carrying a load. These are highly versatile, but also expensive, complex, and have some limitations, particularly in the sea states in which they can safely operate. They are usually operated from a fixed position, and use the slewing and luffing capabilities of the derrick to position the crane tip for picking and setting the load The arrangement is a compromise of structural and stability requirements balanced against reach versatility, load capacity, and cost. One of the advantages of the slewing derrick is the ability to reach loads carried on the deck of the vessel itself. Compared to land-based cranes, the additional dynamic loads and motion in a seaway complicate the operation and safety. Position and movement of the boom tip are affected by all six degrees of freedom, magnified by distance from the centres of motion of the vessel, and varying during a lifting operation as the position of the tip is moved relative to the vessel.


Jack-up construction barge

A Jack-up construction barge is a barge fitted with four to eight legs, each with a jacking system that can grip the leg and move it up or down relative to the hull, lock it in place and move back along the leg to grip it again for a further jacking operation. The hull is lifted clear of the wave tops in the working position, and the mass of the barge and any additional load is supported by the bases of the legs, which should preferably spread the load as evenly as possible. During the jack-up operation the barge is secured in place by a taut mooring spread of anchors. Once at working height the legs can be released one at a time and driven deeper with pile driving hammers for greater stability. Removal is basically a similar procedure in reverse, with the legs being pulled out of the bottom ground one at a time after the hull is afloat, while the anchor spread limits side forces imposed by waves. Water jetting, sustained tension, and/or low pressure water injection at the base of the leg may be used to release firmly embedded legs. These rigs are free from motion response to sea conditions, but need occasional calm conditions to move. Performance is strongly dependent on seabed characteristics.


Capacity

The three main measures of capacity are load, reach, and lift height. Other factors of importance are hull draught, depth to which the hook can be lowered (for offshore work), and sea state limits for transit and lifting.


Operation and safety

The interaction of the
six degrees of freedom Six degrees of freedom (6DOF), or sometimes six degrees of movement, refers to the six mechanical degrees of freedom of movement of a rigid body in three-dimensional space. Specifically, the body is free to change position as forward/backw ...
of the vessel, the response to the sea state and wind, and the position and motion of the upper block due to crane geometry and operational motion, can make the upper block describe a complex three-dimensional path in space. The load path is even more complex, and there may be various
resonances Resonance is a phenomenon that occurs when an object or system is subjected to an external force or vibration whose frequency matches a resonant frequency (or resonance frequency) of the system, defined as a frequency that generates a maximu ...
of vessel, crane and load which must be managed, generally by passing through those conditions as soon as reasonably practicable, but
motion compensation Motion compensation in computing is an algorithmic technique used to predict a frame in a video given the previous and/or future frames by accounting for motion of the camera and/or objects in the video. It is employed in the encoding of video ...
systems may help at times. Accelerations, jerk loads and impacts between the load and surroundings must be minimised and limited to levels which do not cause unacceptable damage. Some of these responses are inherent to the combination of vessel, crane and load, and others depend on sea state and wind forces. Pick up and set down are the critical stages for impact loads. During pickup there may be relative movement between the support on which the load stands and the hook, and if the load cannot be lifted clear before the gap closes, there will be impact. Similarly when setting the load down, it should be done as smoothly as possible, and once in contact should be allowed to settle as soon as possible to avoid re-lifting and pounding on the base structure.


Applications

*
Coastal engineering Coastal engineering is a branch of civil engineering concerned with the specific demands posed by constructing at or near the coast, as well as the development of the coast itself. The fluid dynamics, hydrodynamic impact of especially wind wave, ...
*
Offshore construction Offshore construction is the installation of structures and facilities in a marine environment, usually for the production and transmission of electricity, oil, gas and other resources. It is also called maritime engineering. Construction a ...
*
Marine salvage Marine salvage is the process of recovering a ship and its cargo after a shipwreck or other maritime casualty. Salvage may encompass towing, lifting a vessel, or effecting repairs to a ship. Salvors are normally paid for their efforts. Howev ...


History

In
medieval In the history of Europe, the Middle Ages or medieval period lasted approximately from the 5th to the late 15th centuries, similarly to the post-classical period of World history (field), global history. It began with the fall of the West ...
Europe, crane vessels which could be flexibly deployed in the whole port basin were introduced as early as the 14th century. During the
age of sail The Age of Sail is a period in European history that lasted at the latest from the mid-16th (or mid-15th) to the mid-19th centuries, in which the dominance of sailing ships in global trade and warfare culminated, particularly marked by the int ...
, the sheer hulk was used extensively as a floating crane for tasks that required heavy lift. At the time, the heaviest single components of ships were the main masts, and sheer hulks were essential for removing and replacing them, but they were also used for other purposes. Some crane vessels had
engine An engine or motor is a machine designed to convert one or more forms of energy into mechanical energy. Available energy sources include potential energy (e.g. energy of the Earth's gravitational field as exploited in hydroelectric power ge ...
s for propulsion, others needed to be towed with a
tugboat A tugboat or tug is a marine vessel that manoeuvres other vessels by pushing or pulling them, with direct contact or a tow line. These boats typically tug ships in circumstances where they cannot or should not move under their own power, suc ...
. In 1920, the 1898-built
battleship A battleship is a large, heavily naval armour, armored warship with a main battery consisting of large naval gun, guns, designed to serve as a capital ship. From their advent in the late 1880s, battleships were among the largest and most form ...
was converted to a crane ship when a crane with a capacity of 250 tons was installed. Later it was renamed ''Crane Ship No. 1''. It was used, amongst other things, to place guns and other heavy items on other battleships under construction. Another remarkable feat was the raising of the
submarine A submarine (often shortened to sub) is a watercraft capable of independent operation underwater. (It differs from a submersible, which has more limited underwater capability.) The term "submarine" is also sometimes used historically or infor ...
in 1939. In 1942, the crane ships a.k.a. "Heavy Lift Ships" SS ''Empire Elgar'' ( PQ 16), SS ''Empire Bard'' ( PQ 15), and SS ''Empire Purcell'' (PQ 16) were sent to the Russian Arctic ports of Archangelsk,
Murmansk Murmansk () is a port city and the administrative center of Murmansk Oblast in the far Far North (Russia), northwest part of Russia. It is the world's largest city north of the Arctic Circle and sits on both slopes and banks of a modest fjord, Ko ...
and Molotovsk (since renamed Sererodvinsk). Their role was to enable the unloading of the Arctic convoys where port installations were either destroyed by German
bomber A bomber is a military combat aircraft that utilizes air-to-ground weaponry to drop bombs, launch aerial torpedo, torpedoes, or deploy air-launched cruise missiles. There are two major classifications of bomber: strategic and tactical. Strateg ...
s or were non existent (as at Bakaritsa quay Archangel). In 1949, J. Ray McDermott had ''Derrick Barge Four'' built, a barge that was outfitted with a revolving crane capable of lifting 150 tons. The arrival of this type of vessel changed the direction of the
offshore construction Offshore construction is the installation of structures and facilities in a marine environment, usually for the production and transmission of electricity, oil, gas and other resources. It is also called maritime engineering. Construction a ...
industry. Instead of constructing
oil platform An oil platform (also called an oil rig, offshore platform, oil production platform, etc.) is a large structure with facilities to extract and process petroleum and natural gas that lie in rock formations beneath the seabed. Many oil platforms w ...
s in parts, jackets and decks could be built onshore as modules. For use in the shallow part of the
Gulf of Mexico The Gulf of Mexico () is an oceanic basin and a marginal sea of the Atlantic Ocean, mostly surrounded by the North American continent. It is bounded on the northeast, north, and northwest by the Gulf Coast of the United States; on the southw ...
, the cradle of the offshore industry, these barges sufficed. In 1963, Heerema converted a Norwegian tanker, ''Sunnaas'', into a crane vessel with a capacity of 300 tons, the first one in the offshore industry that was ship-shaped. It was renamed ''Global Adventurer''. This type of crane vessel was better adapted to the harsh environment of the
North Sea The North Sea lies between Great Britain, Denmark, Norway, Germany, the Netherlands, Belgium, and France. A sea on the European continental shelf, it connects to the Atlantic Ocean through the English Channel in the south and the Norwegian Se ...
.


Semi-submersible giants

In 1978, Heerema had two semi-submersible crane vessels built, and , each with one 2,000
ton Ton is any of several units of measure of mass, volume or force. It has a long history and has acquired several meanings and uses. As a unit of mass, ''ton'' can mean: * the '' long ton'', which is * the ''tonne'', also called the ''metric ...
and one 3,000 ton crane. Later both were upgraded to a higher capacity. This type of crane vessel was much less sensitive to sea swell, so that it was possible to operate on the North Sea during the winter months. The high
stability Stability may refer to: Mathematics *Stability theory, the study of the stability of solutions to differential equations and dynamical systems ** Asymptotic stability ** Exponential stability ** Linear stability **Lyapunov stability ** Marginal s ...
also allowed for heavier lifts than was possible with a monohull. The larger capacity of the cranes reduced the installation time of a platform from a whole season to a few weeks. Inspired by this success similar vessels were built. In 1985 ''DB-102'' was launched for McDermott, with two cranes with a capacity of 6,000 tons each. Micoperi ordered ''M7000'' in 1986, designed with two cranes of 7,000 tons each. However, due to an oil glut in the mid 1980s, the boom in the offshore industry was over, resulting in collaborations. In 1988, a
joint venture A joint venture (JV) is a business entity created by two or more parties, generally characterized by shared ownership, shared returns and risks, and shared governance. Companies typically pursue joint ventures for one of four reasons: to acce ...
between Heerema and McDermott was formed, HeereMac. In 1990 Micoperi had to apply for bankruptcy. Saipem – in the beginning of the 1970s a large heavy lift contractor, but only a small player in this field at the end of the 1980s – acquired ''M7000'' from Micoperi in 1995, later renaming it . In 1997 Heerema took over ''DB-102'' from McDermott after discontinuation of their joint venture. The ship was renamed and subsequently was upgraded in 2000 to a lifting capacity of twice 7,100 tons. ''Thialf'' can use both cranes in tandem to lift at a radius of ; in comparison, ''Saipem 7000'' can use both cranes to lift a smaller load of at a wider radius of .


Lifting records

A heaviest single lift record was set in 2000 by ''Thialf'' for lifting the Shearwater topsides for Shell. ''Saipem 7000'' set a new record in October 2004 for the lift of Sabratha Deck. Under dynamic positioning, ''Saipem 7000'' set another record in 2010 by lifting the BP Valhall Production topsides. Shortly after it was completed, ''Sleipnir'' completed a record lift of for the topsides of the Leviathan project for Noble Energy, in September 2019.


Heavy lift vessels


See also

* Ajax (crane barge) lift 250 tons used at
Panama Canal The Panama Canal () is an artificial waterway in Panama that connects the Caribbean Sea with the Pacific Ocean. It cuts across the narrowest point of the Isthmus of Panama, and is a Channel (geography), conduit for maritime trade between th ...
*
Derrick A derrick is a lifting device composed at minimum of one guyed mast, as in a gin pole, which may be articulated over a load by adjusting its Guy-wire, guys. Most derricks have at least two components, either a guyed mast or self-supporting tower ...
* Jackup rig * List of historical harbour cranes


References


External links

* ''A Gigantic Muscle of Steel: it picks up a sunken tugboat from the harbor bottom as easily as you'd lift ten pounds off the floor'',
Popular Science Popular science (also called pop-science or popsci) is an interpretation of science intended for a general audience. While science journalism focuses on recent scientific developments, popular science is more broad ranging. It may be written ...
monthly, February 1919, page 67, Scanned b
Google Books
{{Authority control Floating cranes Ship types Cranes (machines)