Connaught Bridge Power Station
   HOME

TheInfoList



OR:

Connaught Bridge Power Station is a combined cycle (2 gas turbines and 1 steam turbine) and open cycle (4 gas turbines) power station located near Kampong Java in Klang,
Selangor Selangor ( ; ), also known by the Arabic language, Arabic honorific Darul Ehsan, or "Abode of Sincerity", is one of the 13 states of Malaysia. It is on the west coast of Peninsular Malaysia and is bordered by Perak to the north, Pahang to the e ...
,
Malaysia Malaysia is a country in Southeast Asia. Featuring the Tanjung Piai, southernmost point of continental Eurasia, it is a federation, federal constitutional monarchy consisting of States and federal territories of Malaysia, 13 states and thre ...
. It is one of the oldest power station in the country. It was opened on 26 March 1953 by the High Commissioner for the Federation of Malaya, Sir
Gerald Templer Field marshal (United Kingdom), Field Marshal Sir Gerald Walter Robert Templer (11 September 1898 – 25 October 1979) was a senior British Army officer. He fought in both the world wars and took part against the 1936–1939 Arab revolt in Pales ...
.


Capacity

The Station has an installed generation capacity of 895 MW, the third largest of seven sister TNB power plants in the country. The power is produced through a combined-cycle block producing 315 MW, and 4 x GT13E1 open cycle gas turbines of 130 MW each. As part of the Generation Division of the
Tenaga Nasional Tenaga Nasional Berhad (, abbreviated as TNB; TENA, ), also known as Tenaga Nasional or simply Tenaga, is the Malaysian multinational corporation, multinational electricity company and is the only electric utility company in Peninsular Malaysi ...
Group of Malaysia, it shares and operates in support of the parent group's targets and objectives.


Redevelopment

The Connaught Bridge Power Station is going through a redevelopment project. The EPC contract was awarded to Sinohydro Corporation Ltd and Sinohydro Corporation (M) Sdn Bhd Consortium on 2 May 2013 with a contract period of 28 months. After the redevelopment, the plant with capacity of 384.7 MW will commence operation on 1 September 2015.


Access

The power station is near
Bukit Badak Komuter station , name = Bukit Badak , type= Commuter rail station , image = Bukit Badak KTM Station signboard.jpg , image_caption = , address = Jalan Bukit Badak, 41000 Klang, Selangor , line = Port Klang Branch , coordinates = , ...
.


References

Energy infrastructure completed in 1953 1953 establishments in Malaya Natural gas-fired power stations in Malaysia Klang (city) {{powerstation-stub