Chutak Hydroelectric Plant
   HOME

TheInfoList



OR:

The Chutak Hydroelectric Plant is a
run-of-the-river Run-of-river hydroelectricity (ROR) or run-of-the-river hydroelectricity is a type of hydroelectric generation plant whereby little or no water storage is provided. Run-of-the-river power plants may have no water storage at all or a limited amou ...
power project on the Suru River (a tributary of
Indus The Indus ( ) is a transboundary river of Asia and a trans- Himalayan river of South and Central Asia. The river rises in mountain springs northeast of Mount Kailash in the Western Tibet region of China, flows northwest through the dis ...
) in
Kargil district Kargil district is a district in Indian-administered Ladakh in the Kashmir#Dispute, disputed Kashmir-region,The application of the term "administered" to the various regions of Kashmir and a mention of the Kashmir dispute is supported by the ...
in the Indian union territory of
Ladakh Ladakh () is a region administered by India as a union territory and constitutes an eastern portion of the larger Kashmir region that has been the subject of a Kashmir#Kashmir dispute, dispute between India and Pakistan since 1947 and India an ...
. The barrage of the project is at Sarze village and the powerhouse is located on the right bank of the Suru near Chutak village. The project construction began on 23 September 2006, and the first three generators were commissioned in November 2012. The fourth was commissioned in January 2013. The project included construction of a barrage, having 15 m height above the crest level, an underground powerhouse, and 3.3 m dia and 10.02 km long head race tunnel and installation of four nos. of vertical Francis turbine of 11 MW each. The project utilises a gross head of to generate 216.41 GWh in a 90% dependable year with an installed capacity of 44 MW. Each 11 MW underground generating unit was designed to operate under a rated head of 52 m and a rated discharge of 24.05 cubic metres per second. The barrage diverts water from the river and involves a flooding of only . Thus the power density is 44 MW per 0.135 km2, i.e. very high 326 W/m2, compared to dam-based hydroelectric projects. The project will be connected to the Northern Grid by the 220 kV Leh-Srinagar transmission line, which is to be scheduled for commissioning along with project’s commissioning. The project was developed by M/s National Hydroelectric Power Corporation Ltd. The generating equipment was supplied, erected and commissioned by M/
Bharat Heavy Electricals Limited
The generator/turbine was manufactured by BHEL's Bhopal unit whereas the controls were supplied by BHEL's Bangalore unit. The erection and commissioning was done by BHEL'
Power Sector
As of date all four generating units of this project are running successfully. The project, along with the Nimoo Bazgo Hydroelectric Plant, was certified as compliant with the
Indus Waters Treaty The Indus Water Treaty (IWT) is a water-distribution treaty between India and Pakistan, arranged and negotiated by the World Bank, to use the water available in the Indus River and its tributaries. It was signed in Karachi on 19 September 196 ...
by the Indian Central Water Commission, with the project information passed over to Pakistan.


References

{{authority control Dams completed in 2014 Energy infrastructure completed in 2014 Dams in Ladakh Run-of-the-river power stations Dams in the Indus River basin Power stations in Ladakh 2012 establishments in Jammu and Kashmir