Centennial Concert Hall is a 2,305-seat
performing arts centre located at 555 Main Street in
downtown Winnipeg, Manitoba, Canada, as part of the
Manitoba Centennial Centre. The concert hall opened on March 25, 1968.
It is the performing home of the
Winnipeg Symphony Orchestra (WSO), the
Royal Winnipeg Ballet, as well as the
Manitoba Opera.
History
It began as an
urban renewal
Urban renewal (sometimes called urban regeneration in the United Kingdom and urban redevelopment in the United States) is a program of land redevelopment often used to address real or perceived urban decay. Urban renewal involves the clearing ...
program in 1960. The Centennial Concert Hall, as part of the
Manitoba Centennial Centre, was built as a Canadian Centennial project and is connected to the
Manitoba Museum. The venue has a seating capacity of 2,305. The stage is wide, deep and over tall which can accommodate a full orchestra and a choir of 700.
The Centennial Concert Hall supports Manitoba visual artists through monthly exhibitions on the Piano Nobile, the Gallery has featured the creations of over 200 Manitoba artists. This spacious area overlooking the main lobby offers high ceilings, majestic chandeliers and a grand piano. Murals by Canadian sculptor
Greta Dale and Winnipeg artist Tony Tascona occupy spaces throughout the hall.
Centennial Concert Hall also hosts a wide variety of local and global artists, dance companies and musicals.
After 47 years it was decided to replace and upgrade the aging lighting system with LED technology. Initially at first there was reservation as to whether the LED system would throw enough light onto the stage. The new ArcSystem lighting was installed in 2015.
By the spring of 2016 the acoustic shell, the movable wall portion of the stage that helps to amplify sounds coming from the orchestra was in need of major repairs. The mechanical system that lifts the walls up and out of the way when not in use were deemed to be dangerous to operate, lest it come crashing down. The acoustic shell has not operated since that time, until it is repaired or replaced. In the interim, amplification/reverb is created electronically.
A Conceptual Development Plan was published in 2017. In it the MCCC will add another venue so that travelling shows could still use the Concert Hall while the WSO plays at a new Music Hall simultaneously.
It was discovered in the spring of 2019 that the roof of the concert hall needs $15 million worth of roof repairs to the 51 year old venue. At the time, the lobby ceiling was constructed with asbestos. The Province has set aside funds to help pay for the repairs of the roof.
Construction
Governor General Roland Michener opened the Centennial Concert Hall 25 March 1968.
The architects of the Hall were Green, Blankstein, Russell Assoc., Moody, Moore, Whenham & Partners, and Smith, Carter, Searle Associates, which are all located in Winnipeg. Theatre consultant
George Izenour contributed to the design of the hall, and the acoustic engineering was by the firm of Bolt, Beranek & Newman Inc. The Winnipeg Architecture Foundation describes the design of the building as having a modern influence. The exterior design presents a balance of orthogonal lines and angles, glass and masonry, light cream and dark charcoal tones. The building's coloration complements and parallels those of the Winnipeg City Hall across Main Street – which also features Tyndall stone and deep grey masonry.
References
External links
*
*
{{authority control
Buildings and structures in downtown Winnipeg
Modernist architecture in Canada
Theatres completed in 1968
Performing arts centres in Canada
Canadian Centennial
Music venues completed in 1968
Theatres in Winnipeg
Music venues in Winnipeg
Performing arts in Manitoba
Opera houses in Canada
Venues of the 1999 Pan American Games