The Bureya Dam (locally referred to as Bureyskaya, ) is a
hydroelectric Hydroelectricity, or hydroelectric power, is Electricity generation, electricity generated from hydropower (water power). Hydropower supplies 15% of the world's electricity, almost 4,210 TWh in 2023, which is more than all other Renewable energ ...
dam A dam is a barrier that stops or restricts the flow of surface water or underground streams. Reservoirs created by dams not only suppress floods but also provide water for activities such as irrigation, human consumption, industrial use, aqua ...
on the Bureya River in the
Russian Far East The Russian Far East ( rus, Дальний Восток России, p=ˈdalʲnʲɪj vɐˈstok rɐˈsʲiɪ) is a region in North Asia. It is the easternmost part of Russia and the Asia, Asian continent, and is coextensive with the Far Easte ...
.


History

Bureya hydroelectric power station was built by Bureyagesstroy. Construction started in 1976, but was halted until 1999. In 1999,
RAO UES OAO RAO UES (OAO Unified Energy System of Russia; or ) was an electric power holding company in Russia. It controlled about 70% of Russia's installed electric capacity, 96% of its high-voltage grid and over 70% of its transmission lines. In add ...
restarted the project. The dam was completed and the first unit was launched in 2003. The construction of the whole complex was completed in 2009. The reservoir reached its specified level during the summer-autumn
monsoon A monsoon () is traditionally a seasonal reversing wind accompanied by corresponding changes in precipitation but is now used to describe seasonal changes in Atmosphere of Earth, atmospheric circulation and precipitation associated with annu ...
season of 2009. It was accompanied with first use of
spillway A spillway is a structure used to provide the controlled release of water downstream from a dam or levee, typically into the riverbed of the dammed river itself. In the United Kingdom, they may be known as overflow channels. Spillways ensure tha ...
s during planned tests. Despite the fact that all primary construction works on power station was completed, it was officially commenced for exploitation by government commission in 2011. Therefore, officially, the complex is still under construction.


Description

Bureya Dam is a
gravity dam A gravity dam is a dam constructed from concrete or stone masonry and designed to hold back water by using only the weight of the material and its resistance against the foundation. Gravity dams are designed so that each section of the dam is ...
with height of and crest length of . The power station has an installed capacity of , the full capacity. Power is generated by utilizing six
turbines A turbine ( or ) (from the Greek , ''tyrbē'', or Latin ''turbo'', meaning vortex) is a rotary mechanical device that extracts energy from a fluid flow and converts it into useful work. The work produced can be used for generating electrical ...
, each with a capacity of . The facility is owned by
RusHydro RusHydro (previous name: Hydro-OGK, ) is a Russian hydroelectricity company. As of early 2012 it had a capacity of 34.9  gigawatts. In late 2009, it was the world's second-largest hydroelectric power producer and is the country's largest p ...
.


See also

*
List of conventional hydroelectric power stations This article lists hydroelectricity, hydroelectric power stations that generate power using the Hydroelectricity#Generating methods, conventional dammed method. This list includes power stations that are larger than in maximum net capacity, and a ...
* List of power stations in Russia


External links

*


References

{{Authority control Dams in Russia Hydroelectric power stations in Russia Buildings and structures in the Russian Far East Energy in the Russian Far East Buildings and structures in Amur Oblast Dams completed in 2009