The Burbo Bank Offshore Wind Farm is a 348 MW offshore
wind farm A wind farm or wind park, also called a wind power station or wind power plant, is a group of wind turbines in the same location used Wind power, to produce electricity. Wind farms vary in size from a small number of turbines to several hundre ...
located on the Burbo Flats in Liverpool Bay on the west coast of the UK in the
Irish Sea The Irish Sea or , gv, Y Keayn Yernagh, sco, Erse Sie, gd, Muir Èireann , Ulster-Scots: ''Airish Sea'', cy, Môr Iwerddon . is an extensive body of water that separates the islands of Ireland and Great Britain. It is linked to the Ce ...
. It consists of an original 90 MW wind farm commissioned in 2007 and a 258 MW extension completed in 2017. The wind farm was developed in the 2000s by SeaScape Energy, which was acquired by DONG Energy (now Ørsted) in 2005. A 25 turbine installation using Siemens Wind Power 3.6 MW turbines was constructed from 2005, and officially opened in 2007. A further 32 8 MW turbines were constructed in 2016–17.


Burbo Bank

In September 2002 SeaScape Energy ( Zilkha Renewable Energy, enXco A/S, Wind Prospect Ltd. joint venture.) submitted an application to develop a Round 1 offshore wind farm site. Burbo Bank 1 Offshore Wind Farm (Lorc) ''Timeline & Track records'' The site, located on Burbo Flats in Liverpool bay (~7 km northwest of Wirral and ~6 km west of the Sefton coastline) was selected due to shallow water depths (0.5 to 8m at low tide), high wind speeds ~, and a generally favourable location including proximity to an electrical grid connection. Initial expectations were for a 30 × 3 MW turbine wind farm, with
monopile foundation A deep foundation is a type of foundation that transfers building loads to the earth farther down from the surface than a shallow foundation does to a subsurface layer or a range of depths. A pile or piling is a vertical structural element ...
s on a site of approximately . An electrical connection to the mainland grid was to be made by a seabed cable running southeast to Wirral, followed by a ~3.5 km underground cable to a substation at
Wallasey Wallasey () is a town within the Metropolitan Borough of Wirral, in Merseyside, England; until 1974, it was part of the historic county of Cheshire. It is situated at the mouth of the River Mersey, at the north-eastern corner of the Wirral Pe ...
. SeaScape received a capital grant of £10 million in 2003 to aid development of the project. In 2003 EDF subsidiary enXCo bought the interests of Wind Prospect in the project, the project became a joint venture between Elsam and
EDF Energies Nouvelles EDF Renewables (formerly ''EDF Renouvelables'') is a wholly owned subsidiary of the French utility EDF Group, specializing in renewable energy production. As an integrated operator, the Group develops and finances the construction of renewable en ...
in 2004 with Elsam taking 50% of the projecty. In September 2005 Siemens Wind Power was selected as the turbine supplier, with 25 3.6 MW turbines ordered at a cost of over €90 million. In December 2005 Dong Energy (now Ørsted) became sole owner of the project. Construction began in June 2006. Contractor for the foundation installation was MT Højgaard: the foundation design was by
Ramboll Rambøll Group A/S (also known as just "Ramboll") is a Danish consulting engineering group. History Rambøll was founded in October 1945 as "Rambøll & Hannemann" in Copenhagen. In 1991 the company merged with "B. Højlund Rasmussen A/S" into ...
, Smulders supplied the WTG foundations, turbine towers by
Bladt Industries Bladt Industries A/S is an international steel contractor specialising in large-scale and highly complex steel structures. Bladt Industries operate within three key areas of business providing steel solutions for the wind and renewable energy sec ...
, monopiles and transition pieces were from Sif; piling was done by
Menck Menck & Hambrock (also known as Menck) was a German manufacturer of earth moving and ramming equipment and once one of the world's leading companies. They were based right in the middle of Altona Ottensen, a part of Hamburg. Today the company oper ...
, with
Mammoet Van Oord Mammoet (, Dutch for Mammoth) is a privately held Dutch company specializing in engineered heavy lifting and transport of oversized and heavy objects. History Mammoet’s history started on 13 May 1807 in the Netherlands, when Dutch entrepr ...
supplying lifting barge platform ''Jumping Jack''. The contractor for the substation was EDF Energy Contracting, cable installation was by McNicholas Construction Services Ltd. (onshore) and Submarine Cable & Pipe (offshore), with cables supplied by ABB Group. Inter turbine and grid connection to the substation was at 33 kV, with voltage step up to 132 kV at the substation for grid connection. The facility began generating power in July 2007, and the wind farm was officially inaugurated on 18 October 2007, and the facility was commercially operational by the end of 2007; the capital cost of developing the wind farm was €181 million. Its levelised cost has been estimated as £87/MWh. Between 2008 and 2010, the capacity factor was between 32 and 35%. In 2009 the whole wind farm was put out of action for 4 weeks due to a failure in the underground electrical cable connecting to the National Grid. During summer 2010 Siemens decided to change the blade bearings on all 25 turbines as a pre-emptive measure after corrosion was found in blade bearings found on other sites. At the end of the windfarm's operational life (25 years) the wind farm will be decommissioned.


Burbo Bank Extension


Planning, funding and design

In 2009 the
Crown Estate The Crown Estate is a collection of lands and holdings in the United Kingdom belonging to the British monarch as a corporation sole, making it "the sovereign's public estate", which is neither government property nor part of the monarch's priva ...
announced that wind farm operators could apply for extensions to their Round 1 or Round 2 offshore wind farms;
DONG Energy Dong or DONG may refer to: Places * Dong Lake, or East Lake, a lake in China * Dong, Arunachal Pradesh, a village in India * Dong (administrative division) (동 or 洞), a neighborhood division in Korea Persons *Queen Dong (1623–1681), princes ...
identified Burbo Bank as a potential site and began consultation on a ~ extension westwards of the original wind farm. Between 2009 and 2010 the area of the site was reduced to the north increase clearance from the
shipping lane A sea lane, sea road or shipping lane is a regularly used navigable route for large water vessels (ships) on wide waterways such as oceans and large lakes, and is preferably safe, direct and economic. During the Age of Sail, they were determined b ...
s to the
Port of Liverpool The Port of Liverpool is the enclosed Dock (maritime), dock system that runs from Brunswick Dock in Liverpool to Seaforth Dock, Seaforth, Merseyside, Seaforth, on the east side of the River Mersey and the Great Float, Birkenhead Docks between ...
; to the south and to the west, reducing potential impact on recreational sailing activities and on certain species of sea bird, and due to potential conflicts with ship anchoring sites; also reducing the visual impact from land. In April 2010 the Crown Estate awarded an area of for lease. Water depths in the area are between . The sea bed consisted primarily of sand. The underlying geology is sand overlaying clay overlaying mudstone. Samples within the turbine area showed sand followed by clay down to around 30m before weak mudstone was found. The initial cable export route and grid connection identified was one making landfall near to the existing Burbo Bank land connection, and connected to a 275 kV substation in
Birkenhead Birkenhead (; cy, Penbedw) is a town in the Metropolitan Borough of Wirral, Merseyside, England; historically, it was part of Cheshire until 1974. The town is on the Wirral Peninsula, along the south bank of the River Mersey, opposite Liver ...
; subsequently a potential grid connection at the 400 kV Deeside substation (near
Deeside Power Station Deeside Power Station is a 498 MWe gas-fired power station on the Deeside Industrial Park to the north of Connah's Quay in Flintshire, Wales. It is north of the River Dee. History It is sited on land of a former British Steel Corporation s ...
, Wales) was identified; and later a connection with landfall at
Ffrith Beach Ffrith Beach, Prestatyn, Denbighshire, North Wales North Wales ( cy, Gogledd Cymru) is a regions of Wales, region of Wales, encompassing its northernmost areas. It borders Mid Wales to the south, England to the east, and the Irish Sea to the nor ...
, (nr. Prestatyn, Wales) to an extension of the new ''Bodelwyddan'' 400 kV substation under construction for the Gwynt y Môr Offshore Wind Farm. In 2011 the developer reached an agreement with the National Grid to use to a connection near the Bodelwyddan substation. The planned export cable route crossed a number of pre-existing cables and pipelines: a set of pipelines related to the Liverpool Bay oil and gas field, connecting the Douglas Complex to landfall were crossed in the Mid-Hoyle channel the export cable route also ran close to the
North Hoyle Offshore Wind Farm North Hoyle Offshore Wind Farm is Wales' first offshore wind farm, and the UK's first major offshore renewable power project. Situated in Liverpool Bay, it commenced operation in 2003. The first of the UK's Round 1 offshore wind farms, North Hoy ...
export cable; and crossed the 500 MW
East–West Interconnector The East–West Interconnector is a 500MW high-voltage direct current submarine and subsoil power cable which connects the Irish and British electricity markets. The project was developed by the Irish national grid operator EirGrid. Aim The ...
, as well as the planned route of the 2000 MW
Western HVDC Link The Western HVDC Link is a high-voltage direct current (HVDC) undersea electrical link in the United Kingdom, between Hunterston in Western Scotland and Flintshire Bridge (Connah's Quay) in North Wales, routed to the west of the Isle of Man. It ...
. Initial expectations were for construction to start in early 2015, and be complete by early 2017, subject to final specifications; neither foundation nor turbine type was specified, an offshore substation to step up the inter turbine voltage (either 33 or 66 kV) to an export voltage of either 132 or 275 kV, connection to the National Grid would be made at 400 kV, stepped up at an onshore substation at Bodelwyddan. The wind farm extension received contract for difference renewable energy subsidy funding from the UK government in April 2014, with a strike price of £150 per MWh (2012 prices). DONG made the decision to proceed with construction of the wind farm in December 2014. DONG Energy (now Ørsted) sold half of the wind farm extension to KIRKBI A/S (
Lego Lego ( , ; stylized as LEGO) is a line of plastic construction toys that are manufactured by The Lego Group, a privately held company based in Billund, Denmark. The company's flagship product, Lego, consists of variously colored interlocking ...
holding company) and Danish pension fund PKA for £660 million in February 2016.


Construction

In early 2014,
DONG Energy Dong or DONG may refer to: Places * Dong Lake, or East Lake, a lake in China * Dong, Arunachal Pradesh, a village in India * Dong (administrative division) (동 or 洞), a neighborhood division in Korea Persons *Queen Dong (1623–1681), princes ...
announced that the Vestas' V164 8.0 MW turbine was the preferred model for the development, and made preliminary agreements to buy 32 units in August 2014. The order for 32 turbines was confirmed in December 2014, the first series production of the type. The nacelles are to be produced at the former
Odense Steel Shipyard Odense Steel Shipyard ( da, Odense Staalskibsværft) was a Danish shipyard company located in Odense. It was best known for building container ships for its parent group, A.P. Moller – Maersk Group, including the Mærsk E class in 2006 whic ...
, while the blades are made at Vestas' Isle of Wight facilities. Assembly will take place in
Belfast Belfast ( , ; from ga, Béal Feirste , meaning 'mouth of the sand-bank ford') is the capital and largest city of Northern Ireland, standing on the banks of the River Lagan on the east coast. It is the 12th-largest city in the United Kingdo ...
. In August 2014 ABB was awarded the contract to supply export cables. Suppliers for inter array cabling was
Nexans Nexans S.A. is a global company in the cable and optical fiber industry headquartered in Paris, France. The group is active in four main business areas: buildings and territories (construction, local infrastructure, smart cities / grids, e-mobil ...
; DONG Energy having agreed to a long-term supply arrangement for inter array cabling with Nexans in August 2014. In January 2015 RXPE ( Rongxin Power Engineering) was awarded the design and build contract for the Burbo 2 extension Dynamic Reactive Compensation electrical equipment (STATCOM); and
Bladt Industries Bladt Industries A/S is an international steel contractor specialising in large-scale and highly complex steel structures. Bladt Industries operate within three key areas of business providing steel solutions for the wind and renewable energy sec ...
and EEW obtained the contract to construct wind turbine foundations and structures, with transition pieces to be manufactured by Bladt/EEW jv ''
Offshore Structures (Britain) Ltd. Offshore Structures (Britain) Ltd. is a marine offshore structure foundation manufacture based at Haverton Hill near Billingham on the north bank of the River Tees. The company was formed as a joint venture between Bladt Industries and EEW at ...
'' (former TAG Energy Solutions plant in Billingham, UK), and by Bladt at
Aalborg Aalborg (, , ) is Denmark's fourth largest town (behind Copenhagen, Aarhus, and Odense) with a population of 119,862 (1 July 2022) in the town proper and an urban population of 143,598 (1 July 2022). As of 1 July 2022, the Municipality of Aalb ...
(Denmark) with monopiles made at EEW's factory in
Rostock Rostock (), officially the Hanseatic and University City of Rostock (german: link=no, Hanse- und Universitätsstadt Rostock), is the largest city in the German state of Mecklenburg-Vorpommern and lies in the Mecklenburgian part of the state, c ...
(Germany). In April 2015
A2SEA A2SEA was an offshore wind farm installation and services company based in Fredericia, Denmark. The company specializes in transport, installation, and servicing of offshore wind farms. In addition to Denmark, the company has subsidiaries in th ...
was contracted to for turbine installations, and Jan De Nul contracted to install the offshore export cable. In June 2015 Van Oord were contracted for foundation installation. In October 2015
DONG Energy Dong or DONG may refer to: Places * Dong Lake, or East Lake, a lake in China * Dong, Arunachal Pradesh, a village in India * Dong (administrative division) (동 or 洞), a neighborhood division in Korea Persons *Queen Dong (1623–1681), princes ...
's two 200 tonne transformers were delivered by Collett & Sons Ltd to the onshore substation via 550 Tonne capacity
girder bridge A girder bridge is a bridge that uses girders as the means of supporting its deck. The two most common types of modern steel girder bridges are plate and box. The term "girder" is often used interchangeably with "beam" in reference to bridge de ...
. In early 2016 DONG Energy acquired a lease on
Cammell Laird Cammell Laird is a British shipbuilding company. It was formed from the merger of Laird Brothers of Birkenhead and Johnson Cammell & Co of Sheffield at the turn of the twentieth century. The company also built railway rolling stock until 1929, ...
's yard in
Birkenhead Birkenhead (; cy, Penbedw) is a town in the Metropolitan Borough of Wirral, Merseyside, England; historically, it was part of Cheshire until 1974. The town is on the Wirral Peninsula, along the south bank of the River Mersey, opposite Liver ...
to be used as a base during the construction of the wind farm. The first 8MW turbine was installed in September 2016. The wind farm extension was commissioned in April 2017. Its levelised cost has been estimated at £147/MWh. After around 20–25 years of operation the wind farm would be expected to be decommissioned, including removal off all offshore components above seabed level. (5.1.1.6) Project Description (Dong) sec.6.14


See also

* List of offshore wind farms *
List of offshore wind farms in the United Kingdom StrikeOpt This is a list of offshore wind farms within the national maritime boundaries of the United Kingdom. The name of the wind farm is the name used by the energy company when referring to the farm; it is usually related to the name of the ...
*
List of offshore wind farms in the Irish Sea This is a complete list of operational, offshore wind farms in the Irish Sea and connected areas such as the Celtic Sea and North Channel. This information is gathered from multiple Internet sources,< at the top in each column.