Brent Oil Field
   HOME

TheInfoList



OR:

The Brent field was an oil and gas field operated by Shell UK Limited. It was located in 470ft of water, in the East Shetland Basin of the
North Sea The North Sea lies between Great Britain, Denmark, Norway, Germany, the Netherlands, Belgium, and France. A sea on the European continental shelf, it connects to the Atlantic Ocean through the English Channel in the south and the Norwegian Se ...
, north-east of
Lerwick Lerwick ( or ; ; ) is the main town and port of the Shetland archipelago, Scotland. Shetland's only burgh, Lerwick had a population of about 7,000 residents in 2010. It is the northernmost major settlement within the United Kingdom. Centred ...
in the
Shetland Islands Shetland (until 1975 spelled Zetland), also called the Shetland Islands, is an archipelago in Scotland Scotland is a Countries of the United Kingdom, country that is part of the United Kingdom. It contains nearly one-third of the Uni ...
, Scotland. The field was discovered in 1971 with the 211/29-1
well A well is an excavation or structure created on the earth by digging, driving, or drilling to access liquid resources, usually water. The oldest and most common kind of well is a water well, to access groundwater in underground aquifers. The ...
which was drilled by the Shell owned 'Staflo'
semi-submersible Semi-submersible may refer to a self-propelled vessel, such as: *Heavy-lift ship, which partially submerge to allow their cargo (another ship) to float into place for transport *Narco-submarine, some of which remained partially on the surface *S ...
drilling rig. At the time, this was the world's most northerly well ever drilled. Appraisal of the discovery was not possible until 1972 due to the severe winter weather conditions of the Northern North Sea and the limited capabilities of contemporary drilling rigs. A total of 6 appraisal wells were drilled to allow the full potential of the field to be evaluated. The original oil/condensate-in-place and wet gas-in-place were estimated at 3.8 billion barrels and 7.5 trillion cubic feet respectively. The field was developed with 4 large fixed platforms: Alpha, Bravo, Charlie, Delta, which were installed between 1975 and 1978. First oil was achieved in 1976. A total initial investment of £3 billion was required to develop the field, install the infrastructure, drill the wells and bring the oil and gas to shore. Brent was once one of the most productive parts of the UK's offshore assets but has now been fully decommissioned after reaching the end of its economic life. All four platforms were removed from the field between 2017 and 2024 by '' Pioneering Spirit'', the world's largest vessel by tonnage.


Name

Shell Shell may refer to: Architecture and design * Shell (structure), a thin structure ** Concrete shell, a thin shell of concrete, usually with no interior columns or exterior buttresses Science Biology * Seashell, a hard outer layer of a marine ani ...
initially named all of its UK oil fields after seabirds in alphabetical order by discovery – Auk, Brent, Cormorant, Dunlin, Eider, Fulmar and so on. Brent refers to the
brent goose The brant or brent goose (''Branta bernicla'') is a small goose of the genus ''Branta''. There are three subspecies, all of which winter along temperate-zone sea-coasts and breed on the high-Arctic tundra. The Brent oilfield was named after ...
, and in turn gave its initials to the geologic subdivisions of the Middle Jurassic-age Brent Group that make up the field: Broom, Rannoch, Etive, Ness and Tarbert formations, with each name representing a
loch ''Loch'' ( ) is a word meaning "lake" or "inlet, sea inlet" in Scottish Gaelic, Scottish and Irish Gaelic, subsequently borrowed into English. In Irish contexts, it often appears in the anglicized form "lough". A small loch is sometimes calle ...
in the
Scottish Highlands The Highlands (; , ) is a historical region of Scotland. Culturally, the Highlands and the Scottish Lowlands, Lowlands diverged from the Late Middle Ages into the modern period, when Scots language, Lowland Scots language replaced Scottish Gae ...
.


Geology

Situated in the East Shetland Basin, the Brent is the archetype for many of the fields in the area, consisting of a tilted fault block exposing the eponymous Brent formation, next to bounding faults which allowed migration from deeper adjacent "kitchen" areas where the
Kimmeridge Clay The Kimmeridge Clay is a sedimentary rock, sedimentary deposit of fossiliferous marine clay which is of Late Jurassic to lowermost Cretaceous age and occurs in southern and eastern England and in the North Sea. This rock formation (geology), form ...
Formation becomes fully mature and releases
hydrocarbon In organic chemistry, a hydrocarbon is an organic compound consisting entirely of hydrogen and carbon. Hydrocarbons are examples of group 14 hydrides. Hydrocarbons are generally colourless and Hydrophobe, hydrophobic; their odor is usually fain ...
s. Unusually on a worldwide scale (but common in this basin), the seal or cap rock for the reservoir (which stops the hydrocarbons from migrating further towards the surface) is also the Kimmeridge Clay, or technically the Heather Formation immediately below. The reservoir depth is .


Production

Production started on 11 November 1976, and on 13 December 1976 the first tanker was loaded. The Brent field oil was extracted by four platforms in an irregular SSW-NNE line. The first in place was the concrete-legged "Condeep" Brent Bravo, built by Norwegian Contractors in Stavanger, in August 1975. This was followed by the steel-jacket Brent Alpha built by Redpath Dorman Long in Methil and installed in May 1976; the concrete-legged Brent Delta, again built by Norwegian Contractors in Stavanger, in July 1976; and the concrete-base Brent Charlie, built by McAlpine/Sea Tank in Ardyne Point, installed in June 1978. As of 2004, the field was still producing oil through a manifold (all Brent Alpha fluids are produced across to Brent Bravo). A fifth installation, the floating
Brent Spar Brent Spar, known as Brent "E", was a North Sea oil storage and tanker loading buoy in the Brent oilfield, operated by Shell UK. With the completion of a pipeline connection to the oil terminal at Sullom Voe in Shetland, the storage facil ...
, served as a storage- and tanker-loading buoy and was installed early in the field's construction. The "spar" design of this installation led to the name by which it became the best known of the Brent installations (outside the oil industry). The field also included a remote flare, the "Brent Flare", which was used to flare off excess gas before gas handling and export facilities were installed in the field, also used as a vent in winter 1995–96. This unit was decommissioned and removed using a heavy lifting barge in 2005. The topsides for Brent Charlie were designed by Matthew Hall Engineering which was awarded the contract in January 1974.Matthew Hall Engineering publicity brochure n.d. but c. 1990 Initially there were facilities for 19 oil production wells, nine water injection wells, six gas injection wells and three spare slots. The production capacity was per day and 8.5 million standard cubic metres of gas per day. There were three production trains each with four stages of separation with the first stage separators operating at a pressure of 9.6 bar. The 14 subsea storage cells had a capacity of . Electricity generation was powered by three 12 MW
Rolls-Royce Avon The Rolls-Royce Avon was the first axial flow jet engine designed and produced by Rolls-Royce. Introduced in 1950, the engine went on to become one of their most successful post-World War II engine designs. It was used in a wide variety of ai ...
gas turbines. The topside accommodation was for 120 people. There were 14 topsides modules and the topsides weight was 34,000 tonnes. The initial design parameters of the Brent installations is summarised in the table. The field supplied oil via the Brent System pipeline to the terminal at
Sullom Voe Sullom Voe is an eight-mile-long voe or inlet off Yell Sound in the Shetland Islands. It divides the Northmavine peninsula from the remainder of Mainland (the two are connected by an isthmus at the head of the voe known as Mavis Grind). It i ...
, while gas was piped through the
FLAGS A flag is a piece of fabric (most often rectangular) with distinctive colours and design. It is used as a symbol, a signalling device, or for decoration. The term ''flag'' is also used to refer to the graphic design employed, and flags have ...
pipeline ashore at St Fergus on the north-east coast of Scotland. The production of oil from the field (in 1000s barrels) was:The field underwent a £1.3 billion upgrade project in the mid-1990s, which involved depressurising the entire reservoir and making extensive modifications to three of the four Brent platforms. This converted them to low-pressure operation, which unlocked significant quantities of natural gas from the reservoir and extended the field life beyond 2010. The field's peak production capacity reached 504,000 barrels of oil per day (bopd) in 1982 and it produced a total of approximately three billion barrels of oil equivalent as of 2008. The Brent field decommissioning project was initiated in 2006. Brent Delta was the first platform to cease production in December 2011, while the Brent Alpha and Bravo platforms stopped production in November 2014, Brent Charlie in March 2021.


Decommission

The Brent pipelines decommissioning programme was approved by the UK government in March 2020. As per the decommissioning plan, the gravity-based structures (GBS) of Delta, Charlie, and Bravo platforms, the jacket footings of Alpha platform, drill cuttings, and the GBS cell contents will not be removed from the field. The GBS subsea storage cells were used to temporarily store crude oil before pumping to tankers or pipeline. The Brent field is being decommissioned in a phased manner. The Brent Delta topside decommissioning programme was approved by the UK government in July 2015, while that for the Alpha, Bravo, and the Charlie platforms were approved in August 2018. The topsides of the Brent Delta platform, weighing approximately 24,200 t, was removed in a single-lift in April 2017 and transported to Hartlepool for recycling. The topside was completely dismantled by February 2019. The topsides of the Brent Bravo platform, weighing approximately 25,000 t, was removed in a single-lift in June 2019. The topside is currently being dismantled and recycled. The legs of the Brent Bravo and Delta platforms remain in place with their GBS subsea storage cells. This will also apply to the Brent Charlie platform when decommissioned. The contents of the GBS storage cells are likely to be residual hydrocarbons and radioactive toxic elements.


Air incidents involving workers

On 31 July 1979, a Dan Air fixed wing aircraft crashed attempting to take off from Sumburgh Airport. The flight was returning Brent Field workers to Aberdeen. There were 17 fatalities. The aircraft was an ex Aerolineas Argentinas HS 748 manufactured in 1962. The main cause was found to be a faulty gust lock. The co-pilot was found to have tranquillisers in his system. It is not known if he was in control as he had less than 100 hours on this type of aircraft. On 6 November 1986, a Boeing Vertol BV234 Chinook helicopter G-BWFC crashed on approach to Sumburgh airport. The flight was returning from the Brent Field. There were 45 fatalities and 2 survivors one of whom was the pilot. The cause was found to be faulty transmission, which caused the twin rotor blades to collide. On 25 July 1990, a Sikorsky S61-N helicopter G-BEWL crashed while attempting to land on Brent Spar. There were 6 fatalities including both pilots. The cause was found to be pilot error and design of the helideck.


See also

*
Brent crude Brent Crude may refer to any or all of the components of the Brent Complex, a physically and financially traded oil market based around the North Sea of Northwest Europe; colloquially, Brent Crude usually refers to the price of the ICE (Intercon ...
* Energy policy of the United Kingdom *
Energy use and conservation in the United Kingdom Total energy consumption in the United Kingdom was 142.0million tonnes of oil equivalent (1,651TWh) in 2019. In 2014, the UK had an energy consumption ''per capita'' of 2.78tonnes of oil equivalent (32.3MWh) compared to a world average of 1 ...


References

{{Shell oil North Sea oil fields Oil and gas industry in Shetland Oil fields of Scotland Shell plc oil and gas fields