Belgrade–Bar motorway ( sr-cyr, Ауто-пут Београд–Бар, Auto-put Beograd–Bar) is a future
motorway A controlled-access highway is a type of highway that has been designed for high-speed vehicular traffic, with all traffic flow—ingress and egress—regulated. Common English terms are freeway, motorway, and expressway. Other similar terms ...
that will connect the Serbian capital of
Belgrade Belgrade is the Capital city, capital and List of cities in Serbia, largest city of Serbia. It is located at the confluence of the Sava and Danube rivers and at the crossroads of the Pannonian Basin, Pannonian Plain and the Balkan Peninsula. T ...
and Bar, Montenegro's main
seaport A port is a maritime facility comprising one or more wharves or loading areas, where ships load and discharge cargo and passengers. Although usually situated on a sea coast or estuary, ports can also be found far inland, such as Hamburg, Manc ...
. Italy, Montenegro and Serbia are lobbying to list the route with
Pan-European corridors The ten Pan-European transport corridors were defined at the second Pan-European transport Conference in Crete, March 1994, as routes in Central and Eastern Europe that required major investment over the next ten to fifteen years. Additions were ...
, and it is frequently referred to as part of proposed Corridor XI, or 4B – an envisioned motorway/ferry corridor linking
Bari Bari ( ; ; ; ) is the capital city of the Metropolitan City of Bari and of the Apulia Regions of Italy, region, on the Adriatic Sea in southern Italy. It is the first most important economic centre of mainland Southern Italy. It is a port and ...
, Bar, Belgrade and
Bucharest Bucharest ( , ; ) is the capital and largest city of Romania. The metropolis stands on the River Dâmbovița (river), Dâmbovița in south-eastern Romania. Its population is officially estimated at 1.76 million residents within a greater Buc ...
. From the Serbian side, the road's construction started in 2012 on a 40.3 kilometers-long section Ljig—Preljina on northern part of the route, which was put into service in 2016. From the Montenegrin side, the road's construction began on May 11, 2015. The project became the subject of controversy in 2021 after revelations that loan agreements between China and Montenegro to finance the project had been the result of corruption, and that the terms of the agreement made it unrealistic that Montenegro would be able to meet its obligations under the deal.


Serbian section

As the A1 motorway towards Skopje at the
European route E75 European route E 75 is part of the International E-road network, which is a series of main roads in Europe. The E 75 starts at the town of Vardø (town), Vardø in Norway by the Barents Sea, and it runs south through Finland, Poland, C ...
approached completion in late 2010s, public attention has shifted towards the future highway connecting Belgrade with Montenegro, designated as A2. The motorway is envisioned as a local link as much as a transit link, connecting southwestern Serbia with Belgrade and the European road network.


Route description

Serbian section of the motorway can be roughly divided into two sections: Belgrade to Požega and Požega to Boljare, at the state border of Serbia and Montenegro. The section of the road between Belgrade and Požega is 151.63 kilometers long and it will pass through the Serbian towns and municipalities of
Ostružnica Ostružnica ( sr-cyr, Остружница) is a List of Belgrade neighborhoods, suburban settlement of Belgrade, Serbia, in the municipality of Čukarica. It has a population of 4,218 people (2011). Geography Ostružnica is located on the right b ...
, Umka,
Obrenovac Obrenovac ( sr-cyr, Обреновац, ) is a municipality of the city of Belgrade. According to the 2022 census results, the municipality has a population of 68,882 inhabitants, while the urban area has 25,380 inhabitants. The old name for Obreno ...
, Ub, Lajkovac,
Ljig Ljig ( sr-cyr, Љиг) is a town and municipality located in the Kolubara District of western Serbia. It has a population of 2,938 inhabitants, while the municipality has a total of 10,711 inhabitants. It is surrounded by Mount Rajac and Mount ...
, Takovo, Preljina (in the municipality of
Čačak Čačak ( sr-Cyrl, Чачак, ) is a List of cities in Serbia, city and the administrative center of the Moravica District in central Serbia. It is located in the West Morava Valley. According to the 2022 census, the city itself has a population ...
) and Požega. Total worth of the Belgrade–Preljina section is estimated to be at 889.8 million
euro The euro (currency symbol, symbol: euro sign, €; ISO 4217, currency code: EUR) is the official currency of 20 of the Member state of the European Union, member states of the European Union. This group of states is officially known as the ...
s, and because of favorable terrain it will be the cheapest section of the motorway. The southern section of the road from Požega to Boljare will cost at least 1.5 billion euros, for approximately . The exact route of this section has not yet been determined.


Current progress

In Serbia, efforts to start the construction of the long section between Belgrade and Požega began in 2008, when a concession contract was signed with and FCC Construction. Yet, Alpine and the
Government of Serbia The government of Serbia ( sr-cyrl, Влада Србије, Vlada Srbije), formally the Government of the Republic of Serbia ( sr-cyrl, Влада Републике Србије, Vlada Republike Srbije), commonly abbreviated to Serbian Governme ...
agreed to cancel the contract in August 2008. In 2010, consortium of Serbian construction companies won the bidding for building of 12,5 km section between Ub and Lajkovac. On July 30, 2010, the work began and the construction is still underway. In August 2019 the complete section of 103 km from Obrenovac to Preljina was open to traffic. Section from Obrenovac to Surčin was opened on December 18, 2019. It is expected for the connection from New Belgrade to Surčin to be completed by 2022. Section Preljina—Požega, A.K.A. E763, is a section which is currently under construction. It will be 30.9 kilometres long. It is expected to be completed by June 2025. When completed, it will feature six kilometres of bridges, and six kilometres of tunnels. This also means that one third of the section will be tunnels and bridges. The last section of A2 motorway is a section from Požega to border with Montenegro near Boljare. This section will be more than 100 kilometers long, and the exact route is still to be determined.


Montenegrin section

The Montenegrin part of motorway is known as the Bar-Boljare motorway. It will be 165 km long, and by far the most expensive one, with an estimated cost of around 2 billion euros. The rugged mountainous terrain is an engineering challenge, with 50 tunnels and 95 bridges and viaducts planned along the section.


Route description

The Montenegrin part is to be built in three phases: * ( Bar) ĐurmaniSozina tunnelVirpazarBistricaŠtekeĆafaTološko polje – (
Podgorica Podgorica ( cnr-Cyrl, Подгорица; ) is the Capital city, capital and List of cities and towns in Montenegro, largest city of Montenegro. The city is just north of Lake Skadar and close to coastal destinations on the Adriatic Sea. Histor ...
) Smokovac: this is the southernmost section of the motorway, that will link the Montenegrin capital of Podgorica with the main seaport in Bar. Potential investors, such as
EBRD The European Bank for Reconstruction and Development, shortened to EBRD ( French: ''Banque européenne pour la reconstruction et le développement'' or ''BERD''), is an international financial institution founded in 1991 in Paris. As a multilat ...
and EIB, are suggesting that this section should be built first, as it will likely have the highest traffic volume following completion. The planned length of this section is 49 km. * (Podgorica) Smokovac – BiočePelev BrijegLijeva RijekaVeruša
Mateševo Mateševo ( cnr-Cyrl, Матешево) is a village in northern Montenegro, within Kolašin Municipality Kolašin Municipality is one of the municipalities of Montenegro. Located in Northern Montenegro, municipality is part and unofficial centre ...
: this middle section of the motorway is considered a priority, because of its significance as a link between Podgorica and northern Montenegro. The current road link ( E65), carved into the
Morača The Morača ( cnr-Cyrl, Морача, ) is a major river in Montenegro that originates in the northern region in Kolašin Municipality under Mount Rzača. It meanders southwards for before emptying into Lake Skadar. Its drainage basin covers ...
canyon, is a curvy mountainous road, considered dangerous during the winter, and is a bottleneck in Montenegrin road network. Thus, building this section first is a requirement in bidding documents presented by the Montenegrin Government. This section will have a length of 41 km, and is by far the most expensive section of the motorway, with a cost per kilometer of motorway estimated to be higher than €20 million. * Mateševo – AndrijevicaBeraneCrnča – Boljare: this northernmost section of the motorway is likely to be completed only after progress is made on the Serbian section of the motorway south of Požega. The planned length of this section is 75 km.


Current progress

The project is currently in
construction bidding Construction bidding is the process of submitting a proposal ( tender) to undertake, or manage the undertaking of a construction project. The process starts with a cost estimate from blueprints and material take offs. The tender is treated as an ...
phase, and is devised as a public-private partnership. A
general contractor A contractor (North American English) or builder (British English), is responsible for the day-to-day oversight of a construction site, management of vendors and trades, and the communication of information to all involved parties throughout the c ...
that signs the contract with the
Government of Montenegro The government of Montenegro (, Влада Црне Горе) is the executive branch of state authority in Montenegro. It is headed by the Prime Minister of Montenegro, prime minister. It consists of the prime minister, the deputy prime ministe ...
is to finance the construction of the motorway, and conduct maintenance and collect toll fees and other incomes for a period of 30 years after completion. During that 30-year period, Government of Montenegro will pay off its share of financing through
annuities In investment, an annuity is a series of payments made at equal intervals based on a contract with a lump sum of money. Insurance companies are common annuity providers and are used by clients for things like retirement or death benefits. Examples ...
. The bidding offers were reviewed in March 2009, and the top bid came from the Croatian consortium, led by the company of ''Konstruktor''. This was followed by signing of contract document, and announcing of the beginning of construction works in June 2009. The official construction works opening ceremony happened on October 15, 2009, in the village of Gornje Mrke north of Podgorica, attended by the Prime Ministers of Montenegro (
Milo Đukanović Milo Đukanović (, ; born 15 February 1962) is a Montenegrin politician who served as the President of Montenegro from 2018 to 2023, previously serving in the role from 1998 to 2002. He also served as the Prime Minister of Montenegro (1991–19 ...
), Serbia (
Mirko Cvetković Mirko Cvetković ( sr-Cyr, Мирко Цветковић, ; born 16 August 1950) is a Serbian economist and former politician who served as the Prime Minister of Serbia, prime minister of Serbia from 2008 to 2012 and as finance minister from 200 ...
) and Croatia (
Jadranka Kosor Jadranka Kosor (; born 1 July 1953) is a Croatian politician and former journalist who served as Prime Minister of Croatia from 2009 to 2011, having taken office following the sudden resignation of her predecessor Ivo Sanader. Kosor was the List ...
). However, the Croatian consortium failed to provide necessary
bank guarantee A bank guarantee is a kind of guarantee from a lending organization. The bank guarantee also signifies that the lending institution ensures that the liabilities of a debtor are going to be met. In other words, if the debtor fails to perform the o ...
s in a timely manner, so the contract was cancelled eight months later. The second best rated bidder, a consortium of the Greek company Aktor and the Israeli company Shikun & Binui was called in for negotiations by the Government. After negotiations, it was agreed that Aktor/HCH consortium builds two southern sections of the motorway for a price of 1.575 billion euro. The third and the northernmost section, from
Mateševo Mateševo ( cnr-Cyrl, Матешево) is a village in northern Montenegro, within Kolašin Municipality Kolašin Municipality is one of the municipalities of Montenegro. Located in Northern Montenegro, municipality is part and unofficial centre ...
to Boljare, as well as the small strip across the
Lake Skadar Lake Skadar or Lake Scutari (, ; cnr-Cyrl-Latn, Скадарско језеро, Skadarsko jezero, )also called Lake Shkodra (and ''Lake Shkodër'')lies on the border of Albania and Montenegro, and is the largest lake in Southern Europe. It is n ...
, were to be the subject of further negotiations. However, the Greek-Israeli consortium also failed to provide bank guarantees, so the negotiations between the consortium and the Government of Montenegro were ended in December 2010. The Government of Montenegro began to explore financing options for motorway construction, including negotiations with Chinese investors. The possibility of China Road and Bridge Group and China Poly Group Corporation building the road, with the financial backing of
Exim Bank of China Exim is a mail transfer agent (MTA) used on Unix-like operating systems. Exim is a free software distributed under the terms of the GNU General Public License, and it aims to be a general and flexible mailer with extensive facilities for checkin ...
, was mentioned in the Montenegrin media. In January 2011, the Montenegrin Minister of Transportation had sent an official letter of invitation to the ''Poly Group'', and the negotiations were underway. If the negotiations came through, the terms of building and financing would be established via treaty, thus avoiding the bidding process and discarding the public-private partnership option. In April 2013, discussions were still under way between the Montenegrin government and Chinese parties and an offer of US$1bn of financing by EXIM bank and the selection of a preferred construction consortium was announced in July 2013 and with detailed commercial negotiations underway since. In December 2014, negotiations with Chinese partners had successfully concluded. In May 2015, works on first section in Montenegro, Smokovac–Uvač–Mateševo had started, expected to finish within 48 months. After 48 months of building, the motorway was not finished due to terrain, and was further slowed due to the
COVID-19 pandemic The COVID-19 pandemic (also known as the coronavirus pandemic and COVID pandemic), caused by severe acute respiratory syndrome coronavirus 2 (SARS-CoV-2), began with an disease outbreak, outbreak of COVID-19 in Wuhan, China, in December ...
, but after seven years of construction, the first section was completed. It was not opened for vehicles because of the reconstruction of regional road R-13 due to the number of workers commuting to the motorway for its construction. Reconstruction included widening, safety improvements, asphalt paving, and a new bridge near
Mateševo Mateševo ( cnr-Cyrl, Матешево) is a village in northern Montenegro, within Kolašin Municipality Kolašin Municipality is one of the municipalities of Montenegro. Located in Northern Montenegro, municipality is part and unofficial centre ...
, was completed in October 2022.


References


External links


Draft of the Detailed Spatial Plan of Bar - Boljare Motorway - Montenegrin language only

Autoput Bar Boljare
news portal devoted to the road {{DEFAULTSORT:Belgrade-Bar Motorway Highways in Serbia Roads in Montenegro Proposed roads Proposed transport infrastructure in Serbia Proposed transport infrastructure in Montenegro