Batang–Semarang Toll Road
   HOME

TheInfoList



OR:

Batang-Semarang Toll Road is a 75 kilometers long
controlled-access A controlled-access highway is a type of highway that has been designed for high-speed vehicular traffic, with all traffic flow—ingress and egress—regulated. Common English terms are freeway, motorway, and expressway. Other similar terms ...
toll road A toll road, also known as a turnpike or tollway, is a public or private road for which a fee (or ''Toll (fee), toll'') is assessed for passage. It is a form of road pricing typically implemented to help recoup the costs of road construction and ...
that connects Batang area with
Semarang Semarang (Javanese script, Javanese: , ''Kutha Semarang'') is the capital and largest city of Central Java province in Indonesia. It was a major port during the Netherlands, Dutch Dutch East Indies, colonial era, and is still an important regio ...
,
Central Java Central Java (, ) is a Provinces of Indonesia, province of Indonesia, located in the middle of the island of Java. Its administrative capital is Semarang. It is bordered by West Java in the west, the Indian Ocean and the Special Region of Yogya ...
,
Indonesia Indonesia, officially the Republic of Indonesia, is a country in Southeast Asia and Oceania, between the Indian Ocean, Indian and Pacific Ocean, Pacific oceans. Comprising over List of islands of Indonesia, 17,000 islands, including Sumatra, ...
. This toll road is part of Trans-Java Expressway which will connect Merak to
Banyuwangi Banyuwangi, previously known as Banjoewangi, is a large town and an administrative district (''kecamat5an'') which serves as the capital of Banyuwangi Regency at the far eastern end of the island of Java, Indonesia. It had a population of 106,000 ...
of the island of
Java Java is one of the Greater Sunda Islands in Indonesia. It is bordered by the Indian Ocean to the south and the Java Sea (a part of Pacific Ocean) to the north. With a population of 156.9 million people (including Madura) in mid 2024, proje ...
. The toll road is operational since 2018.


Sections

Until November 2017, its construction progress is at 55.7 percent. The construction of this toll road is divided into 5 sections: *Section I, beginning of project - East Batang (3.2 km) *Section II, East Batang - Weleri (36.35 km) *Section III, Weleri - Kendal (11.05 km) *Section IV, Kendal - Kaliwungu (13.5 km) *Section V, Kaliwungu - Krapyak (10.9 km)


Exits and Gates

''Note: The number on the exits is based on the distance from the western terminus of the Jakarta-Cikampek Toll Road, while the distance numbers are based on the distance from the western terminus of this toll road only''