The European Offshore Wind Deployment Centre (EOWDC), also known as the Aberdeen Bay Wind Farm is an offshore wind test and demonstration facility located around 3 kilometres off the east coast of
Aberdeenshire Aberdeenshire (; ) is one of the 32 Subdivisions of Scotland#council areas of Scotland, council areas of Scotland. It takes its name from the Shires of Scotland, historic county of Aberdeenshire (historic), Aberdeenshire, which had substantial ...
, in the
North Sea The North Sea lies between Great Britain, Denmark, Norway, Germany, the Netherlands, Belgium, and France. A sea on the European continental shelf, it connects to the Atlantic Ocean through the English Channel in the south and the Norwegian Se ...
, Scotland. It was developed by the European Offshore Wind Deployment Centre consortium. The scheme is relatively small - it consists of 11 wind turbines with an installed capacity of 93.2 megawatts. It is located between Blackdog and
Bridge of Don Bridge of Don is a suburb in the north of Aberdeen, Scotland. In , the Bridge of Don electoral ward was estimated to have a population of 19,545. Bridge of Don is split into four areas for statistical purposes by Aberdeen City Council and Poli ...
near
Aberdeen Aberdeen ( ; ; ) is a port city in North East Scotland, and is the List of towns and cities in Scotland by population, third most populous Cities of Scotland, Scottish city. Historically, Aberdeen was within the historic county of Aberdeensh ...
. First power was generated in July 2018, with full commissioning following in September 2018.


Planning

The wind farm was initially proposed by the Aberdeen Renewable Energy Group (AREG) in 2003. The original plan was for 20 two-megawatt turbines in an eight kilometres long row about 1 kilometre offshore. A geological survey of Aberdeen Bay was begun in 2007, and a grant of 40 million euros was offered by the
European Commission The European Commission (EC) is the primary Executive (government), executive arm of the European Union (EU). It operates as a cabinet government, with a number of European Commissioner, members of the Commission (directorial system, informall ...
in 2009. The proposal at that stage was for a maximum of 23 turbines. A planning application was lodged in August 2011. The application was submitted by Aberdeen Renewable Energy Group (AREG) in cooperation with two other companies,
Vattenfall Vattenfall is a Swedish multinational corporation, multinational electrical power industry, power company owned by the List of government enterprises of Sweden, Swedish state. Beyond Sweden, the company generates power in Denmark, Finland, Germa ...
and
Technip Technip S.A. was a company that carried out project management, engineering and construction for the energy industry; in 2017 it completed a merger with FMC Technologies to form TechnipFMC. Its headquarters were in the 16th arrondissement of Par ...
. The proposal was for 11 turbines. Planning consent was granted by the Scottish government in March 2013. In May 2013 Vattenfall announced plans to reduce its stake in the project. In October 2013 Aberdeenshire councillors rejected a planning application to build an electricity substation. In December 2013 it was announced that construction would be delayed for two years, with connection of the grid occurring in 2017. In January 2014 an appeal against the substation vote was lodged. The developers won the appeal in July 2014. Vattenfall decided to proceed with the 92 MW wind farm in July 2016. The plan was for 11 turbines each of 8 MW placed 3 km from land, with a contract for the assembly of suction bucket foundations for the turbines contracted out to Smulders Projects UK.


Objections

American billionaire
Donald Trump Donald John Trump (born June 14, 1946) is an American politician, media personality, and businessman who is the 47th president of the United States. A member of the Republican Party (United States), Republican Party, he served as the 45 ...
purchased a large part of the Menie estate near the village of
Balmedie Balmedie () is a large village in Aberdeenshire in Scotland. It lies north of the city of Aberdeen, in the civil parish of Belhelvie. The long and wide beach is bordered by an extensive dune system that stretches from Aberdeen to just north o ...
in 2006. He proposed to build a golf course, with a hotel, holiday homes and a residential village. He expressed his concerns about the wind farm in April 2006 stating that "I want to see the ocean, I do not want to see windmills." In 2006
RSPB The Royal Society for the Protection of Birds (RSPB) is a Charitable_organization#United_Kingdom, charitable organisation registered in Charity Commission for England and Wales, England and Wales and in Office of the Scottish Charity Regulator, ...
Scotland expressed concern about the effect both the wind farm and Donald Trump's golf course would have on the wildlife on the Aberdeenshire coast. In 2011 the RSPB called for "more planning, research and monitoring ... to ensure we truly understand the impact this site may have on local birds." In September 2011
the Trump Organization The Trump Organization, Inc. is an American Conglomerate (company), conglomerate. Privately owned by Donald Trump, it serves as the holding company for most of Business career of Donald Trump, Trump's business ventures and investments, with ar ...
filed an objection to the planning application. By 2012 the RSPB dropped its opposition to the wind farm following the reduction in the number of turbines and a change in the layout." In May 2013 Trump launched a legal challenge against the Scottish government's decision to grant planning permission for the wind farm. The hearing began at the
Court of Session The Court of Session is the highest national court of Scotland in relation to Civil law (common law), civil cases. The court was established in 1532 to take on the judicial functions of the royal council. Its jurisdiction overlapped with othe ...
in November 2013, but was rejected in February 2014. An appeal against the decision was heard at the Court of Session in January 2015, but Trump lost the appeal in June 2015. After the decision Trump said he would appeal before both the Supreme Court of the UK and the European Courts. Trump's appeal was unanimously dismissed by the UK Supreme Court in December 2015.


Construction

Connection work began in early 2017. The turbines are mounted on unusual suction bucket
foundations Foundation(s) or The Foundation(s) may refer to: Common uses * Foundation (cosmetics), a skin-coloured makeup cream applied to the face * Foundation (engineering), the element of a structure which connects it to the ground, and transfers loads f ...
. The sea cables are 66kV. There are more than four miles of high voltage underground cable between the substation in
Dyce Dyce () is a suburb of Aberdeen, Scotland, situated on the River Don about northwest of the city centre. It is best known as the location of Aberdeen Airport. History Dyce is the site of an early medieval church dedicated to the 8th centu ...
(on the outskirts of Aberdeen) and the wind farm's onshore substation at Blackdog. The first foundation was installed offshore in March 2018, and the first turbine was installed in April. The eleventh and final turbine was erected near the end of May. First power was generated in July 2018, with full commissioning following in September 2018.


See also

*
List of offshore wind farms in the United Kingdom This is a list of offshore wind farms within the national maritime boundary, maritime boundaries of the United Kingdom. In April 2025 the nameplate capacity of offshore wind farms in operation was approximately 16 GW, with a further 8 GW under con ...
*
List of tallest structures in the United Kingdom This list contains all types of structures in height or more, which is the accepted criterion for a building to qualify as a skyscraper in the United Kingdom. Entries in ''italics'' denote approximate figures. indicates a structure that h ...