HOME



picture info

Block Telegraph
Absolute block signalling is a British signalling block system designed to ensure the safe operation of a railway by allowing only one train to occupy a defined section of track (block) at a time. Each block section is manually controlled by a signalman, who communicates with the other block sections via telegraph. This system was used on double or multiple lines where use of each line is assigned a direction of travel before the introduction of track circuits. A train approaching a section is ''offered'' by a signalman to his counterpart at the next signal box. If the section is clear, the latter ''accepts'' the train, and the first signalman may clear his signals to give permission for the train to enter the section. This communication traditionally takes place by bell codes and status indications transmitted over a simple telegraph wire circuit between signalmen using a device called a ''block instrument'', although some contemporary block working is operated wirelessly. ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Signalling Block System
Signalling block systems enable the safe and efficient operation of railways by preventing collisions between trains. The basic principle is that a track is broken up into a series of sections or "blocks". Only one train may occupy a block at a time, and the blocks are sized to allow a train to stop within them. That ensures that a train always has time to stop before getting dangerously close to another train on the same line. The block system is referred to in the UK as the ''method of working'', in the US as the ''method of operation'', and in Australia as ''safeworking''. In most situations, a system of signals is used to control the passage of trains between the blocks. When a train enters a block, signals at both ends change to indicate that the block is occupied, typically using red lamps or indicator flags. When a train first enters a block, the rear of the same train has not yet left the previous block, so both blocks are marked as occupied. That ensures there is sligh ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Robert Stephenson
Robert Stephenson , (honoris causa, Hon. causa) (16 October 1803 – 12 October 1859) was an English civil engineer and designer of locomotives. The only son of George Stephenson, the "Father of Railways", he built on the achievements of his father. Robert has been called the greatest engineer of the 19th century. Stephenson's death was widely mourned, and his funeral afforded marks of public honour. He is buried in Westminster Abbey. Early life Robert Stephenson was born on 16 October 1803, at Willington Quay, east of Newcastle upon Tyne, to George Stephenson and Frances ( Henderson), usually known as Fanny. She was twelve years older than George, and when they met she was working as a servant where George was lodging. After marrying, George and Fanny lived in an upper room of a cottage; George worked as a brakesman on the Stationary steam engine, stationary winding engine on the Quay, and in his spare time he cleaned and mended clocks and repaired shoes.In 1804, George bec ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Saxby And Farmer
John Saxby (17 August 1821 – 22 April 1913) was an English engineer from Brighton, noted for his work in railway signalling and the invention of the interlocking system of points and signals. He was later a partner in the firm Saxby and Farmer. He is regarded as "the father of modern signalling".Saxby & Farmer
on Polunnio


Biography

Saxby was born at Brighton on 17 August 1821 and in 1834 was apprenticed at the age of thirteen to a carpenter and joiner. In 1840 he was employed as a carpenter at the of the

picture info

Rule 55
Rule 55 was an operating rule which applied on British railways in the 19th and 20th centuries. It was superseded by the modular rulebook following re- privatisation of the railways. It survives, very differently named: the driver of a train waiting at a signal on a running line must remind the signaller of its presence. Rule 55 was introduced following a spate of accidents caused by signalmen forgetting that trains were standing on a running line, sometimes within sight of their signal boxes. It required that, if a train was brought to a stand at a signal, within three minutes in clear weather or immediately in rain, snow, or fog, the driver of the train must despatch his fireman, guard, or any shunter riding on the train, to the signal box to ensure that the signalman was aware of the presence of the train, and that all safeguards to protect it, such as slides or collars on the signal levers, were in place, the crewman then signing the train register to confirm this. In pra ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Heritage Railway
A heritage railway or heritage railroad (U.S. usage) is a railway operated as living history to re-create or preserve railway scenes of the past. Heritage railways are often old railway lines preserved in a state depicting a period (or periods) in the history of rail transport. Definition The British Office of Rail and Road defines heritage railways as follows:...'lines of local interest', museum railways or tourist railways that have retained or assumed the character and appearance and operating practices of railways of former times. Several lines that operate in isolation provide genuine transport facilities, providing community links. Most lines constitute tourist or educational attractions in their own right. Much of the rolling stock and other equipment used on these systems is original and is of historic value in its own right. Many systems aim to replicate both the look and operating practices of historic former railways companies. Infrastructure Heritage railway li ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  




Pan Books
Pan Books is a British publishing imprint that first became active in the 1940s and is now part of the British-based Macmillan Publishers, owned by the Georg von Holtzbrinck Publishing Group of Germany. History Pan Books began as an independent publisher, established in 1944 by Alan Bott, previously known for his memoirs of his experiences as a flying ace in the First World War. The Pan Books logo, showing the ancient Greek god Pan playing pan-pipes, was designed by Mervyn Peake. The later version was by Edward Young who also designed the logo for Penguin. A few years after it was founded, Pan Books was bought out by a consortium of several publishing houses, including Macmillan, Collins, Heinemann, and briefly, Hodder & Stoughton. It became wholly owned by Macmillan in 1987. Pan specialised in publishing paperback fiction and, along with Penguin Books, was one of the first popular publishers of this format in the UK. Many popular authors saw their works given paperb ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Token (railway Signalling)
In railway signalling, a token is a physical object which a train driver is required to have or see before entering onto a particular section of single track. The token is clearly endorsed with the names of the section to which it belongs. A token system is more commonly used for single lines because of the greater risk of collision in the event of a mistake being made by a signaller or traincrew than on double lines. Principle The operation of a bidirectional single track line has the hazard of two trains colliding. The simplest way to prevent such collisions is to have only one train in the section at any given time. Such a system is known as "one-engine-in-steam” (OES) or “one-train working" (OTW). This system is used on some branches of rail networks, and on heritage railways. The main disadvantage is that it restricts the number of train movements that can be made. For a larger railway system, it becomes exceptionally limiting in the level of operations that it all ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

East London Line
The East London line is a railway line running north to south through the East, Docklands and South areas of London. It is used by London Overground services. It was previously a line of the London Underground. Built in 1869 by the East London Railway Company, which reused the Thames Tunnel intended for horse-drawn carriages, the line became part of the London Underground network in 1933. After nearly 75 years as part of that network, it closed on 22 December 2007 for an extensive refurbishment and expansion, reopening as part of the Overground network in April 2010. Phase 2, which links the line to the South London line with a terminus at , opened on 9 December 2012, creating an orbital railway around inner London. In 2024, London Overground services on the line were rebranded the Windrush line. History Establishment of the East London Railway The East London Railway (ELR) was created by the East London Railway Company, a consortium of six railway companies: the G ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Freight Operating Company
The Rail transport in Great Britain, railway network in Great Britain has been used to transport cargo, goods of various types and in varying volumes since the early 19th century. Network Rail, which owns and maintains the network, aims to increase the amount of goods carried by rail. In 2015–16 Britain's railways moved 17.8 billion net tonne kilometres, a 20% fall compared to 2014–15.Office of Rail Regulation, http://orr.gov.uk/__data/assets/pdf_file/0012/22008/freight-rail-usage-2015-16-quarter-4.pdf Coal accounted for 13.1% of goods transport in Britain, down considerably from previous years. There are no goods transported by railway in Northern Ireland. History Pre-19th century Even in the 16th century, mining engineers used crude wooden rails to facilitate the movement of mine wagons steered by hand. In Nottingham, 1603, a tramway was constructed to transport coal from mines near Strelley to Wollaton. Horse-drawn lines were increasingly common by the 18th and early 1 ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


Train Operating Company
In the railway system of Great Britain, a train operating company (TOC) is a railway undertaking operating passenger trains under the collective National Rail brand. TOCs have existed since the privatisation of the network under the Railways Act 1993. There are two types of TOC: most hold franchises let by the Department for Transport (DfT) through a tendering system, to operate services on certain routes for a specified duration, while a small number of open-access operators hold licences to provide supplementary services on chosen routes. These operators can run services for the duration of the licence validity. The franchised operators have changed considerably since privatisation: previous franchises have been divided, merged, re-let to new operators, or renamed. Some privately-operated franchises have been taken over by a government-owned operator of last resort, due either to failing expectations or to events on the rail system as a whole. The term is also sometimes ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


Overlap (railway Signalling)
An overlap in railway signalling is the length of track beyond a stop signal that is proved to be clear of vehicles in the controls of the previous signal, as a safety margin. Overview Enough braking distance is provided to allow a train to comfortably stop at the stop signal, but should it fail to do so for any reason (fog, smoke, slippery rails, brake failure, inattention by driver, etc.) there is still some distance to allow the train to stop short of any obstruction, such as another train. Length The length of an overlap may be a nominal length, or else calculated on the full emergency braking distance for the gradients and speeds for that particular section of line. Two signal protection If the overlap is long enough to extend from one stop signal to the next, then the effect is to provide two signal protection (or "double blocking"), with the first signal having a full overlap, and the second signal having a short overlap. With two signal protection, only one trac ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]