West Toronto Railpath
   HOME

TheInfoList



OR:

The West Toronto Railpath is a
multi-use trail A shared-use path, mixed-use path or multi-use pathway is a path which is 'designed to accommodate the movement of pedestrians and cyclists'. Examples of shared-use paths include sidewalks designated as shared-use, bridleways and rail trails. A ...
in
Toronto Toronto ( ; or ) is the capital city of the Canadian province of Ontario. With a recorded population of 2,794,356 in 2021, it is the most populous city in Canada and the fourth most populous city in North America. The city is the anch ...
,
Ontario Ontario ( ; ) is one of the thirteen provinces and territories of Canada.Ontario is located in the geographic eastern half of Canada, but it has historically and politically been considered to be part of Central Canada. Located in Central C ...
,
Canada Canada is a country in North America. Its ten provinces and three territories extend from the Atlantic Ocean to the Pacific Ocean and northward into the Arctic Ocean, covering over , making it the world's second-largest country by tot ...
, running from
The Junction The Junction is a neighbourhood in Toronto, Ontario, Canada, that is near the West Toronto Diamond, a junction of four railway lines in the area. The neighbourhood was previously an independent city called West Toronto, that was also its own fe ...
neighbourhood toward downtown Toronto. The Railpath was developed by the City of Toronto for bicycle and pedestrian use. Like Toronto's
Beltline The Atlanta BeltLine (also Beltline or Belt Line) is a open and planned loop of multi-use trail and light rail transit system on a former railway corridor around the core of Atlanta, Georgia. The Atlanta BeltLine is designed to reconnect nei ...
and
Don Mills Don Mills is a mixed-use neighbourhood in the North York district of Toronto, Ontario, Canada. It was developed to be a self-supporting "new town" and was at the time located outside Toronto proper. In 1998, North York, including the Don Mills com ...
trails, it is an urban rail-to-trail project. Phase 1 of the path opened in 2009. Phase 2, an extension south from Dundas Street West to Liberty Village, was approved and proceeding with detailed design as of September 2020 with funding of $2.9 million jointly from the City and the
Government of Canada The government of Canada (french: gouvernement du Canada) is the body responsible for the federal administration of Canada. A constitutional monarchy, the Crown is the corporation sole, assuming distinct roles: the executive, as the ''Crown ...
. Construction of Phase 2 is expected to begin in 2023.


History

Following a trade route that Indigenous people used from the Davenport Trail to Lake Iroquois, this route formed the path of a railway that started in 1871. In 1868, the Toronto, Grey and Bruce Railway was incorporated to provide rail service connecting Toronto to Southampton and Owen Sound (and points in between). Sections of this railway in Toronto ran along the rights of way of other existing railways. As this railway was a different (narrower) gauge, a separate set of tracks was required along the right of way. Due to service problems associated with the narrow gauge, the line was eventually converted to standard gauge in 1881. By 1883, the Canadian Pacific Railway had acquired the line. Into the 1960s, the portion of the track around Dupont was known as "The Old Bruce". It served several industries, including the Viceroy plant and the scrapyard. The City of Toronto Economic Development and Parks Committee and grassroots community support began for this project before 1990, but the project necessitated the purchase of land and negotiations with rail operators and other stakeholders. Organizations involved include the Evergreen Foundation and, although the railpath is multi-use, notable advocacy by bicycling interests such as Toronto's Community Bicycle Network. The City of Toronto first authorized purchase of the land for the portion from Cariboo Avenue to Dundas Street West (known as the CP LEAD spur) in 1997. Funds to the amount of $920,000 were approved in 2000. This land was acquired in July 2003 by the City of Toronto from the St. Lawrence and Hudson Railway. The purchase agreement demanded that the vendor remediate the soil to industrial standards. After acquiring the lands, the City of Toronto needed to terminate a lease that a salvage yard (M&S Waste and Salvage) had for a portion of the land, leased when the land was owned by Canadian Pacific. Construction of Phase 1 of the path, running from Cariboo Avenue to
Dundas Street West Dundas Street is a major historic arterial road in Ontario, Canada. The road connects the city of Toronto with its western suburbs and several cities in southwestern Ontario. Three provincial highways— 2, 5, and 99—followed long sections ...
and Sterling Road, was designed by Scott Torrance Landscape Architect Inc. in conjunction with Brown and Storey Architects, and began in 2008 and was completed in 2009. The project combined the restoration of historical rail bridges with the installation of new public art pieces by artist John Dickson, all situated among indigenous planting. New entrance points at Dupont and Bloor streets allow pedestrians to access the trail from the street and use the restored rail bridges that cross over these streets. Concrete plazas are located along the trail where existing streets intersect it, providing neighbourhood connections and gathering places. The realization of Phase 2 will be coordinated with the Metrolinx's Georgetown South Project, a planned expansion of rail capacity along the line for
GO Transit GO Transit is a regional public transit system serving the Greater Golden Horseshoe region of Ontario, Canada. With its hub at Union Station in Toronto, GO Transit's green-and-white trains and buses serve a population of more than seven millio ...
and the existing
Union Pearson Express The Union Pearson Express (UP Express or UPX) is an airport rail link connecting Union Station in Downtown Toronto to Toronto Pearson International Airport. The UP Express began operation on 6 June 2015, in time for the 2015 Pan American Games. ...
.


Location and phases

In total, the railpath is proposed to run about 4 km from Cariboo Avenue in The Junction to Strachan Avenue near the downtown core (se
map
. Like other rail trail projects, the path runs along railway rights-of-way established many years ago that have been narrowed or abandoned. Phase 1 is 2.1 km long, beginning at Cariboo Avenue and running southeast to
Dundas Street West Dundas Street is a major historic arterial road in Ontario, Canada. The road connects the city of Toronto with its western suburbs and several cities in southwestern Ontario. Three provincial highways— 2, 5, and 99—followed long sections ...
and Sterling Road. The contract for Phase 1 construction was awarded in April 2008 at a cost of (CDN) $3.8 million. Construction began in 2008 and was completed in summer 2009, with the formal opening on October 30, 2009. Phase 2 will continue a further 2 km from Dundas Street West and Sterling Road southeast and east to Strachan Avenue and Wellington Street, providing access to the Wellington Street bicycle lane, near the
Liberty Village Liberty Village is a neighbourhood in Toronto, Ontario, Canada. It is bordered to the north by King Street West, to the west by Dufferin Street, to the south by the Gardiner Expressway, to the east by Strachan Avenue, and to the northeast by the ...
development. Rail line capacity expansion projects by Metrolinx could potentially conflict with Phase 2.
Toronto City Council Toronto City Council is the governing body of the municipal government of Toronto, Ontario. Meeting at Toronto City Hall, it comprises 25 city councillors and the mayor of Toronto. The current term began on November 15, 2022. Structure The c ...
continues to support the railpath. Metrolinx has indicated that it will work with the railpath's advocates to try to include the path as part of the Georgetown South expansion plans. The West Toronto Railpath Extension Study was completed and approved by Toronto City Council in January 2016 and included the functional design of the extension. In August 2016, the federal government announced funding, in partnership with the province, for detailed design and implementation with design work planned to commence in September 2016. Public consolation and feedback was completed in March 2020 and construction of the phase 2 extension is expected to begin in 2021 or 2022


Other Toronto railpaths

* Beltline Trail * Don Mills Trail


See also

* List of trails in Canada


Notes


References

*"Narrow Gauge Through the Bush - Ontario's Toronto Grey and Bruce Railway and Toronto and Nipissing Railway"; Rod Clarke; pub. Beaumont and Clarke, with the Credit Valley Railway Company, Streetsville, Ontario, 2007. *"Narrow Gauge Railways of Canada"; Omer Lavallee; pub. Railfair, Montreal, 1972. *"Narrow Gauge Railways of Canada"; Omer Lavallee, expanded and revised by Ronald S Ritchie; pub. Fitzhenry and Whiteside, Markham, Ontario, 2005. *"The Toronto Grey and Bruce Railway 1863-1884; Thomas F McIlwraith; pub. Upper Canada Railway Society, Toronto, 1963. *"Steam Trains to the Bruce"; Ralph Beaumont; pub. The Boston Mills Press; Cheltenham, Ontario, 1977. *"Running Late on the Bruce"; Ralph Beaumont & James Filby; pub The Boston Mills Press, Cheltenham, Ontario, 1980.


External links


Friends of the West Toronto Railpath

West Toronto Railpath Extension
- project targeted for 2020-2022, aka "Phase 2"
Cycling in Toronto
{{Canadian Trails Transport in Toronto Rail trails in Ontario Linear parks Elevated parks