Van Ness Bus Rapid Transit is a
bus rapid transit Bus rapid transit (BRT), also called a busway or transitway, is a bus-based public transport system designed to have much more capacity, reliability and other quality features than a conventional bus system. Typically, a BRT system includes ...
(BRT) corridor on
Van Ness Avenue Van Ness Avenue is a north–south thoroughfare in San Francisco, California. Originally named Marlette Street, the street was renamed Van Ness Avenue in honor of the city's sixth mayor, James Van Ness. The main part of Van Ness Avenue runs fro ...
in
San Francisco San Francisco (; Spanish for " Saint Francis"), officially the City and County of San Francisco, is the commercial, financial, and cultural center of Northern California. The city proper is the fourth most populous in California and 17t ...
,
California California is a state in the Western United States, located along the Pacific Coast. With nearly 39.2million residents across a total area of approximately , it is the most populous U.S. state and the 3rd largest by area. It is also the m ...
, United States. The line, which runs between
Mission Street Mission Street is a north-south arterial thoroughfare in Daly City and San Francisco, California that runs from Daly City's southern border to San Francisco's northeast waterfront. The street and San Francisco's Mission District through which it ...
and Lombard Street, has dedicated center
bus lane A bus lane or bus-only lane is a lane restricted to buses, often on certain days and times, and generally used to speed up public transport that would be otherwise held up by traffic congestion. The related term busway describes a roadwa ...
s and nine stations. It was built as part of the $346 million Van Ness Improvement Project, which also included utility replacement and pedestrian safety features. Van Ness Bus Rapid Transit is used by several
San Francisco Municipal Railway The San Francisco Municipal Railway (SF Muni or Muni), is the public transit system for the City and County of San Francisco. It operates a system of bus routes (including trolleybuses), the Muni Metro light rail system, three historic cabl ...
(Muni) lines including the 49 Van Ness–Mission, as well as three
Golden Gate Transit Golden Gate Transit (GGT) is a public transportation system serving the North Bay region of the San Francisco Bay Area in California, United States. It primarily serves Marin County, Sonoma County, and San Francisco, and also provides limited s ...
routes. Public transit on Van Ness Avenue began with
streetcar A tram (called a streetcar or trolley in North America) is a rail vehicle that travels on tramway tracks on public urban streets; some include segments on segregated right-of-way. The tramlines or networks operated as public transport a ...
service in 1915. It was replaced by
trolleybus A trolleybus (also known as trolley bus, trolley coach, trackless trolley, trackless tramin the 1910s and 1920sJoyce, J.; King, J. S.; and Newman, A. G. (1986). ''British Trolleybus Systems'', pp. 9, 12. London: Ian Allan Publishing. .or trol ...
es in 1950–51, with diesel bus routes later added. Planning for a rail line on the corridor began in 1989 with the passage of a
ballot measure A referendum (plural: referendums or less commonly referenda) is a direct vote by the electorate on a proposal, law, or political issue. This is in contrast to an issue being voted on by a representative. This may result in the adoption o ...
. By 1995, it was to be the last of four major rail corridors constructed in the city. The planned mode was replaced with BRT in 2003, with studies and environmental analysis lasting the next decade. Construction began in June 2016; the planned completion in 2019 was delayed several times. The corridor opened to service on April 1, 2022.


Design

The Van Ness BRT corridor is long, running north–south between Lombard Street and Mission Street. Van Ness Avenue has six travel lanes on this section – two general-purpose lanes in each direction, plus center-running red bus lanes. Nine stations are located along the corridor, each with
side platforms A side platform (also known as a marginal platform or a single-face platform) is a platform positioned to the side of one or more railway tracks or guideways at a railway station, tram stop, or transitway. A station having dual side platforms ...
on the right side of buses. A landscaped center median is located between the bus lanes except at stations. The northbound bus lane exits at Filbert Street, with a marked transition for buses to move to the curb lane. The red lanes on Van Ness are poured red concrete, rather than paint or thermoplastic markings applied over conventional pavement, for increased durability. A layer of
reinforced concrete Reinforced concrete (RC), also called reinforced cement concrete (RCC) and ferroconcrete, is a composite material in which concrete's relatively low ultimate tensile strength, tensile strength and ductility are compensated for by the inclusion ...
was poured as the foundation, followed by a curing compound. The red concrete was then poured, with
dowel basket A dowel is a cylindrical rod, usually made of wood, plastic, or metal. In its original manufactured form, a dowel is called a ''dowel rod''. Dowel rods are often cut into short lengths called dowel pins. Dowels are commonly used as structural r ...
s to join adjacent slabs, then topped with a color hardener layer. The finished lane pavement has a compressive strength of , 60% stronger than a typical roadway, extending its life.


Services and stations

All services using Van Ness BRT operate only part of their length on the BRT lanes; they operate in mixed traffic or on separately installed bus lanes off the Van Ness corridor. SFMTA normally operates two primary routes along the full length of the BRT corridor – 47 Van Ness and 49 Van Ness-Mission – with combined
headway Headway is the distance or duration between vehicles in a transit system measured in space or time. The ''minimum headway'' is the shortest such distance or time achievable by a system without a reduction in the speed of vehicles. The precise defi ...
s as low as 3.5 minutes; several other routes (including the 30X Stockton Express, 76X Marin Headlands, 79X Arena Express, and 90 San Bruno Owl) operate on part or all of the corridor at lower frequencies. In April 2020, SFMTA suspended the 47 Van Ness bus route due to the
COVID-19 pandemic in California Ten of the first twenty confirmed COVID-19 cases in the United States occurred in California, the first of which was confirmed on January 26, 2020. All of the early confirmed cases were persons who had recently travelled to China, as testing wa ...
, leaving only route 49 running the full length of Van Ness BRT. Golden Gate Transit (GGT) operates three routes along the Van Ness BRT corridor: 101, 130 (formerly 30), and 150 (formerly 70). GGT buses use only the seven stops from Union to Eddy, as they run on Golden Gate Avenue and McAllister Street to reach downtown San Francisco. The Van Ness BRT alignment has nine stations named after cross streets. Market Street station is located at Van Ness station, providing transfer to
Muni Metro Muni Metro is a light rail system serving San Francisco, California, United States. Operated by the San Francisco Municipal Railway (Muni), a part of the San Francisco Municipal Transportation Agency (SFMTA), Muni Metro served an average of 15 ...
, while a transfer to the Geary BRT service is available at Geary–O'Farrell station.


Cost

As rated in November 2014 by the
Federal Transit Administration The Federal Transit Administration (FTA) is an agency within the United States Department of Transportation (DOT) that provides financial and technical assistance to local public transportation systems. The FTA is one of ten modal administratio ...
(FTA), the project was planned to cost $162.7 million, with approximately $75 million to be provided as federal funding under the Small Starts Project Development Program. In December 2016, the FTA awarded the $75 million Small Starts grant. The entire Van Ness Improvement Project had a budget of $309 million when construction began. By 2022, the budget for only the transit improvements had grown to $169.6 million, with a total project cost of $346 million. Part of the increased cost was covered by contingency funds in the original funding; the FTA also awarded an additional $21.9 million to the project in 2021 using funds allotted from the
American Rescue Plan The American Rescue Plan Act of 2021, also called the COVID-19 Stimulus Package or American Rescue Plan, is a economic stimulus bill passed by the 117th United States Congress and signed into law by President Joe Biden on March 11, 2021, to s ...
. A 2021 civil grand jury report determined the planning process had failed to account for the location and future maintenance of underground utility lines; because existing water and sewer lines were buried under the center of Van Ness, they had to be relocated curbside to avoid future disruption of BRT service when these utilities required maintenance. The choice of center bus lanes, rather than side lanes, also required substantial reconfiguration and temporary de-energization of the
trolleybus A trolleybus (also known as trolley bus, trolley coach, trackless trolley, trackless tramin the 1910s and 1920sJoyce, J.; King, J. S.; and Newman, A. G. (1986). ''British Trolleybus Systems'', pp. 9, 12. London: Ian Allan Publishing. .or trol ...
wires. The report found that the choice of center lanes increased the cost and complexity of the project, as well as the overall benefits. Although the general position of the existing utility lines was known as early as 2006, detailed survey maps and routing were not developed until after the project had started construction, and the task of determining exact utility routing fell on the construction contractor rather than SFMTA, exceeding the contractor's intended scope of responsibilities and causing project cost and schedule overruns.


Public art

In August 2013, a selection panel of the
San Francisco Arts Commission The San Francisco Arts Commission (SFAC) is the City agency that champions the arts as essential to daily life by investing in a vibrant arts community, enlivening the urban environment and shaping innovative cultural policy in San Francisco, Cal ...
(SFAC) recommended the proposal from Cuban-born artist Jorge Pardo for consideration by the full SFAC over competing proposals from
Norie Sato Norie Sato (born July 19, 1949) is an artist living in Seattle, Washington. She works in the field of public art using sculpture and various media–including glass, terrazzo, plastic film, stone, and metal–and often incorporating lighting effec ...
and
Janet Zweig Janet Zweig (born April 4, 1950) is an American artist whose work consists primarily of art in the public realm and computer-driven language-generating sculpture. Life and career Janet Zweig was born in Milwaukee, WI, raised in Chicago, IL, and ...
for a series of three sculptures that would be installed at the Market, Sutter and Union stations. Pardo presented a formal proposal in 2015, calling for a series of caged
weathering steel Weathering steel, often referred to by the genericised trademark COR-TEN steel and sometimes written without the hyphen as corten steel, is a group of steel alloys which were developed to eliminate the need for painting, and form a stable r ...
sculptures, lit from within. According to Pardo, the three sculptures were intended to be "urban coastal redwood ... made of steel, light and weather". The SFAC formally selected Pardo in September 2015. By 2017, the proposed work and location had been consolidated to a single installation at the two McAllister station platforms; each platform would have thirteen steel-and-polycarbonate light sculptures, distinguished by a warm or cool palette. The Arts Commission authorized a budget of $815,000 for the work on October 2, 2017. This final design subsequently was moved to the Geary–O'Farrell station, with the cool palette on the southbound platform and the warm palette on the northbound platform.


Criticism

Some automobile drivers complained about possible changes in traffic patterns and loss of automobile parking along the corridor. Concerns that trees would be removed were met with plans to plant more trees on the route. Residents supportive of the project complained about continued delays in completing the project, and that the project took longer to complete than other similar projects in other cities because the SFMTA did not close the street to automobile traffic during construction. Businesses along Van Ness complained of lost customers due to construction disruption and the delays in completion. Mayor Ed Lee announced a Construction Mitigation Program (CMP) in September 2017 to provide grants to businesses affected by transit construction, but the focus of that program primarily focused on Union Square businesses and Central Subway construction. CMP funds were not available until November 2019, and were not opened for Van Ness businesses until September 2020. The project has been criticized for using platforms, the standard sidewalk height, instead of platforms that would match the level of the bus floor to allow for level boarding. Field tests indicated that interference with wheel lug nuts would create a gap at least wide between the edge of a 14-inch-high platform and the boarding doors, and bridge plates would be required at middle doors to meet
ADA Ada may refer to: Places Africa * Ada Foah, a town in Ghana * Ada (Ghana parliament constituency) * Ada, Osun, a town in Nigeria Asia * Ada, Urmia, a village in West Azerbaijan Province, Iran * Ada, Karaman, a village in Karaman Province, T ...
standards for level boarding; the added complexity could impact vehicle reliability. In addition, because the buses would also operate outside the Van Ness BRT corridor, they would continue to need to be equipped with boarding ramps at the front door for regular curbside service.


Concrete poles

The original concrete poles built to support the overhead electrical supply lines for the
streetcar A tram (called a streetcar or trolley in North America) is a rail vehicle that travels on tramway tracks on public urban streets; some include segments on segregated right-of-way. The tramlines or networks operated as public transport a ...
s in 1914 were moved onto the sidewalks in 1936 to accommodate the widening of Van Ness. Since then, the poles have deteriorated due to extra loads from additional wires (added for the electrical return path when the lines were converted to trolleybus service) and modified catenary geometry, exhibiting significant spalling and cracking. In some cases, Muni has supplemented the original concrete poles by moving wires onto adjacent, modern metal poles. By the mid-1980s, records show the city was concerned the original poles could not support their existing loads and starting in 1997, began replacing missing cast iron pole bases with fiberglass replicas. A 2009 evaluation of the original 1914/36 poles concluded they could not be rehabilitated and retrofitted for use on the modern BRT line because of their shape, height, and inadequate foundation. A separate report determined the original trolley poles were not eligible for retention on a historical basis due to their loss of physical integrity. The city's Historic Preservation Commission provided conditional approval to remove the original 1914/1936 trolley poles and streetlamps in November 2015, but preservationists were concerned over the loss of the Van Ness "Ribbon of Light" and three prominent organizations formed the "Coalition to Save the Historic Streetlamps of Van Ness Avenue" in 2016. The Board of Supervisors unanimously passed a resolution on September 20, 2016, urging SFMTA to "make all efforts to preserve the historic character of the Van Ness Corridor". As a result, SFMTA approved the installation of 350 vintage-style light fixtures at a cost of $18,500 each, adding $6.5 million to the project cost. Ironically, because the proposed fixtures are insufficiently faithful to the original design, the Historic Preservation Commission required that modern-style light poles be used in the Civic Center Historic District instead as "they don't create a lot of visual clutter". As a compromise, four poles were retained and restored in front of
San Francisco City Hall San Francisco City Hall is the seat of government for the City and County of San Francisco, California. Re-opened in 1915 in its open space area in the city's Civic Center, it is a Beaux-Arts monument to the City Beautiful movement that epitomi ...
and
War Memorial Plaza War Memorial Plaza is a public square, small park and space in Downtown Baltimore between City Hall and the War Memorial Building, between Holliday Street on the west, East Fayette Street on the south, North Gay Street on the east, and East Lexin ...
.


History


Early streetcar and bus service

The
San Francisco Municipal Railway The San Francisco Municipal Railway (SF Muni or Muni), is the public transit system for the City and County of San Francisco. It operates a system of bus routes (including trolleybuses), the Muni Metro light rail system, three historic cabl ...
was formed in 1909 and opened its first line on Geary Boulevard in 1912. A
bond issue In finance, a bond is a type of security under which the issuer (debtor) owes the holder ( creditor) a debt, and is obliged – depending on the terms – to repay the principal (i.e. amount borrowed) of the bond at the maturity date as well as ...
to build routes serving the 1915
Panama–Pacific International Exposition The Panama–Pacific International Exposition was a world's fair held in San Francisco, California, United States, from February 20 to December 4, 1915. Its stated purpose was to celebrate the completion of the Panama Canal, but it was widely s ...
was approved in 1913. Construction work started on a Van Ness Avenue line on April 6, 1914; electrical and track work were completed by August 15 of that year, earning the contractors a $15,000 bonus (). As completed, the line on Van Ness included 259 concrete poles to support the overhead electrical supply wires, and streetlights were added to the poles one year later. Streetcar service on Van Ness Avenue began on August 15, 1914. The H Potrero ran the full length of Van Ness Avenue between Bay Street and Market Street, while the D Geary–Van Ness ran on Van Ness Avenue north of Geary Street. Service on the F Stockton route, which used Van Ness Avenue between North Point Avenue and Chestnut Street, began on December 29, 1914. Several other routes also ran on Van Ness for short periods: G Exposition and I Exposition in 1915, J Exposition in 1915–16, J Church in 1917–18, K Ingleside in 1918, and E Union Street and O Van Ness in 1932. Van Ness, famed as the widest street in the city and for its row of auto dealerships, also became busy with automobile traffic, as it became part of
U.S. Route 101 U.S. Route 101, or U.S. Highway 101 (US 101), is a north–south United States Numbered Highway that runs through the states of California, Oregon, and Washington, on the West Coast of the United States. It is also known as (The Royal Roa ...
in 1926. In 1934, with the opening of the
Golden Gate Bridge The Golden Gate Bridge is a suspension bridge spanning the Golden Gate, the strait connecting San Francisco Bay and the Pacific Ocean. The structure links the U.S. city of San Francisco, California—the northern tip of the San Francisco Pen ...
imminent, the
San Francisco Board of Supervisors The San Francisco Board of Supervisors is the legislative body within the government of the City and County of San Francisco. Government and politics The City and County of San Francisco is a consolidated city-county, being simultaneously a c ...
proposed to expand surface streets to facilitate automobile traffic, including widening Van Ness from Market to Bay. The widening of the roadway was carried out in 1936 by narrowing the sidewalks. Soon after, the center-running streetcars on Van Ness were faulted for potentially holding up automobiles by their frequent stops. Streetcar service was discontinued on Van Ness — D and H in 1950, and F in 1951 — and the overhead lines were reused for trolleybus service. A median with trees was built down the center of Van Ness. The 47 Potrero (later 47 Van Ness) trolleybus service that replaced the H Potrero became the primary transit service on Van Ness Avenue for the next several decades, with the 45 Van Ness (the former D) supplementing it between Union Street and Sutter Street, and the 30 Stockton (the former F) between North Point and Chestnut streets. Route 30X Freeway Express (now 30X Marina Express) began using Van Ness Avenue between Broadway and Chestnut Street in 1956.
Golden Gate Transit Golden Gate Transit (GGT) is a public transportation system serving the North Bay region of the San Francisco Bay Area in California, United States. It primarily serves Marin County, Sonoma County, and San Francisco, and also provides limited s ...
bus service to San Francisco began in January 1972. Civic Center routes used Van Ness Avenue between Lombard Street and McAllister Street, while Financial District routes used it between Lombard Street and North Point Street. Route 76 Fort Cronkite (now 76X Marin Headlands Express) began intermittent service on Van Ness Avenue in 1976, while the 42 Downtown Loop began operating along the full length of Van Ness Avenue on September 10, 1980. The 49 Van Ness–Mission trolleybus route began operation on August 24, 1983. Route 45 was rerouted off Van Ness Avenue on October 1, 1988, becoming the 45 Union/Stockton. The 47 and the western portion of the 42 were merged into the 47 Van Ness on June 9, 2001.


Bus rapid transit planning

The Proposition B sales tax expenditure plan, approved in 1989, included funding for "transit service improvements on Van Ness Avenue". The transit expansion part of the expenditure plan formed the basis of the 1995 Four Corridor Plan by the
San Francisco County Transportation Authority The San Francisco County Transportation Authority (SFCTA) is a state chartered sub-regional transportation planning and programming agency for San Francisco County. SFCTA is a separate legal entity from the San Francisco Municipal Transportation ...
(SFCTA), which planned for rail expansions along four priority corridors including Van Ness. The other three corridors included the Bayshore Corridor, which was implemented as the
T Third Street The T Third Street is a Muni Metro light rail line in San Francisco, California. It runs along the east side of San Francisco — primarily in the median of Third Street — from to the Market Street subway. It is interlined with th ...
Muni line; a proposed rail line along
Geary Boulevard Geary Boulevard (designated as Geary Street east of Van Ness Avenue) is a major east–west thoroughfare in San Francisco, California, United States, beginning downtown at Market Street near Market Street's intersection with Kearny Street, an ...
, which ultimately became the
Geary Bus Rapid Transit The Geary Bus Rapid Transit project added bus rapid transit features to San Francisco Municipal Railway lines along Geary Boulevard. The corridor serves routes , , , which combined to serve 52,900 daily riders in 2019, the most of any corridor i ...
project; and a third corridor to North Beach, implemented as the Central Subway project. The Van Ness corridor was to be the last of the four corridors, beyond the twenty year planning timeline of Proposition B. Under the Four Corridor plan, a rail line was to be built along Van Ness Avenue and
Mission Street Mission Street is a north-south arterial thoroughfare in Daly City and San Francisco, California that runs from Daly City's southern border to San Francisco's northeast waterfront. The street and San Francisco's Mission District through which it ...
from Aquatic Park to
16th Street Mission station 16th Street Mission station is a Bay Area Rapid Transit station located under Mission Street at 16th Street in the Mission District of San Francisco, California. Service at the station began, along with other stations between Montgomery Street ...
, with a subway section between Market and Pacific streets. In 2003, with Proposition B expiring in 2010, Proposition K was passed to provide additional sales tax funds. Its specified expenditure plan included BRT on the Geary and Van Ness corridors; these were identified as part of the New Expenditure Plan in the SFCTA Countywide Transportation Plan of 2004. Collectively, the Geary and Van Ness corridors had more than 200,000 automobile-based person-trips per day, with BRT implementation anticipated to remove approximately 4,500 vehicles at peak periods. For Van Ness, the project was planned to include
transit signal priority Bus priority or transit signal priority (TSP) is a name for various techniques to improve service and reduce delay for mass transit vehicles at intersections (or junctions) controlled by traffic signals. TSP techniques are most commonly associat ...
. The SFCTA began to formally plan the project in 2004, with revenue service then planned for 2012. A feasibility study was completed in 2006. The proposed projects on Van Ness and Geary were anticipated to have short construction times (between 18 and 24 months) and lower costs than rail lines. The feasibility study was followed by a Technical Memorandum in 2008 and the Draft Environmental Impact Statement/Environmental Impact Report (DEIS) in 2011. The DEIS identified three possible designs: curb lanes, median lanes with side platforms, and median lanes with a center
island platform An island platform (also center platform, centre platform) is a station layout arrangement where a single platform is positioned between two tracks within a railway station, tram stop or transitway interchange. Island platforms are popular o ...
s. The proposed service was estimated to reduce overall travel time by one-third and increase ridership by approximately the same proportion. Alternative 3 – center median lanes with side platforms was identified as the locally-preferred option in 2013 and selected for implementation. The analysis showed that dedicated center lanes for BRT coupled with restricted left turns provided the greatest reduction in travel time compared with existing conditions, with up to 930 passengers per hour per lane with BRT versus 680 via private automobile. Alternative 4 (center platforms), which was not chosen, had carried an additional risk for vehicle procurement. Buses with doors on both sides would be needed, which would be a custom order as no trolleybus was available in North America with dual-sided boarding. The Final Environmental Impact Statement was released in July 2013, and approved by the SFCTA and SFMTA that September. Changes from the DEIS included several platform locations and elimination of most left turns on Van Ness. Both agencies also approved the addition of an optional southbound platform at Vallejo Street (the northbound platform was already added in the LPA). The
Federal Transit Administration The Federal Transit Administration (FTA) is an agency within the United States Department of Transportation (DOT) that provides financial and technical assistance to local public transportation systems. The FTA is one of ten modal administratio ...
approved the FEIS in December 2013. The "lengthy planning, review, and public-participation process" in 2014 was faulted for causing delays in BRT implementation, as opposition to the removal of an automobile lane and impacts to parking were not offset by a local working example demonstrating its benefits. In addition, local opposition to the Van Ness BRT project included public hearings over median changes and tree removal, despite promises to replace 200 mature trees with 400 saplings. Addenda regarding parking loss and street tree removal were published in 2014 and 2016. By 2015, the new BRT service was scheduled to open in early 2019.


Construction and opening

The first phase of construction involved the removal and replacement of underground water and sewer lines, some of which dated back to the 19th century. Half of the road width was closed at a time, with construction proceeding south simultaneously from Lombard Street and Sutter Street. This first phase was originally expected to last two years; BRT construction in the second phase was to last one year, while operator training, tree planting, and sidewalk work would last two months. Nine bus stops were eliminated on June 4, 2016, to speed up buses during construction and match the BRT stop spacing. General traffic was reduced from three lanes per direction to two in October 2016, and most left turns were eliminated in November. The one-way Franklin and Gough streets to the west received traffic signal upgrades to accommodate traffic diverted from Van Ness. A groundbreaking ceremony was held on March 1, 2017, with completion then still planned for 2019. The median was cleared of trees and shrubs in June 2017, and utility work began that August. By October 2017, wet weather and contractor issues had delayed planned completion by six months to mid-2020. An additional five-month delay due to unexpected abandoned utilities was announced in April 2018. Items uncovered during utility work covered a broad range of history, from
Ohlone The Ohlone, formerly known as Costanoans (from Spanish meaning 'coast dweller'), are a Native American people of the Northern California coast. When Spanish explorers and missionaries arrived in the late 18th century, the Ohlone inhabited the ...
artefacts to abandoned fiber optic cables originally placed during the dot-com boom. Construction was 21% complete by mid-2018. By early 2019, the project was 27% complete; continued utility and contractor conflicts delayed expected completion to late 2021. The first half of utility reconstruction was completed in June 2019, with the second half finished in mid-2020. Construction of the second phase began in September 2020. Excavation for the second phase uncovered tracks originally used for the California Street Cable Railroad, as well as original Belgian block stones from the early 20th century. Further delays in 2020 pushed the estimated completion to 2022. The first red concrete was poured for the BRT lanes on November 10, 2020, and hundreds of trees were planted along Van Ness at approximately the same time. Species planted include
lemon-scented gum ''Corymbia citriodora'', commonly known as lemon-scented gum and other common names, is a species of tall tree that is endemic to north-eastern Australia. It has smooth white to pink bark, narrow lance-shaped to curved adult leaves, flower bud ...
along the median and London plane, Brisbane box, and palm trees along the sidewalk. The red concrete pour was completed in July 2021, and work continued on landscaping and median construction. Testing with Muni and Golden Gate Transit vehicles began on January 12, 2022, followed by driver training. Revenue service began on April 1, 2022. By the end of the month, northbound travel times had decreased by nine minutes – 35% – while ridership on route 49 had increased by 13%. Further decreases in travel time were expected as
transit signal priority Bus priority or transit signal priority (TSP) is a name for various techniques to improve service and reduce delay for mass transit vehicles at intersections (or junctions) controlled by traffic signals. TSP techniques are most commonly associat ...
was activated and adjusted. Route 49 remained temporarily operated solely by motorbuses – as had been the case during BRT construction, since 2016 – pending operations changes enabling its runs to be moved back to Potrero Division. Two trolleybus-operated supplementary runs (not shown in public schedules) operating in the weekday midday period only began operation on July 25, but regular, all-day, seven-days-a-week use of trolleybuses on route 49 did not resume until January 2023 – and temporarily covering only one-quarter of the route's runs.


See also

* Trolleybuses in San Francisco


References


External links


SFMTA project websiteSFCTA project website
**Final Environmental Impact Statement
Volume IVolume IIAddendum (2016)
{{USBRT Bus rapid transit in California Public transportation in San Francisco San Francisco Municipal Railway Golden Gate Bridge, Highway and Transportation District 2022 establishments in California Transport infrastructure completed in 2022