The Big Move
   HOME

TheInfoList



OR:

The Big Move is the regional transportation plan (RTP) published by
Metrolinx Metrolinx is a Crown agency of the Government of Ontario that manages and integrates road and public transport in the Greater Toronto and Hamilton Area (GTHA), which comprises much of Ontario's Golden Horseshoe region. Headquartered at Union ...
for the
Greater Toronto and Hamilton Area The Greater Toronto and Hamilton Area (GTHA) is a contiguous urban region that is composed of some of the largest cities and metropolitan areas by population in the Canadian province of Ontario. The GTHA consists of the Greater Toronto Area (GTA) ...
(GTHA) in Ontario, Canada. It makes specific recommendations for transit projects, resulting from seven "
green paper In the United Kingdom, the Commonwealth countries, Hong Kong, the United States and the European Union, a green paper is a tentative government report and consultation document of policy proposals for debate and discussion. A green paper represen ...
s" and two "
white paper A white paper is a report or guide that informs readers concisely about a complex issue and presents the issuing body's philosophy on the matter. It is meant to help readers understand an issue, solve a problem, or make a decision. A white paper ...
s" released for public discussion. A draft RTP was released alongside draft investment strategy in September 2008. After a series of stakeholder consultations and public meetings, the final RTP was approved and published by Metrolinx on 28 November 2008. Since its publication, it has been Metrolinx's mandate to implement the RTP, which includes new and improved
GO Transit GO Transit is a regional public transit system serving the Greater Golden Horseshoe region of Ontario, Canada. With its hub at Union Station in Toronto, GO Transit's green-and-white trains and buses serve a population of more than seven mil ...
service, local rapid transit, stations, and fare payment systems.


History

There was widespread consensus by community and business leaders in the GTHA that incremental change of the region's transportation system was insufficient, and that it needed a dramatic transformation to meet the needs of the 21st century. The regional transportation system needed to be effective, integrated, multi-modal, and funded in a sustainable way. In response to these concerns, the Government of Ontario created the Greater Toronto Transportation Authority in 2006, which became known as Metrolinx in December 2007.Metrolinx, p. vi–vii Metrolinx was given the mandate to develop and implement an integrated multi-modal transportation plan for the GTHA, and "The Big Move" plan was one of Metrolinx's first deliverables. It builds on the $11.5 billion MoveOntario 2020 commitment from the
Government of Ontario The government of Ontario (french: Gouvernement de l'Ontario) is the body responsible for the administration of the Canadian province of Ontario. A constitutional monarchy, the Crown—represented in the province by the lieutenant governorâ ...
announced on 15 June 2007, and includes new projects to support that initiative.Metrolinx, p. i–iiMetrolinx, Schedules 1 & 2 An initial stage of the RTP process was to release a series of "
green paper In the United Kingdom, the Commonwealth countries, Hong Kong, the United States and the European Union, a green paper is a tentative government report and consultation document of policy proposals for debate and discussion. A green paper represen ...
s", documents covering key issues for the RTP. These green papers were developed and consulted upon in late 2007 and early 2008, with the purpose of presenting information on transportation trends, challenges and opportunities for the GTHA: * Paper 1: Towards
Sustainable transport Sustainable transport refers to ways of transportation that are sustainable in terms of their social and environmental impacts. Components for evaluating sustainability include the particular vehicles used for road, water or air transport; th ...
ation * Paper 2: Mobility Hubs * Paper 3: Active Transportation * Paper 4: Transportation Demand Management * Paper 5: Moving Goods and Services * Paper 6: Roads and Highways * Paper 7: Transit The next stage was the release of two
white paper A white paper is a report or guide that informs readers concisely about a complex issue and presents the issuing body's philosophy on the matter. It is meant to help readers understand an issue, solve a problem, or make a decision. A white paper ...
s in May 2008. ''Paper 1 – Visions, Goals, and Objectives'', presented the basis for the final RTP, with specific goals and objectives that could be used for its development and evaluation. A broader proposed vision for the entire system was also presented. ''Paper 2 – Preliminary Directions and Concepts'', looked at various policies, programs and tools that could be used in the RTP. There were also various transportation system concepts that were modelled and evaluated based on resulting transit ridership, urban congestion, and the emission of
greenhouse gas A greenhouse gas (GHG or GhG) is a gas that absorbs and emits radiant energy within the thermal infrared range, causing the greenhouse effect. The primary greenhouse gases in Earth's atmosphere are water vapor (), carbon dioxide (), methane ...
and other
air pollutants Air pollution is the contamination of air due to the presence of substances in the atmosphere that are harmful to the health of humans and other living beings, or cause damage to the climate or to materials. There are many different types ...
. A draft version of the Regional Transportation Plan was provided to Metrolinx on 26 September 2008. A final version was approved on 28 November 2008.


Purpose

The GTHA is Canada's largest and fastest growing urban region, with a population forecast to grow by 2.6 million people by 2031. The region is becoming increasingly dependent and designed for automobiles, and
traffic congestion Traffic congestion is a condition in transport that is characterized by slower speeds, longer trip times, and increased vehicular queueing. Traffic congestion on urban road networks has increased substantially since the 1950s. When traffic de ...
is already costing commuters and the economy billions of dollars every year. Nine individual local transit agencies and one regional transit agency exist, and are poorly integrated when one out of four trips crosses a regional boundary, making transit unattractive.Metrolinx, p. 6 Investment in transit has been relatively stagnant, causing roads, highways and transit vehicles to be crowded and pushed to the limit. In the face of
climate change In common usage, climate change describes global warming—the ongoing increase in global average temperature—and its effects on Earth's climate system. Climate change in a broader sense also includes previous long-term changes to ...
, increasing energy costs, increasing urbanization, and an aging population, the RTP exists to alleviate these problems.


Impact

The Big Move conducted modelling to forecast what the impact of its implementation would be in the year 2031. The proposed regional rapid transit and highway network was expected to achieve significant benefits, even with the additional population. These benefits included reduced commuting times, increased active transportation and reduced environmental impacts.Metrolinx, p. 58-59


Priority actions


Expanding rapid transit

The region's transportation infrastructure has been characterized as neglected from under-investment. The core of the RTP is building a seamlessly integrated regional
rapid transit Rapid transit or mass rapid transit (MRT), also known as heavy rail or metro, is a type of high-capacity public transport generally found in urban areas. A rapid transit system that primarily or traditionally runs below the surface may be ...
network consisting of 62 different rapid transit projects. These projects form two long-term templates with 15 and 25-year horizons. These templates outline broad projects; specific details about technology, alignment, stations and service levels for each project are subsequently determined though a
cost–benefit analysis Cost–benefit analysis (CBA), sometimes also called benefit–cost analysis, is a systematic approach to estimating the strengths and weaknesses of alternatives. It is used to determine options which provide the best approach to achieving benefits ...
, or an
environmental assessment Environmental Impact assessment (EIA) is the assessment of the environmental impact, environmental consequences of a plan, policy, program, or actual projects prior to the decision to move forward with the proposed action. In this context, the te ...
process.Metrolinx, p. 22Metrolinx, p. 96


Connectivity to Pearson Airport

Having high-order transit connectivity to
Toronto Pearson International Airport Lester B. Pearson International Airport , commonly known as Toronto Pearson International Airport, is an international airport located in Mississauga, Ontario, Canada. It is the main airport serving Toronto, its metropolitan area, and the surr ...
is the second priority action in the Big Move. The RTP identifies the following transit corridors, some of which are now in planning or construction: *
Eglinton Crosstown line Line 5 Eglinton (also known as the Eglinton Crosstown or the Crosstown) is a light rail line that is under construction in Toronto, Ontario, Canada. Owned by Metrolinx and operated by the Toronto Transit Commission (TTC), the line will be part o ...
* Finch West LRT *
Mississauga Transitway The Mississauga Transitway is a bus rapid transit (BRT) system in Mississauga, Ontario, Canada. It comprises a series of purpose-constructed bus-only roadways, as well as reserved lanes on existing city streets and portions of Highway 403, tha ...
* Queen Street, Brampton/ Highway 427 * Highway 427 from
Kipling Station Kipling is the western terminus station of Line 2 Bloor–Danforth of the Toronto subway system. The station is served by buses and subway trains operated by the Toronto Transit Commission and is adjacent to the Kipling GO Station on the Milton ...
With Pearson Airport and
Union Station A union station (also known as a union terminal, a joint station in Europe, and a joint-use station in Japan) is a railway station at which the tracks and facilities are shared by two or more separate railway companies, allowing passengers to ...
in downtown Toronto being seen as the two most important mobility hubs in the GTHA, the RTP specifically identified an
airport rail link An airport rail link is a service providing passenger rail transport from an airport to a nearby city by mainline or commuter trains, rapid transit, people mover, or light rail. Direct links operate straight to the airport terminal, while ...
as being necessary between them. Discussions and studies regarding a transit link to the airport had been ongoing since the 1980s.
Transport Canada Transport Canada (french: Transports Canada) is the department within the Government of Canada responsible for developing regulations, policies and services of road, rail, marine and air transportation in Canada. It is part of the Transporta ...
began formal calls for proposals in 2001, and a contract was awarded in 2003. The public-private partnership was called off in 2010 after failed negotiations, and Metrolinx was handed responsibility for the project. The
Union Pearson Express The Union Pearson Express (UP Express or UPX) is an airport rail link connecting Union Station in Downtown Toronto to Toronto Pearson International Airport. The UP Express began operation on 6 June 2015, in time for the 2015 Pan American Games. ...
was completed and began operations on 6 June 2015, offering a 25-minute journey that departs every 15 minutes.


Expanding Union Station

Union Station is Canada's busiest passenger facility and "the heart of the GTHA's transportation system", handling 240,000 people daily, or 65 million annually.Metrolinx, p. 25 However, it was forecast in 2011 that passenger traffic was expected to quadruple in the following 25 years as a result of improvements that are called for in the Big Move plan, and Union Station would be at or over capacity without dramatic modifications. Furthermore, being a National Historic Site that was built and opened in 1927, the station had been showing its age: peeling paint, cracked and damaged floors, leaky roofs, and crowded and inefficient passenger concourse spaces that were designed in the 1970s. The current work being undertaken includes excavation work to dramatically expand the existing GO and
Via Rail Via Rail Canada Inc. (), operating as Via Rail or Via, is a Canadian Crown corporation that is mandated to operate intercity passenger rail service in Canada. It receives an annual subsidy from Transport Canada to offset the cost of operating ...
concourses and create a floor dedicated to retail space, establishing new connections to the PATH network, increasing the number of entrances, implementing energy efficiency measures and restoring heritage elements. Future work could include a new train tunnel for the GO Transit Lakeshore lines, with a new station being built slightly east of Union.


Integrated transit fares

There are 10 public transit agencies in the GTHA with individual fare systems. This forced some commuters to have multiple fare payment types. The Ontario Ministry of Transportation began trials for Presto, a regional fare card, in 2007. Presto was later made an operating division of Metrolinx. Presto is available on GO Transit, the Union Pearson Express, and seven municipal transit agencies in the GTHA (Brampton, Burlington, Durham Region, Hamilton, Mississauga, Oakville and York Region). Some TTC routes and subway stations are also Presto-enabled, with the goal of making it available across the entire TTC system by the end of 2016. Fares are often cheaper than standard cash fare, and most municipal transit agencies will reduce their fare to between $0.50 and $0.75 for transferring to GO Transit. There are 10 unique fare structures across the GTHA. Metrolinx is also working towards establishing one single fare policy across the region, with the objectives to create one fare structure that is simple and easy to understand, and reflective of the distance travelled and the quality of service. Metrolinx is evaluating fare structures that include a flat fare, or differentiations by mode distance or zones.


Mobility hubs

A transportation mobility hub is a major transit station and the immediate surrounding area, where different forms of transportation come together, serving as the origin, destination or transfer point for a significant amount of trips. The Big Move calls for "a system of connected mobility hubs” that allow seamless access to and transfers within the regional transit system. The mobility hubs also support higher density development. Metrolinx has profiled 51 mobility hubs in the GTHA, collecting data within an 800-metre radius of each of them. In some hubs, Metrolinx undertakes detailed studies. For some hubs, these studies provide a broad plan for how the mobility hub should look and work over the long term, by informing more detailed planning, supporting future growth, and ensuring land use and transportation plans are well integrated. In other hubs, these studies address specific station issues in the short and medium term.


Investment strategy

The Big Move was to be accompanied by an investment strategy, to ensure that capital costs for the GTHA's regional transportation system were funded in a sustainable way. This would require the generation of $50 billion for all of the identified projects, which equated to $2 billion annually for 25 years. While the RTP outlined the preliminary requirements, an Investment Strategy would be crafted in more detail in separate cover. Metrolinx was given until June 2013 to draft such a strategy. On 27 May 2013, Metrolinx released its Investment Strategy, which would use the following tools to generate $2 billion annually for RTP projects: * A 1% increase in the Harmonized Sales Tax ($1.3 billion) * A 5¢ increase in the gas tax ($330 million) * An average charge of 25¢ on all off-street non-residential parking spaces ($350 million) * A 15% dedication of all development charges ($100 million) On 18 September 2013, the
Government of Ontario The government of Ontario (french: Gouvernement de l'Ontario) is the body responsible for the administration of the Canadian province of Ontario. A constitutional monarchy, the Crown—represented in the province by the lieutenant governorâ ...
under
Premier Premier is a title for the head of government in central governments, state governments and local governments of some countries. A second in command to a premier is designated as a deputy premier. A premier will normally be a head of governm ...
Kathleen Wynne announced a panel to review the Investment Strategy, to "listen to different concerns and views and to assess them." The panel recommended two variant options of Metrolinx's Investment Strategy recommendations, which relied less on a Harmonized Sales Tax increase, and more on a gas tax increase. In March 2014, Wynne rejected the proposal to raise taxes to fund the RTP outright, in the lead-up to the
2014 Ontario general election The 2014 Ontario general election was held on June 12, 2014, to elect the members of the 41st Parliament of Ontario. The Liberal Party won a majority of seats in the legislature, allowing its leader, Kathleen Wynne, to continue as premier, movi ...
. A formal Investment Strategy has not been implemented to date, and the Ontario government has opted to raise funds for transportation project through its green bond program and the partial sale of
Hydro One Hydro One Limited is an electricity transmission and distribution utility serving the Canadian province of Ontario. Hydro One traces its history to the early 20th century and the establishment of the Hydro-Electric Power Commission of Ontario ( ...
.$1.6B Hydro One stock issue rises in TSX debut
/ref>


Footnotes


References

* **


External links


The Big Move – Overview and Message from the Chair
*
The Big Move – PDF

Metrolinx – Official Site
{{DEFAULTSORT:Big Move, The Metrolinx Transportation planning Transport in Toronto Transport in the Greater Toronto Area