A soft story building is a multi-story building in which one or more floors have windows, wide doors, large unobstructed commercial spaces, or other openings in places where a
shear wall In structural engineering, a shear wall is a vertical element of a system that is designed to resist in-plane lateral forces, typically wind and seismic loads. In many jurisdictions, the International Building Code and International Residential Co ...
would normally be required for stability as a matter of
earthquake engineering Earthquake engineering is an interdisciplinary branch of engineering that designs and analyzes structures, such as buildings and bridges, with earthquakes in mind. Its overall goal is to make such structures more resistant to earthquakes. An earth ...
design. A typical soft story building is an
apartment building An apartment (American English), or flat (British English, Indian English, South African English), is a self-contained housing unit (a type of residential real estate) that occupies part of a building, generally on a single story. There are ma ...
of three or more stories located over a ground level with large openings, such as a
parking garage A multistorey car park ( British and Singapore English) or parking garage (American English), also called a multistory, parking building, parking structure, parkade (mainly Canadian), parking ramp, parking deck or indoor parking, is a bui ...
or series of retail businesses with large windows. Buildings are classified as having a soft story if that level is less than 70% as stiff as the floor immediately above it, or less than 80% as stiff as the average stiffness of the three floors above it. Soft story buildings are vulnerable to collapse in a moderate to severe
earthquake An earthquake (also known as a quake, tremor or temblor) is the shaking of the surface of the Earth resulting from a sudden release of energy in the Earth's lithosphere that creates seismic waves. Earthquakes can range in intensity, fr ...
in a phenomenon known as soft story collapse. The inadequately-braced level is relatively less resistant than surrounding floors to lateral earthquake motion, so a disproportionate amount of the building's overall side-to-side drift is focused on that floor. Subject to disproportionate lateral stress, and less able to withstand the stress, the floor becomes a weak point that may suffer structural damage or complete failure, which in turn results in the collapse of the entire building. Soft-story failure was responsible for nearly half of all homes that became uninhabitable in California's
Loma Prieta earthquake The 1989 Loma Prieta earthquake occurred on California's Central Coast on October 17 at local time. The shock was centered in The Forest of Nisene Marks State Park in Santa Cruz County, approximately northeast of Santa Cruz on a section of t ...
of 1989, and was projected to cause severe damage and possible destruction of 160,000 homes in the event of a more significant earthquake in the
San Francisco Bay Area The San Francisco Bay Area, often referred to as simply the Bay Area, is a populous region surrounding the San Francisco, San Pablo, and Suisun Bay estuaries in Northern California. The Bay Area is defined by the Association of Bay Area G ...
. As of 2009, few such buildings in the area had undergone the relatively inexpensive
seismic retrofit Seismic retrofitting is the modification of existing structures to make them more resistant to seismic activity, ground motion, or soil failure due to earthquakes. With better understanding of seismic demand on structures and with our recent exp ...
to correct the condition. In 2013, San Francisco mandated screening of soft-story buildings to determine if retrofitting is necessary, and required that retrofitting be completed by 2017 through 2020. In Los Angeles in 2016, following San Francisco's ordinance, the city adopted a similar ordinance targeting soft-story apartment buildings first. This ordinance is to reduce structural damage in the event of an earthquake by reinforcing soft-story areas with steel structures. A soft-story building is described as existing wood-frame buildings with soft, weak, or open-front walls and existing non-ductile concrete buildings in the ordinance. Most of these buildings were built before 1978, before
building code A building code (also building control or building regulations) is a set of rules that specify the standards for constructed objects such as buildings and non-building structures. Buildings must conform to the code to obtain planning permissi ...
s were changed. Los Angeles property owners are being targeted by the size of their buildings. The first group of ordinances went out May 2, 2016, with sixteen or more units and more than three stories. The second is July 22, 2016, with sixteen or more units and two stories. The third is October 17, 2016, with sixteen or fewer units and more than three stories. The fourth is January 30, 2017, for nine to fifteen units. The fifth is May 29, 2017 for seven to eight units. The sixth is August 14, 2017, for four to six units. Then on October 30, 2017
condominium A condominium (or condo for short) is an ownership structure whereby a building is divided into several units that are each separately owned, surrounded by common areas that are jointly owned. The term can be applied to the building or complex ...
s and commercial buildings will receive their orders to comply. The order to comply is legally and logistically significant because it starts a "ticking clock". In Los Angeles, property owners have two years from the date of the order to bring forth approved plans. After that milestone, they have 3.5 years (counting from when the order was received) to obtain the construction permit. Total completion, as confirmed by receiving a certificate of compliance, must be attained within seven years of the date of issue of the original order. In Los Angeles, property owners also have the option to demolish their noncompliant buildings. Demolition plans must be submitted within two years, and a demolition permit must be issued within 3.5 years (from the date of the original compliance order), and the actual demolition must be completed within seven years of the original compliance order. Failure to meet the deadlines can result in the municipality stepping in, evicting any lingering tenants, and then demolishing the building, whereupon the cost of demolition is charged back to the property owner. If the property owner refuses to pay the bill, then the City can seize the entire property and sell it in order to pay for the demolition (including all associated clean-up tasks), as well as any back-taxes that may be owing. However, because land values are often high, it is rare for property owners to neglect orders from the municipality.


References

{{reflist Earthquake and seismic risk mitigation Construction Earthquake engineering