STS-127
   HOME

TheInfoList



OR:

STS-127 ( ISS assembly flight 2J/A) was a
NASA The National Aeronautics and Space Administration (NASA ) is an independent agency of the US federal government responsible for the civil space program, aeronautics research, and space research. NASA was established in 1958, succeedin ...
Space Shuttle The Space Shuttle is a retired, partially reusable low Earth orbital spacecraft system operated from 1981 to 2011 by the U.S. National Aeronautics and Space Administration (NASA) as part of the Space Shuttle program. Its official program n ...
mission to the
International Space Station The International Space Station (ISS) is the largest Modular design, modular space station currently in low Earth orbit. It is a multinational collaborative project involving five participating space agencies: NASA (United States), Roscosmos ( ...
(ISS). It was the twenty-third flight of . The primary purpose of the STS-127 mission was to deliver and install the final two components of the
Japanese Experiment Module Japanese may refer to: * Something from or related to Japan, an island country in East Asia * Japanese language, spoken mainly in Japan * Japanese people, the ethnic group that identifies with Japan through ancestry or culture ** Japanese diaspor ...
: the Exposed Facility (JEM EF), and the Exposed Section of the Experiment Logistics Module (ELM-ES). When ''Endeavour'' docked with the ISS on this mission in July 2009, it set a record for the most humans in space at the same time in the same vehicle, the first time thirteen people have been at the station at the same time. Together they represented all ISS program partners and tied the general record of thirteen people in space with the first such occurrence of 1995. The first launch attempt, on June 13, 2009, was scrubbed due to a gaseous hydrogen leak observed during tanking. The Ground Umbilical Carrier Plate (GUCP) on the external fuel tank experienced a potentially hazardous hydrogen gas leak similar to the fault that delayed the mission
STS-119 STS-119 ( ISS assembly flight 15A) was a Space Shuttle mission to the International Space Station (ISS) which was flown by space shuttle Discovery during March 2009. It delivered and assembled the fourth starboard Integrated Truss Segment (S ...
in March 2009. Since a launch date of June 18, 2009, would have conflicted with the launch of the
Lunar Reconnaissance Orbiter The Lunar Reconnaissance Orbiter (LRO) is a NASA robotic spacecraft currently orbiting the Moon in an eccentric polar mapping orbit. Data collected by LRO have been described as essential for planning NASA's future human and robotic missions t ...
(LRO)/Lunar Crater Observation and Sensing Satellite (LCROSS), NASA managers discussed the scheduling conflict with both the Lunar Reconnaissance Orbiter project and the Air Force Eastern Range, which provides tracking support for rockets launched from Florida. A decision was made to allow the shuttle to attempt a second launch on June 17, 2009, allowing LRO to launch on June 18, 2009. The second launch attempt on June 17, 2009, was also scrubbed due to hydrogen leak issues seen from the Ground Umbilical Carrier Plate. Due to conflicts with the launch of the LRO, and due to a
beta angle In orbital spaceflight, the beta angle (\boldsymbol) is the angle between a satellite's orbital plane around Earth and the geocentric position of the sun. The beta angle determines the percentage of time that a satellite in low Earth orbit ( ...
constraint, the next available launch opportunity was scheduled for July 11, 2009. A successful tanking test for leak checks was performed on July 1, 2009, with modified GUCP seals allowing launch preparations to proceed as scheduled. Because of lightning strikes near the launch pad during the evening of July 10, 2009, NASA scrubbed the launch for the third time and rescheduled for July 12, 2009. Due to a
Return To Launch Site A launch vehicle or carrier rocket is a rocket designed to carry a payload (spacecraft or satellites) from the Earth's surface to outer space. Most launch vehicles operate from a launch pads, supported by a launch control center and syste ...
(RTLS) weather violation, NASA scrubbed the launch for the fourth time on the evening of July 12, 2009. STS-127's fifth launch attempt, on July 13, 2009, was also scrubbed due to anvil clouds and
lightning Lightning is a naturally occurring electrostatic discharge during which two electrically charged regions, both in the atmosphere or with one on the ground, temporarily neutralize themselves, causing the instantaneous release of an average ...
within of the launch site, which violated launch safety rules. STS-127 finally launched successfully on its sixth launch attempt, on July 15, 2009, at 18:03 EDT. Pieces of foam were observed falling off of the External Tank during the ascent, the same occurrence that had led to the loss of ''Columbia'' in 2003. However, ''Endeavour'' received only minor scuffs to its heat shield, the damage not enough to cause concern over reentry. The shuttle landed at
Kennedy Space Center The John F. Kennedy Space Center (KSC, originally known as the NASA Launch Operations Center), located on Merritt Island, Florida, is one of the National Aeronautics and Space Administration's (NASA) ten field centers. Since December 196 ...
16 days later at 10:48 EDT on July 31, 2009.


Crew


Mission payload

''Endeavour'' carried a wide variety of equipment and cargo in the payload bay, with the largest item being the ''Kibō'' Japanese Experiment Module Exposed Facility (JEM EF), and the ''Kibō'' Japanese Experiment Logistics Module – Exposed Section (ELM-ES). The exposed facility is a part of ''Kibō'' that will allow astronauts to perform science experiments that are exposed to the vacuum of space. The exposed section is similar to the logistics module on the ''Kibō'' laboratory, but is not pressurized. Once its payloads were transferred to the JEM EF, the ELM-ES was returned to the payload bay. Also inside the payload bay was an Integrated Cargo Carrier-Vertical Light Deployable (ICC-VLD), containing a variety of equipment and spare components for the station. The carrier contained six new batteries for installation on the P6 truss, that was installed during two of the mission's spacewalks, as well as a spare space-to-ground antenna and a spare linear drive unit and pump module which was stored on an external stowage platform on the station's truss during one of the spacewalks. Two satellites were also carried by the orbiter, for deployment when the mission ended. The Dual Autonomous Global Positioning System On-Orbit Navigator Satellite, called DRAGONSAT, gathers data on autonomous spacecraft rendezvous and docking capabilities, and consists of two picosatellites, the AggieSat2, and PARADIGM (BEVO-1), which acquire GPS data from a device at NASA and send it to ground stations at
Texas A&M University Texas A&M University (Texas A&M, A&M, or TAMU) is a public university, public, Land-grant university, land-grant, research university in College Station, Texas. It was founded in 1876 and became the flagship institution of the Texas A&M Unive ...
and the
University of Texas at Austin The University of Texas at Austin (UT Austin, UT, or Texas) is a public research university in Austin, Texas. It was founded in 1883 and is the oldest institution in the University of Texas System. With 40,916 undergraduate students, 11,075 ...
. After release, the two picosatellites remained attached for two orbits to collect GPS data, and separated during the third orbit. A second satellite, the Atmospheric Neutral Density Experiment (ANDE-2), is part of a
United States Department of Defense The United States Department of Defense (DoD, USDOD or DOD) is an executive branch department of the federal government charged with coordinating and supervising all agencies and functions of the government directly related to national sec ...
project flown by the
Naval Research Laboratory The United States Naval Research Laboratory (NRL) is the corporate research laboratory for the United States Navy and the United States Marine Corps. It was founded in 1923 and conducts basic scientific research, applied research, technologic ...
to provide high-quality satellites, and will measure the density and composition of the
low Earth orbit A low Earth orbit (LEO) is an orbit around Earth with a period of 128 minutes or less (making at least 11.25 orbits per day) and an eccentricity less than 0.25. Most of the artificial objects in outer space are in LEO, with an altitude never m ...
atmosphere An atmosphere () is a layer of gas or layers of gases that envelop a planet, and is held in place by the gravity of the planetary body. A planet retains an atmosphere when the gravity is great and the temperature of the atmosphere is low. A ...
while being tracked from the ground, to better predict the movement and decay of objects in orbit. ANDE-2 consists of two spherical
microsatellites A microsatellite is a tract of repetitive DNA in which certain DNA motifs (ranging in length from one to six or more base pairs) are repeated, typically 5–50 times. Microsatellites occur at thousands of locations within an organism's genome. ...
, ANDE Active spacecraft (Castor) and the ANDE Passive spacecraft (Pollux), and will be tracked by the International Laser Ranging Service (ILRS) network as well as the
Space Surveillance Network The United States Space Surveillance Network (SSN) detects, tracks, catalogs and identifies artificial objects orbiting Earth, e.g. active/inactive satellites, spent rocket bodies, or fragmentation debris. The system is the responsibility of Uni ...
(SSN). One of the satellites, Pollux, is running
Arduino Arduino () is an open-source hardware and software company, project, and user community that designs and manufactures single-board microcontrollers and microcontroller kits for building digital devices. Its hardware products are licensed under ...
libraries, with its payload programmed and built by students. A set of experiments to be deployed on the ISS were carried by STS-127, including Dosimetry for Biological Experiments in Space (ESA), Validation of Procedures for Monitoring Crew Member Immune Function, the student-made Image Reversal in Space (
CSA CSA may refer to: Arts and media * Canadian Screen Awards, annual awards given by the Academy of Canadian Cinema & Television * Commission on Superhuman Activities, a fictional American government agency in Marvel Comics * Crime Syndicate of Amer ...
/ ISU), Nutritional Status Assessment (NASA), NASA Biological Specimen Repository and Tomatosphere-II (CSA). The STS-127 Official Flight Kit (OFK) included water samples from each of the five
Great Lakes The Great Lakes, also called the Great Lakes of North America, are a series of large interconnected freshwater lakes in the mid-east region of North America that connect to the Atlantic Ocean via the Saint Lawrence River. There are five lakes ...
, a resin statue of a water droplet for the
One Drop Foundation One Drop is an international non-profit organization based in Montreal, created in 2007 by Cirque du Soleil founder Guy Laliberté, which is focused on water initiatives. Arts and culture One Drop uses circus arts, folklore, popular theatre, mus ...
, and a copy of
Beethoven Ludwig van Beethoven (baptised 17 December 177026 March 1827) was a German composer and pianist. Beethoven remains one of the most admired composers in the history of Western music; his works rank amongst the most performed of the classic ...
's Fifth Symphony for the
Montreal Symphony Orchestra The Montreal Symphony Orchestra (french: Orchestre symphonique de Montréal, or OSM) is a Canadian symphony orchestra based in Montreal, Quebec, Canada. The orchestra’s home is the Montreal Symphony House at Place des Arts. It is the only orche ...
, among other mementos. The docking module was also mounted with the DragonEye 3D Flash LIDAR ranging system manufactured by Advanced Scientific Concepts, Inc. The module was launched to test the docking system which will be used by the commercial
SpaceX Dragon American private space transportation company SpaceX has developed and produced several spacecraft named Dragon. The first family member, now referred to as Dragon 1, flew 23 cargo missions to the ISS between 2010 and 2020 before being retired. ...
re-usable cargo carrier to send supplies to the ISS during the post-shuttle era. The Dragon spacecraft made its successful maiden flight in December 2010.


Mission milestones

The mission marked: * 158th NASA crewed space flight * 128th Space Shuttle mission * 127th shuttle mission since STS-1 * 23rd flight of Space Shuttle ''Endeavour'' * 29th shuttle mission to the ISS * 102nd post-''
Challenger Challenger, Challengers, or The Challengers may refer to: Entertainment Comics and manga * Challenger (character), comic book character * ''Challengers'' (manga), manga by Hinako Takanaga Film and TV * ''The Challengers'' (TV series), a 1979 ...
'' mission * 14th post-''
Columbia Columbia may refer to: * Columbia (personification), the historical female national personification of the United States, and a poetic name for America Places North America Natural features * Columbia Plateau, a geologic and geographic region i ...
'' mission * 1st time that two Canadians have been in space at the same moment


Shuttle processing

''Endeavour'' served as the
STS-400 STS-400 was the Space Shuttle contingency support (Launch On Need) flight that would have been launched using if a major problem occurred on during STS-125, the final Hubble Space Telescope servicing mission (HST SM-4). Due to the much lowe ...
rescue Rescue comprises responsive operations that usually involve the saving of life, or the urgent treatment of injuries after an accident or a dangerous situation. Tools used might include search and rescue dogs, mounted search and rescue ...
vehicle for
STS-125 STS-125, or HST-SM4 (Hubble Space Telescope Servicing Mission 4), was the fifth and final Space Shuttle mission to the Hubble Space Telescope (HST) and the last solo flight of the Space Shuttle ''Atlantis''. The launch of the Space Shuttle ''Atl ...
, and was prepared for a possible liftoff from Launch Pad 39B on May 15, 2009, four days after the launch of STS-125. After ''Atlantis'' performed the late inspection and was cleared for re-entry, ''Endeavour'' was officially released from stand-by status on May 21, 2009, and preparations for STS-127 were initiated. ''Endeavour'' moved from Launch Pad 39B to 39A on May 31, 2009, in preparation for STS-127. The crew of STS-127 arrived at
Kennedy Space Center The John F. Kennedy Space Center (KSC, originally known as the NASA Launch Operations Center), located on Merritt Island, Florida, is one of the National Aeronautics and Space Administration's (NASA) ten field centers. Since December 196 ...
on June 2, 2009, for the Terminal Countdown Demonstration Test (TCDT) that concluded with a full launch dress rehearsal. The Flight Readiness Review (FRR), a meeting during which NASA managers assess mission preparations and officially set the launch date, concluded on June 3, 2009. For the first time, live status updates about the FRR were published periodically during the meeting via NASA's Twitter stream.


Launch attempts

The launch countdown began June 10, 2009, but on June 13, 2009, as tanking was underway, a gaseous hydrogen leak on a vent line near the Ground Umbilical Carrier Plate was observed, and the June 13, 2009, launch was scrubbed at 00:26 EDT. As liquid hydrogen fuel is pumped in, some of it boils off as the extremely cold liquid enters the warm external tank. The vent line valve controls the resulting buildup of gas pressure by allowing excess gas to escape into a ground-side vent line, which leads to a flare stack at a safe distance away from the pad. A similar leak situation was seen during the first launch attempt of
STS-119 STS-119 ( ISS assembly flight 15A) was a Space Shuttle mission to the International Space Station (ISS) which was flown by space shuttle Discovery during March 2009. It delivered and assembled the fourth starboard Integrated Truss Segment (S ...
. NASA managers met on June 14, 2009, and June 15, 2009, and evaluated the leak, discussed steps that had to be taken, and set a new launch date of June 17, 2009, at 05:40 EDT. A second launch attempt was made on June 17, 2009, for which NASA moved the planned launch of the
Lunar Reconnaissance Orbiter The Lunar Reconnaissance Orbiter (LRO) is a NASA robotic spacecraft currently orbiting the Moon in an eccentric polar mapping orbit. Data collected by LRO have been described as essential for planning NASA's future human and robotic missions t ...
to a new date. On June 17, 2009, loading of the shuttle's external tank with liquid hydrogen and liquid oxygen was delayed three hours due to poor weather around the launch site, but tanking began once the weather cleared. Approximately two hours after tanking began, engineers saw leak indications in the GUCP similar to those seen during the first launch attempt. The launch was officially scrubbed at 01:55 EDT. Following the launch scrub, Chairman of NASA's Mission Management Team LeRoy Cain noted that engineers would work to understand the hydrogen leak issue and come up with a solution to the problem. Cain said managers were hopeful that the issue could be resolved in time for the next available launch opportunity on July 11, 2009. Due to the delay of STS-127, managers noted that it was likely that the launch of
STS-128 STS-128 (ISS assembly flight 17A) was a NASA Space Shuttle mission to the International Space Station (ISS) that launched on August 28, 2009. carried the Multi-Purpose Logistics Module ''Leonardo'' as its primary payload. ''Leonardo'' contain ...
on August 7, 2009, would be pushed back slightly. On July 1, 2009, the shuttle managers conducted a new series of tanking tests to confirm a hypothesis that a misaligned vent port housing was the root cause of the leaks. The existing rigid seal was replaced with a flexible one in the hope that it would maintain a tight fix even under the cryogenic conditions that seem to cause the leak. The test was declared a success with no leaks detected on the GUCP. The mission was announced to be targeting an July 11, 2009, launch. On the evening of July 10, 2009, the launch pad region was hit by eleven strikes of lightning, which pushed back the July 11, 2009, launch time by at least 24 hours. Two of the strikes were strong enough to trigger an evaluation by NASA engineers. The inspections revealed that no damage had been done to the Space Shuttle. NASA scrubbed ''Endeavour''' July 12, 2009, launch attempt at
T-minus A countdown is a sequence of backward counting to indicate the time remaining before an event is scheduled to occur. NASA commonly employs the terms "L-minus" and "T-minus" during the preparation for and anticipation of a rocket launch, and eve ...
9 minutes and holding due to Cumulus clouds and lightning near the launch pad. During the final Go/No-Go polls, Mission Control in Houston declared a "No-Go" due to unacceptable weather forecast for a possible Return-To-Launch-Site (RTLS) abort, and planned for emergency scenarios when one or more engines shut down early leaving insufficient energy to reach the Transatlantic Abort Landing (TAL) sites. Similarly, during the July 13, 2009, attempt, RTLS weather was also "no go." Meanwhile, shuttle weather officer Kathy Winters informed the launch director, Pete Nickolenko, that the launch pad weather had changed to RED as the Phase-1 Lightning warning was issued for the
Kennedy Space Center The John F. Kennedy Space Center (KSC, originally known as the NASA Launch Operations Center), located on Merritt Island, Florida, is one of the National Aeronautics and Space Administration's (NASA) ten field centers. Since December 196 ...
. The launch was scrubbed at
T-minus A countdown is a sequence of backward counting to indicate the time remaining before an event is scheduled to occur. NASA commonly employs the terms "L-minus" and "T-minus" during the preparation for and anticipation of a rocket launch, and eve ...
9 minutes and holding and was quickly reset for July 15, 2009 (a 48 hours scrub turn around) due to weather concerns on July 14, 2009, and the desire to replace the Tyvek covers over the forward Reaction Control System thrusters.


Mission timeline


July 15 (Flight Day 1, Launch)

On July 15, 2009, at 18:03:10 EDT, the launch was finally successful. Upon reviewing the launch video footage, imagery analysts noted eight or nine instances of foam shedding from the External Tank. The pictures of the external tank taken when jettisoning showed loss of foam in the intertank ribbing. The chairman of the Mission Management Team was not concerned and felt that the Space Shuttle would be cleared for re-entry on its return voyage—which it was a few days later. The payload doors were opened after reaching orbit followed by deployment of the Ku band antenna and activation of the shuttle's mechanical arm. File:STS-127 Launch 05.jpg, Liftoff of Space Shuttle ''Endeavour'' from Launch Pad 39A File:STS-127 liftoff enhanced picture.jpg, Wide angle view of ''Endeavour'' lifting off the pad


July 16 (Flight Day 2)

The thermal protection system was inspected with the Shuttle Robotic Arm/Orbiter Boom Sensor System ( OBSS) and the voluminous data downlinked for analysis. The orbital maneuvering system pods were inspected for tile damage or protruding tiles. The extravehicular mobility units were checked in addition to the rendezvous system tests and centerline camera installation. In preparation for the docking, the docking ring was extended.


July 17 (Flight Day 3, ISS Docking)

The shuttle successfully docked with the station above the Earth, following rendezvous pitch maneuver (RPM) photography of ''Endeavour''s thermal protection system by the Expedition 20 Crew. During this procedure, the shuttle flips over on its back to the station so that the station crew can capture high resolution imagery of the underside of the shuttle. The docking happened on the ISS's PMA-2 (Pressurized Mating Adapter) on the ''Harmony'' module and the hatch was opened after leak checks. As part of the crew swap, station crew member Koichi Wakata was replaced with Tim Kopra. The two astronauts specially fitted seatliners were interchanged. As part of preparation for EVA 1, astronauts Wolf and Kopra camped out in the Quest airlock. A quick review of the RPM imagery showed no serious concerns beyond two instances of coating loss. Further analysis of the imagery will be done. A boost of the station was completed with the shuttle's vernier thrusters to avoid a piece of space debris. The SRBs were retrieved and their camera imagery is expected to give more detail on the ET foam shedding. File:Endeavour from ISS before docking.jpg, ''Endeavour'' from ISS before docking File:ISS from Endeavour before docking.jpg, One of ''Endeavour''s aft flight deck windows frames the nearby International Space Station. File:Range finding from shuttle to ISS.jpg, Astronaut Christopher Cassidy uses a rangefinder to determine the distance to ISS before docking File:RPM_image_of_Endeavour.jpg, RPM image of ''Endeavour'' as taken from ISS


July 18 (Flight Day 4, EVA 1)

EVA 1 started with astronauts Dave Wolf and Tim Kopra switching their spacesuit power to internal battery at 16:19 UTC. Despite a communication problem with the spacewalkers, the Japanese Exposed Facility was successfully installed on the Japanese Experiment Module by means of a complex series of steps involving the robotic arms of both the station and the shuttle. The JEF was first unberthed from the shuttle payload bay by the station arm, after which the shuttle arm took the load. The station arm was then moved to the worksite on Node-2 (Harmony), wherefrom it took the 4.1 ton facility back. The facility was then successfully latched on to the Experiment Module. As part of the EVA, the spacewalkers successfully deployed the port Unpressurized Cargo Carrier Attach System (UCCAS), which could not be deployed during
STS-119 STS-119 ( ISS assembly flight 15A) was a Space Shuttle mission to the International Space Station (ISS) which was flown by space shuttle Discovery during March 2009. It delivered and assembled the fourth starboard Integrated Truss Segment (S ...
. During the prior mission, the deployment failed due to a jamming caused by a stuck detent pin. Engineers designed a custom tool to force the pin to release, which was used to deploy the mechanism. Meanwhile, the shuttle managers announced that there would be no need for a focused inspection of the heat shield. The nose cap and wing leading-edge panels of the shuttle were cleared for entry as they were, but a reentry clearance was not given. Beyond one impact site having a gouge, the rest of the impacts were found to be mostly a loss of coating. The other activity scheduled for EVA 1, the deployment of a starboard side cargo carrier, was postponed for want of time. A fuel cell issue found before launch was analyzed, though the cell continued to function as expected with no impact to the mission. File:STS-127 EVA1 Kopra04.jpg, Tim Kopra working to prepare the
berthing A cabin or berthing is an enclosed space generally on a ship or an aircraft. A cabin which protrudes above the level of a ship's deck may be referred to as a deckhouse. Sailing ships In sailing ships, the officers and paying passengers wou ...
mechanisms on the ''Kibō'' laboratory and the Japanese Exposed Facility (JEF) for the JEF installation on ''Kibō'', during space walk 1. File:STS-127 JEM-EF.jpg, JEF in the grasp of the shuttle's robotic arm.


July 19 (Flight Day 5)

The installation of the Integrated Cargo Carrier-Vertical Light Deployable (ICC-VLD) on the port side of the station was successfully completed with the use of both the shuttle and station robotic arms. The cargo pallet, containing spares and fresh batteries for the station, was lifted out of the shuttle bay by the shuttle arm and handed off to the station's Canadarm2, which maneuvered it to its position. The pallet's contents will be set up in upcoming EVAs. A malfunction in a new toilet in the Destiny laboratory caused the crew to use the one in the Russian segment while attempts were made to identify the fault. Meanwhile, the shuttle was cleared for reentry.


July 20 (Flight Day 6, EVA 2)

Astronauts Wolf and Marshburn began EVA 2 at 15:27 UTC out of the Quest airlock. The EVA was to transfer the spare components brought by the shuttle from the ICC-VLD to
External Stowage Platform External stowage platforms (ESPs) are key components of the International Space Station (ISS). Each platform is made from steel and serves as an external pallet that can hold spare parts, also known as orbital replacement units (ORUs), for the spa ...
-3. The spares were handled by Wolf riding the station's robotic arm to the P3 truss stowage platform where he and Marshburn attached them for long-term storage. The purpose of the spares was to provide redundancy to the station in the period following the shuttle's retirement. The spares unloaded include a Ku-Band Space-to-Ground antenna, a pump module for the coolant system and a drive unit for the station's robotic arm's mobile transporter. A planned installation of a camera on the Japanese Experiment Facility was postponed to a future EVA for want of time. Meanwhile, the malfunctioning toilet was set right with the replacement of internal parts and cleared for normal use after tests. File:STS-127 EVA2 Wolf4.jpg, Dave Wolf performs his second space walk, which is also the second of five scheduled space walks for STS-127. File:Astronaut Tom Marshburn performs his first spacewalk.jpg, Tom Marshburn performs his first space walk, the STS-127 crew's second of the five scheduled. File:Astronaut Tom Marshburn performs his first spacewalk (2).jpg, Another view of Marshburn during his first space walk.


July 21 (Flight Day 7)

In one of the more relaxed days, the Japanese logistics carrier was attached to the Japanese Exposed Facility. The cargo pallet was unberthed from the shuttle by the shuttle's robotic arm and handed to the station's robotic arm which then soft fixed it temporarily to the facility. After the experiments, containing an X-ray astronomy payload, a space environment monitor and a communications system, are installed the pallet will be returned to Earth by the shuttle.


July 22 (Flight Day 8, EVA 3)

The spacewalk involving astronauts Wolf and Cassidy started at 14:32 UTC. As part of preparation for experiment installation on the Japanese external science deck, Cassidy removed the thermal covers off the experiment carrier. Meanwhile, Wolf removed obstructions, consisting of a steel handrail and an equipment installation socket, from the ''Harmony'' node to clear the way for an upcoming Japanese automated resupply ship. The other task for EVA 3, involving replacement of four of the six batteries in the P6 truss, did not go as planned. Each 170 kg (375 lb) battery was to be removed and placed in a temporary stowage platform while a new one is taken from the ICC-VLD and fixed. The old ones will be returned to Earth. When two new batteries had been installed and three old ones removed, the levels in Cassidy's suit showed an upward trend. Even though it never exceeded the safety limits, the EVA was called off with both astronauts returning into the station. This left one old battery in a temporary flexible stowage position. The rest of the batteries will be installed in a future EVA with the rest of the EVAs being under replanning.


July 23 (Flight Day 9)

The ''Kibō'' robotic arm was inaugurated operationally with it being used to install experiments on to the Japanese exposed facility. The three experiments, transferred from the Japanese cargo pallet, consisted of Monitor of All-sky X-ray Image, Inter-orbit Communication System and Space Environment Data Acquisition Equipment-Attached Payload. As per the revised plan for EVA 4 astronauts Cassidy and Marshburn will replace the remaining four batteries on P6 and complete the already deferred installation of a camera on the Japanese experiment facility.


July 24 (Flight Day 10, EVA 4)

The fourth spacewalk, by Cassidy and Marshburn, involved replacement of the final four of the six batteries on P6 truss integrated electronics assembly. After berthing the old batteries in the ICC-VLD, the cargo pallet was returned to the ''Endeavour''s payload bay by the shuttle's robotic arm. The elevated levels of in Cassidy's suit during EVA 3 was attributed to the astronaut working at a fast pace.


July 25 (Flight Day 11)

The crew of both the shuttle and station had a day off. The day was uneventful except for the station's American removal system shutting down without any immediate impact.


July 26 (Flight Day 12)

The Japanese Exposed Section cargo carrier was berthed in ''Endeavour''s payload bay by the shuttle's robotic arm after it was handed the pallet by the station's robotic arm. After this the crew of both the station and the shuttle held a joint news conference. Meanwhile, the malfunctioning American removal system has been transitioned to manual mode in order to keep it running.


July 27 (Flight Day 13, EVA 5)

Cassidy and Marshburn started EVA 5 at 11:33 UTC when they switched their suit power to internal battery. For this spacewalk, the absorbent system in the suits were changed from
Lithium Hydroxide Lithium hydroxide is an inorganic compound with the formula LiOH. It can exist as anhydrous or hydrated, and both forms are white hygroscopic solids. They are soluble in water and slightly soluble in ethanol. Both are available commercially. While ...
to METOX due to problems with Cassidy's usage. Cassidy completed the reconfiguring of power channels in the Zenith 1 patch panel which are used for the control moment gyroscopes. Before the rewiring, two of the gyroscopes were fed by the same power channel. Since a failure of the channel can knock down two gyros and put the station in a degraded position the reconfiguration was made necessary. This rewiring made the two gyros to operate from separate power channels. Meanwhile, Marshburn secured some multi-layered insulation on the Dextre. Later both the spacewalkers installed video cameras on the front and back of the Japanese exposed facility which will be used in dockings of the Japanese cargo crafts and normal operation. The cameras flew up in launch configuration and now have been installed in an operational configuration, thus completing the JEF assembly. Meanwhile, due to Cassidy's METOX limitation, the deployment of the PAS was deferred to a future spacewalk. Instead some get ahead tasks were completed which included installation of handrails and a portable foot restraint.


July 28 (Flight Day 14, ISS Undocking)

After a crew farewell ''Endeavour'' undocked from the ISS at 17:26 UTC. Unlike most other launches, hatch closure, which happened at 15:08 UTC, and undocking happened on the same day due to the extended delay in launching and the arrival of the
Progress 34 Progress 34 () was a Soviet uncrewed Progress cargo spacecraft, which was launched in January 1988 to resupply the Mir space station. Launch Progress 34 launched on 20 January 1988 from the Baikonur Cosmodrome in the Kazakh SSR. It used a Soyuz ...
cargo craft. After undocking Hurley began a fly around of the station giving the shuttle crew an opportunity to photograph the station's current configuration in all directions. Then a final separation burn was completed at 3:09 pm EDT. File:Endeavour shortly after shuttle and station post-undocking separation.jpg, ''Endeavour'' shortly after the shuttle and station post-undocking separation. File:ISS & Endeavour Shadow STS-127 2.jpg, ISS shortly after the shuttle and station post-undocking separation with the JEF prominently seen.


July 29 (Flight Day 15)

The OBSS was grappled by the shuttle's robotic arm and used to inspect ''Endeavour''s thermal protection system for damage from orbital debris. The imagery will be analyzed to clear the shuttle for reentry. Meanwhile, the foam loss on the external tank was initially attributed to substrate contamination ahead of the application of the foam. Later during the processing of
STS-128 STS-128 (ISS assembly flight 17A) was a NASA Space Shuttle mission to the International Space Station (ISS) that launched on August 28, 2009. carried the Multi-Purpose Logistics Module ''Leonardo'' as its primary payload. ''Leonardo'' contain ...
, voids in the foam was highlighted as a trigger for the shedding. The air trapped in the voids could have expanded due to the high temperatures generated during ascent thus breaking the foam.


July 30 (Flight Day 16)

The crew checked out the shuttle's systems for the landing, and successfully deployed the
DRAGONSat DRAGONSat (Dual RF Astrodynamic GPS Orbital Navigator Satellite) is a pair of nanosatellites that will be demonstrating autonomous rendezvous and docking (ARD) in low Earth orbit (LEO) for NASA. It will be gathering flight data with a global po ...
and ANDE-2 satellites. The shuttle was cleared for reentry, with the TPS imagery showing no concerns. The shuttle tracked two chances of landing at KSC on July 31, and could land no later due to its limited
carbon dioxide Carbon dioxide ( chemical formula ) is a chemical compound made up of molecules that each have one carbon atom covalently double bonded to two oxygen atoms. It is found in the gas state at room temperature. In the air, carbon dioxide is t ...
-scrubbing LiOH supply.


July 31 (Flight Day 17, Landing)

After a 16-day mission, ''Endeavour'' landed successfully at Kennedy Space Center at 10:48 EDT on July 31, 2009. The landing had to be undertaken before August 1, due to -scrubbing
lithium hydroxide Lithium hydroxide is an inorganic compound with the formula LiOH. It can exist as anhydrous or hydrated, and both forms are white hygroscopic solids. They are soluble in water and slightly soluble in ethanol. Both are available commercially. While ...
limitations. There were two opportunities to land on July 31, of which the first was ultimately utilized. File:STS-127 Landing 02.jpg, ''Endeavour'' touches down at Kennedy Space Center. File:STS-127 Landing 01.jpg, ''Endeavour'' deploys its drag chute to aid deceleration.


EVAs

Five
spacewalks Extravehicular activity (EVA) is any activity done by an astronaut in outer space outside a spacecraft. In the absence of a breathable Earthlike atmosphere, the astronaut is completely reliant on a space suit for environmental support. EVA inc ...
were conducted during STS-127.


Wake-up calls

NASA began a tradition of playing music to astronauts during the
Gemini program Project Gemini () was NASA's second human spaceflight program. Conducted between projects Mercury and Apollo, Gemini started in 1961 and concluded in 1966. The Gemini spacecraft carried a two-astronaut crew. Ten Gemini crews and 16 individual ...
, and first used music to wake up a flight crew during
Apollo 15 Apollo 15 (July 26August 7, 1971) was the ninth crewed mission in the United States' Apollo program and the fourth to land on the Moon. It was the first J mission, with a longer stay on the Moon and a greater focus on science than ear ...
. Each track is specially chosen, often by the astronauts' families, and usually has a special meaning to an individual member of the crew, or is applicable to their daily activities.


See also

*
2009 in spaceflight Several significant events in spaceflight occurred in 2009, including Iran conducting its first indigenous orbital launch, the first Swiss satellite being launched and New Zealand launching its first sounding rocket. The H-IIB and Naro-1 rocke ...
*
List of human spaceflights This is a list of all human spaceflights throughout history. Beginning in 1961 with the flight of Yuri Gagarin aboard Vostok 1, human spaceflight occurs when a human crew flies a spacecraft into outer space. Human spaceflight is distinguish ...
* List of International Space Station spacewalks * List of Space Shuttle missions *
List of spacewalks 2000–2014 This list contains all spacewalks performed between 12 May 2000 and 22 October 2014 where an astronaut fully or partially left a spacecraft. 2000–2004 spacewalks ''Spacewalk beginning and ending times are given in Coordinated Universal Time ...


Media

File:Endeavour Ksc 071509 sts127 launch1.ogg, Space Shuttle ''Endeavour'' launches from Launch Pad 39A at
Kennedy Space Center The John F. Kennedy Space Center (KSC, originally known as the NASA Launch Operations Center), located on Merritt Island, Florida, is one of the National Aeronautics and Space Administration's (NASA) ten field centers. Since December 196 ...
as part of the STS-127 mission File:Sts-127 landing.ogv, Space Shuttle ''Endeavour'' landing


References

;Notes ;Inline citations ;NASA


External links


SpaceFlightNow's Mission Status Center for STS-127





Mark Polansky on Twitter

NASA's Twitter page
{{DEFAULTSORT:STS-127 Spacecraft launched in 2009 Space Shuttle missions Spacecraft which reentered in 2009 Articles containing video clips