STS-123 was a
Space Shuttle The Space Shuttle is a retired, partially reusable low Earth orbital spacecraft system operated from 1981 to 2011 by the U.S. National Aeronautics and Space Administration (NASA) as part of the Space Shuttle program. Its official program n ...
mission to the
International Space Station The International Space Station (ISS) is the largest Modular design, modular space station currently in low Earth orbit. It is a multinational collaborative project involving five participating space agencies: NASA (United States), Roscosmos ( ...
(ISS) which was flown by Space Shuttle ''Endeavour''. STS-123 was the 1J/A ISS assembly mission. The original launch target date was 14 February 2008 but after the delay of STS-122, the shuttle was launched on 11 March 2008. It was the twenty-fifth shuttle mission to visit the ISS, and delivered the first module of the Japanese laboratory, Japanese Experiment Module (''Kibō''), and the Canadian Special Purpose Dexterous Manipulator, (SPDM) Dextre robotics system to the station. The mission duration was 15 days and 18 hours, and it was the first mission to fully utilize the Station-to-Shuttle Power Transfer System (SSPTS), allowing space station power to augment the shuttle power systems. The mission set a record for a shuttle's longest stay at the ISS.


Crew


Mission payloads

STS-123 delivered the pressurized section of the Japanese Experiment Logistics Module (ELM-PS) as well as the Special Purpose Dexterous Manipulator (SPDM) to the International Space Station. The SPDM was delivered disassembled on a
Spacelab Spacelab was a reusable laboratory developed by European Space Agency (ESA) and used on certain spaceflights flown by the Space Shuttle. The laboratory comprised multiple components, including a pressurized module, an unpressurized carrier ...
Pallet (SLP) and assembled during three spacewalks once it was at the station.


Shuttle processing

In August 2007, STS-123 crew members participated in crew equipment interface tests for the ELM-PS at
Kennedy Space Center The John F. Kennedy Space Center (KSC, originally known as the NASA Launch Operations Center), located on Merritt Island, Florida, is one of the National Aeronautics and Space Administration's (NASA) ten field centers. Since December 196 ...
. Processing continued on schedule for ''Endeavours launch in early 2008. NASA engineers applied the same ECO sensor modifications used on STS-122's external tank, to ''Endeavour's'' tank. In January, a HEPA filter contamination issue was discovered, but was resolved and with no impact to the mission. On 11 February 2008, ''Endeavour'' was "rolled over" to the
Vehicle Assembly Building The Vehicle Assembly Building (originally the Vertical Assembly Building), or VAB, is a large building at NASA's Kennedy Space Center (KSC), designed to assemble large pre-manufactured space vehicle components, such as the massive Saturn V and t ...
in preparation for mating with the external tank and solid rocket boosters. On 13 February 2008, ''Endeavour'' was successfully mated with its external tank and solid rocket boosters, and was rolled out to
Launch Pad 39A Launch Complex 39A (LC-39A) is the first of Launch Complex 39's three launch pads, located at NASA's Kennedy Space Center in Merritt Island, Florida. The pad, along with Launch Complex 39B, were first designed for the Saturn V launch vehicle. ...
in the early hours of 18 February 2008, for its planned launch on 11 March 2008. The Terminal Countdown Demonstration Test, a full dress rehearsal for launch with the crew, took place 23–25 February 2008.


Mission background

The mission marked: * Longest shuttle mission to the ISS to date * 153rd NASA crewed spaceflight * 122nd Space Shuttle flight since STS-1 * 97th post-''Challenger'' mission * 9th post-''Columbia'' mission * 30th Night Launch * 16th KSC Shuttle Night Landing, 22nd Shuttle Night Landing Overall * 21st launch of ''Endeavour'' * 2nd mission of ''Endeavour'' since Return to Flight


Mission timeline

Flight days are based on the days as experienced by the astronauts, who are generally in a day-and-night pattern that is not equal to that of the launch site. The first flight day is the day of launch for the astronauts. That day started at the launch site on 10 March 2008 (local time), with the actual launch in the early hours of the 11th and the astronauts going to bed several hours after launch. 10 March 2008 is called flight day 1 by NASA, even though the actual mission launched on 11 March.


11 March (Flight day 1, Launch)

''Endeavour'' launched on time at 02:28:14 EDT (06:28:14 UTC) early into the night of 11 March 2008, from Launch Complex 39A at the
Kennedy Space Center The John F. Kennedy Space Center (KSC, originally known as the NASA Launch Operations Center), located on Merritt Island, Florida, is one of the National Aeronautics and Space Administration's (NASA) ten field centers. Since December 196 ...
. The Flash Evaporator System switched from its primary controller to the backup controller during launch, and instrumentation for a few left-side control thrusters was lost due to a card failure. These anomalies were not expected to affect the mission.


12 March (Flight day 2)

The shuttle closed in on the space station. The crew used a 50 ft (15 m) laser-tipped boom to inspect its wings and nose for any sign of launch damage. The inspection has been standard procedure ever since the 2003 ''Columbia'' disaster. Flight director Mike Moses said a quick look at the images the astronauts beamed down to Earth revealed no signs of trouble. In addition to performing the inspection, the astronauts also prepared their spacesuits for the five planned spacewalks and gathered the tools they would need for the docking.


13 March (Flight day 3)

Endeavour's commander, Dominic Gorie, guided the shuttle through a 360-degree backflip, known as the rendezvous pitch maneuver, to allow for full photographic surveillance of the thermal tiles on the Space Shuttle's underside before docking with the space station. Docking occurred at 03:49 UTC and the hatches between the two spacecraft were opened at 05:36 UTC on. After docking the pallet carrying Dextre was moved to the Payload ORU Accommodation (POA) of the Mobile Base Station (MBS) by Canadarm2.


14 March (Flight day 4)

Spacewalkers Richard Linnehan and Garrett Reisman worked on installing Dextre. However, the Spacelab pallet carrying the SPDM would not power up. Engineers on the ground tried a software patch, though later suspected a design flaw in Dextres temporary power cable caused the issue. Crew members on board ''Endeavour'' used a robotic arm to remove the Japanese Logistics Module – Pressurized Section (JLP) from ''Endeavour''s cargo bay and attach it to the space station. The JLP was attached to its interim location on the ''
Harmony In music, harmony is the process by which individual sounds are joined together or composed into whole units or compositions. Often, the term harmony refers to simultaneously occurring frequencies, pitches ( tones, notes), or chords. Howeve ...
'' module at 08:06 UTC.


15 March (Flight day 5)

The crew spent time outfitting the Japanese Logistics Module, transferring supplies and equipment into it from Space Shuttle ''Endeavour''. The station's arm operators grappled the Canadian-built Dextre Friday at 01:59 UTC. Canadarm2 successfully powered up Dextre 11 minutes later. Mission Specialists Rick Linnehan and Mike Foreman spent the night in the station's Quest Airlock in preparation for the second spacewalk of the mission.


16 March (Flight day 6)

Dextre was put together today during the second spacewalk of STS-123. Mission Specialists Richard Linnehan and Mike Foreman completed their 7-hour, 8-minute orbital stroll Sunday at 06:57 UTC. The spacewalkers encountered some difficulty removing two bolts that secured the robot arm during transport, and had to resort to using a prybar to remove them. Throughout the day, the station and shuttle crew members continued outfitting the Japanese Logistics Module – Pressurized Section.


17 March (Flight day 7)

The crews continued outfitting the Japanese Logistics Module – Pressurized Section, transferring supplies and equipment into it from Endeavour, as well as configuring racks inside the module. The crews tested the brakes in the robotic system's arms. One of the joints in the arm seemed to be operating right on the required margin. Engineers expressed confidence that this issue would be resolved Rick Linnehan and Robert Behnken ended their day by "camping out" in the station's Quest Airlock.


18 March (Flight day 8)

Linnehan and Behnken began the third EVA at 22:51 UTC. The excursion lasted six hours and 53 minutes. Linnehan and Behnken installed a spare parts platform, cameras, and tool handling assembly for Dextre. Among other tasks, they also checked out and calibrated Dextres end effector and attached critical spare parts to an
External Stowage Platform External stowage platforms (ESPs) are key components of the International Space Station (ISS). Each platform is made from steel and serves as an external pallet that can hold spare parts, also known as orbital replacement units (ORUs), for the spa ...
. They were unable to attach a materials science experiment to the ''Columbus'' module due to issues with the attachment fitting, but anticipated another opportunity later in the mission.


19 March (Flight day 9)

In a day highlighted by robotics activity, Dextre was attached to a power and data grapple fixture located on the U.S. laboratory '' Destiny''. Canadarm2 grabbed the pallet that secured Dextre during its journey to the orbital outpost and returned the pallet to Space Shuttle ''Endeavour''s payload bay for the trip back to Earth. The station and shuttle crews also prepared hardware to be used in a shuttle tile repair test on the next spacewalk, and got some much needed off duty time.


20 March (Flight day 10)

The crews of Space Shuttle ''Endeavour'' and the International Space Station got some off-duty time at the beginning of their 10th day in orbit. They also spoke to Japanese Prime Minister Yasuo Fukuda and participated in interviews with U.S. media. The astronauts spent the remainder of their day configuring tools for the fourth STS-123 spacewalk and reviewing spacewalk procedures. Before going to sleep, Mission Specialists Robert L. Behnken and Mike Foreman entered the station's ''Quest'' airlock for the standard "camp out".


21 March (Flight day 11)

Mission Specialists Robert L. Behnken and Mike Foreman completed the fourth STS-123 spacewalk at 04:28 UTC, spending six hours and 24 minutes on the excursion. The two shuttle crew members replaced a failed Remote Power Control Module — essentially a circuit breaker — on the station's truss. However, there were difficulties removing a power connector from the Z1
truss A truss is an assembly of ''members'' such as beams, connected by ''nodes'', that creates a rigid structure. In engineering, a truss is a structure that "consists of two-force members only, where the members are organized so that the assembl ...
. With Mission Specialist Rick Linnehan coordinating their activities from inside the orbiting complex, the spacewalkers also tested a repair method for damaged heat resistant tiles on the Space Shuttle. This technique used a caulk-gun-like tool named the Tile Repair Ablator Dispenser to dispense a material called Shuttle Tile Ablator-54 into purposely damaged heat shield tiles. The sample tiles will be returned to Earth to undergo extensive testing on the ground.


22 March (Flight day 12)

The STS-123 crew performed the final inspection of Space Shuttle ''Endeavour''s heat shield using the shuttle's robot arm and the Orbiter Boom Sensor System ( OBSS). Gorie, Johnson, and Doi surveyed the orbiter's wings and nose cap to ensure that no damage had occurred to the tiles that protect Endeavour from the heat of reentry. The crews spent the remainder of their day configuring tools and reviewing procedures for the flight's final spacewalk. This included the standard "camp out" in the station's ''Quest'' airlock for Behnken and Foreman.


23 March (Flight day 13)

Michael Foreman and Robert Behnken completed their six-hour EVA at 02:36 (UTC), attaching a 50 ft (15 m) inspection pole to the International Space Station and completing other chores. Foreman and Behnken hooked an extra-long power cord to the inspection pole, to keep its lasers and cameras warm for the next two months, then secured the boom to the outside of the space station. After finishing that task, Foreman inspected a jammed rotating joint that has restricted the use of a set of solar wings for months. NASA hopes to have a plan for dealing with the jammed joint by the end of the month, space station flight director Dana Weigel said.


24 March (Flight day 14)

The crews of Space Shuttle ''Endeavour'' and the International Space Station completed their last full day together. Much of the astronauts' morning was off-duty time. Afterward, the crews wrapped up transfers of equipment and supplies between ''Endeavour'' and the station, and out the tools needed for undocking and subsequent activities. The STS-123 and Expedition 16 crews also held a joint crew news conference, answering questions from members of the media on Earth.


25 March (Flight day 15)

The hatches between ''Endeavour'' and the
International Space Station The International Space Station (ISS) is the largest Modular design, modular space station currently in low Earth orbit. It is a multinational collaborative project involving five participating space agencies: NASA (United States), Roscosmos ( ...
closed around 21:49 UTC, ending a 12-day stay at the ISS, with a scheduled undocking of 23:57 UTC. Because of problems with a command sent to solar arrays in the ISS, the undocking was delayed 28 minutes and occurred at 00:25 UTC.


26 March (Flight day 16)

The crew of Space Shuttle ''Endeavour'' spent Tuesday getting ready for its journey home and the end of the STS-123 mission. Early in their day, the crew members performed a test of the thrusters that will be used to position the orbiter for re-entry and the control surfaces for its flight through the atmosphere. The STS-123 astronauts also set up the recumbent seat for Mission Specialist Léopold Eyharts, who joined the crew of ''Endeavour'' on the International Space Station. The recumbent seat is a special seat designed to reduce the stress of gravity on those who have spent long periods of time in the weightless environment of space.


27 March (Flight day 17, landing)

Flight controllers gave a no-go on de-orbit for the first landing opportunity at 23:05 UTC (19:05 EDT), due to unfavorable weather conditions at the Shuttle Landing Facility at
Kennedy Space Center The John F. Kennedy Space Center (KSC, originally known as the NASA Launch Operations Center), located on Merritt Island, Florida, is one of the National Aeronautics and Space Administration's (NASA) ten field centers. Since December 196 ...
. Weather conditions were acceptable for the second landing opportunity, planned for 00:39 UTC 27 March 2008 (20:39 EDT 26 March 2008). The landing occurred at the Shuttle Landing Facility, and was the sixteenth night landing of the
Space Shuttle The Space Shuttle is a retired, partially reusable low Earth orbital spacecraft system operated from 1981 to 2011 by the U.S. National Aeronautics and Space Administration (NASA) as part of the Space Shuttle program. Its official program n ...
at KSC, 22nd Shuttle night landing overall. Coincidentally, this mission also began with a night launch. The second landing opportunity was a complete success with main gear touchdown occurring at 20:39:08 EDT (00:39:08 UTC 27 March 2008), nose gear touchdown at 20:39:17 EDT (00:39:17 UTC 27 March 2008), and wheels stop at 20:40:41 EDT (00:40:41 UTC 27 March 2008), completing the STS-123 crew's 16 days, 14 hours, 12 minutes, 27 seconds space voyage. The exhaust produced by the Hydrazine Gas Generator APUs on either side of ''Endeavour''s tail fin created concern among some observers that something was amiss, as it appeared more pronounced than usual in NASA's visual light cameras. However, this exhaust is normal and expected. The three Hydrazine Gas Generator APUs are activated five minutes before the deorbit burn and are running for five minutes after wheels stop. The mono-propellant hydrazine changes phase due to a catalyst and reaches 1,700 °F (927 °C). The hydraulic power is needed for the shuttle's
rudder A rudder is a primary control surface used to steer a ship, boat, submarine, hovercraft, aircraft, or other vehicle that moves through a fluid medium (generally air or water). On an aircraft the rudder is used primarily to counter adve ...
/
speed brake In aeronautics, air brakes or speed brakes are a type of flight control surface used on an aircraft to increase the drag on the aircraft. Air brakes differ from spoilers in that air brakes are designed to increase drag while making litt ...
, elevons, body flap and
landing gear Landing gear is the undercarriage of an aircraft or spacecraft that is used for takeoff or landing. For aircraft it is generally needed for both. It was also formerly called ''alighting gear'' by some manufacturers, such as the Glenn L. Mart ...
during descent, and for the main engine nozzles' gimballing during ascent. Each of the Solid Rocket Boosters have two similar Hydrazine Gas Generators for their nozzle gimballing.


Extra-vehicular activity

Five spacewalks took place during the flight. The cumulative time in extra-vehicular activity during the mission was 33 hours and 28 minutes.


Wake-up calls

NASA began a tradition of playing music to astronauts during the Gemini program, which was first used to wake up a flight crew during
Apollo 15 Apollo 15 (July 26August 7, 1971) was the ninth crewed mission in the United States' Apollo program and the fourth to land on the Moon. It was the first J mission, with a longer stay on the Moon and a greater focus on science than ear ...
. Each track is specially chosen, often by their families, and usually has a special meaning to an individual member of the crew, or is applicable to their daily activities.


Contingency mission

STS-324 was the designation given to the Contingency Shuttle Crew Support mission which would have been launched in the event Space Shuttle ''Endeavour'' became disabled during STS-123. It would have been a modified version of the
STS-124 STS-124 was a Space Shuttle mission, flown by Space Shuttle ''Discovery'' to the International Space Station. ''Discovery'' launched on 31 May 2008 at 17:02 EDT, moved from an earlier scheduled launch date of 25 May 2008, and landed safely at ...
mission and would have involved the launch date being brought forward. The crew for this mission would have been a four-person subset of the full STS-124 crew.


Media


References


External links


STS-123 ''Endeavour'' landing


* ttp://www.spaceref.com/news/viewpr.html?pid=22191 NASA Assigns Crew for Shuttle Mission to Install Japanese Lab Spaceref.com, 22 March 2007
Up to the minute updates of STS-123 Mission


{{Use American English, date=January 2014 Space Shuttle missions Spacecraft launched in 2008 Spacecraft which reentered in 2008 Articles containing video clips