STS-115
   HOME

TheInfoList



OR:

STS-115 was a
Space Shuttle The Space Shuttle is a retired, partially reusable low Earth orbital spacecraft system operated from 1981 to 2011 by the U.S. National Aeronautics and Space Administration (NASA) as part of the Space Shuttle program. Its official program n ...
mission to the
International Space Station The International Space Station (ISS) is the largest Modular design, modular space station currently in low Earth orbit. It is a multinational collaborative project involving five participating space agencies: NASA (United States), Roscosmos ( ...
(ISS) flown by . It was the first assembly mission to the ISS after the ''Columbia'' disaster, following the two successful ''Return to Flight'' missions,
STS-114 STS-114 was the first "Return to Flight" Space Shuttle mission following the Space Shuttle ''Columbia'' disaster. ''Discovery'' launched at 10:39 EDT (14:39 UTC), July 26, 2005. The launch, 907 days (approx. 29 months) after the loss of ''Co ...
and
STS-121 STS-121 was a 2006 NASA Space Shuttle mission to the International Space Station (ISS) flown by . The main purposes of the mission were to test new safety and repair techniques introduced following the ''Columbia'' disaster of February 2003 as w ...
. STS-115 launched from
LC-39B Launch Complex 39B (LC-39B) is the second of Launch Complex 39's three launch pads, located at NASA's Kennedy Space Center in Merritt Island, Florida. The pad, along with Launch Complex 39A, was first designed for the Saturn V launch vehicle, ...
at the
Kennedy Space Center The John F. Kennedy Space Center (KSC, originally known as the NASA Launch Operations Center), located on Merritt Island, Florida, is one of the National Aeronautics and Space Administration's (NASA) ten field centers. Since December 196 ...
on 9 September 2006 at 11:14:55 EDT (15:14:55 UTC). The mission is also referred to as ISS-12A by the ISS program. The mission delivered the second port-side
truss A truss is an assembly of ''members'' such as beams, connected by ''nodes'', that creates a rigid structure. In engineering, a truss is a structure that "consists of two-force members only, where the members are organized so that the assembl ...
segment (ITS P3/P4), a pair of solar arrays (2A and 4A), and
batteries Battery most often refers to: * Electric battery, a device that provides electrical power * Battery (crime), a crime involving unlawful physical contact Battery may also refer to: Energy source *Automotive battery, a device to provide power t ...
. A total of three spacewalks were performed, during which the crew connected the systems on the installed trusses, prepared them for deployment, and did other maintenance work on the station. STS-115 was originally scheduled to launch in April 2003. The ''Columbia'' accident in February 2003 pushed the date back to 27 August 2006, which was again moved back for various reasons, including a threat from Tropical Storm Ernesto and the strongest lightning strike to ever hit an occupied shuttle launchpad.


Crew

Note:The P3/P4 Truss segment and batteries were so heavy (more than 17.5
short ton The short ton (symbol tn) is a measurement unit equal to . It is commonly used in the United States, where it is known simply as a ton, although the term is ambiguous, the single word being variously used for short, long, and metric ton. The var ...
s, or roughly 16
metric ton The tonne ( or ; symbol: t) is a unit of mass equal to 1000  kilograms. It is a non-SI unit accepted for use with SI. It is also referred to as a metric ton to distinguish it from the non-metric units of the short ton (United States ...
s) that the crew count was reduced from seven to six.


Crew notes

Canadian Space Agency astronaut MacLean became the first Canadian to operate
Canadarm2 The Mobile Servicing System (MSS), is a robotic system on board the International Space Station (ISS). Launched to the ISS in 2001, it plays a key role in station assembly and maintenance; it moves equipment and supplies around the station, su ...
and its Mobile Base in space as he was handed a new set of solar arrays from Ferguson and Burbank controlling the original Canadian robotic arm, the
Canadarm Canadarm or Canadarm1 (officially Shuttle Remote Manipulator System or SRMS, also SSRMS) is a series of robotic arms that were used on the Space Shuttle orbiters to deploy, manoeuvre, and capture payloads. After the Space Shuttle ''Columbia ...
. MacLean performed a spacewalk, becoming only the second Canadian, after
Chris Hadfield Chris Austin Hadfield (born August 29, 1959) is a Canadian retired astronaut, engineer, fighter pilot, and musician. The first Canadian to perform extravehicular activity in outer space, he has flown two Space Shuttle missions and also se ...
to do so. The mission patch worn on the clothing used by the astronauts of STS-115 was designed by Graham Huber, Peter Hui, and Gigi Lui, three students at
York University York University (french: Université York), also known as YorkU or simply YU, is a public research university in Toronto, Ontario, Canada. It is Canada's fourth-largest university, and it has approximately 55,700 students, 7,000 faculty and sta ...
in
Toronto, Ontario Toronto ( ; or ) is the capital city of the Canadian province of Ontario. With a recorded population of 2,794,356 in 2021, it is the most populous city in Canada and the fourth most populous city in North America. The city is the ancho ...
, the same university that Steve MacLean attended. The students also designed Steve MacLean's personal patch for this mission.


Mission payloads

The primary payload was the second left-side ITS P3/P4 Truss segment, a pair of solar arrays, and associated batteries.


Mission objectives

* Delivery and installation of two truss segments (P3 and P4) * Delivery and deployment of two new solar arrays (4A and 2A) * Perform three spacewalks to connect truss segments, remove restraints on solar arrays, and prepare the station for the next assembly mission by
STS-116 STS-116 was a Space Shuttle mission to the International Space Station (ISS) flown by Space Shuttle '' Discovery''. ''Discovery'' lifted off on 9 December 2006 at 20:47:35 EST. A previous launch attempt on 7 December had been canceled due to cl ...


Mission background

NASA managers decided to move the STS-115 launch date forward to 27 August to obtain better lighting conditions to photograph the external tank. This occurred before with STS-31 and
STS-82 STS-82 was the 22nd flight of the Space Shuttle ''Discovery'' and the 82nd mission of the Space Shuttle program. It was NASA's second mission to service the Hubble Space Telescope, during which ''Discovery's'' crew repaired and upgraded the tel ...
. The launch window was co-ordinated with the
Soyuz TMA-9 Soyuz TMA-9 was a Soyuz mission to the International Space Station (ISS) launched by a Soyuz FG launch vehicle. It was a human spaceflight mission transporting personnel to and from the ISS. It launched from the Baikonur Cosmodrome on 18 September ...
launch in mid-September, which delivered a new ISS crew and fresh supplies to the station. The
Soyuz spacecraft Soyuz () is a series of spacecraft which has been in service since the 1960s, having made more than 140 flights. It was designed for the Soviet space program by the Korolev Design Bureau (now Energia). The Soyuz succeeded the Voskhod spacecr ...
operationally did not dock to the station while the
Space Shuttle The Space Shuttle is a retired, partially reusable low Earth orbital spacecraft system operated from 1981 to 2011 by the U.S. National Aeronautics and Space Administration (NASA) as part of the Space Shuttle program. Its official program n ...
was there. The mission marks: *147th NASA crewed space flight. *116th space shuttle flight since STS-1. *27th flight of ''Atlantis''. *91st post-''Challenger'' mission. *3rd post-''Columbia'' mission. *1st post-''Columbia'' mission of ''Atlantis''.


Mission timeline


Launch preparations

''Atlantis'' was rolled out from the
Orbiter Processing Facility Orbiter Processing Facility (OPF) is a class of hangars where U.S. Space Shuttle orbiters underwent maintenance between flights. They are located west of the Vehicle Assembly Building, where the orbiter was mated with its External Tank and Soli ...
to the
Vehicle Assembly Building The Vehicle Assembly Building (originally the Vertical Assembly Building), or VAB, is a large building at NASA's Kennedy Space Center (KSC), designed to assemble large pre-manufactured space vehicle components, such as the massive Saturn V and t ...
(VAB) on 24 July 2006. It was lowered onto the
mobile launcher platform A mobile launcher platform (MLP), also known as mobile launch platform, is a structure used to support a large multistage space vehicle which is assembled (stacked) vertically in an integration facility (e.g. the Vehicle Assembly Building) and t ...
on 26 July and rolled out to Pad 39B in the early morning hours of 2 August. The rollout was scheduled for 31 July, but a storm in the vicinity of the
Kennedy Space Center The John F. Kennedy Space Center (KSC, originally known as the NASA Launch Operations Center), located on Merritt Island, Florida, is one of the National Aeronautics and Space Administration's (NASA) ten field centers. Since December 196 ...
resulted in a delay of two days from fears of the orbiter being hit by lightning, which could cause immeasurable damage. On the weekend of 5 to 6 August 2006, engineers completed a "flight readiness" check of the shuttle's main engines, which were deemed ready for launch. The crew arrived at the Kennedy Space Center 7 August 2006 for four days of launch rehearsals, including a practice countdown 10 August. Top NASA managers held a Flight Readiness Review (FRR) meeting 15–16 August 2006 to finalize the launch date. Foam loss from the
external tank The Space Shuttle external tank (ET) was the component of the Space Shuttle launch vehicle that contained the liquid hydrogen fuel and liquid oxygen oxidizer. During lift-off and ascent it supplied the fuel and oxidizer under pressure to ...
was a key issue at this meeting because on 13 August 2006, NASA announced there was an average amount of loss from the external tank of STS-121, the previous mission. ''Columbias demise was due to a piece of foam, shed from its external tank, striking the shuttle's left wing during launch and causing a hole that was breached during re-entry. The meeting also discussed problems with the bolts securing the shuttle's Ku-band antenna, which might not have been threaded correctly. The installation had been in place for several flights and hadn't experienced any problems. At the end of the two-day meeting, NASA managers had decided to proceed with the launch on 27 August 2006. However, on 18 August 2006, NASA decided to replace the antenna bolts with ''Atlantis'' still on the launch pad. NASA had no procedure to replace these on the pad, but the work was nonetheless completed by 20 August, without affecting the planned launch date. On 25 August 2006, a direct lightning strike, the most powerful recorded at Kennedy Space Center, hit the lightning rod atop the launch pad. As a result, on 26 August the Mission Management Team ordered the mission postponed for at least 24 hours to assess damage. On 27 August, the decision was made to postpone the launch for another 24 hours, making the earliest possible launch date 29 August 2006, still unassured that there was no damage from the lightning strike and taking into account the possible threat from Hurricane Ernesto. On 28 August 2006 it was decided to postpone the launch and rollback ''Atlantis'' to the VAB after updated forecasts projected Hurricane Ernesto would regain its strength and pass closer to Kennedy Space Center than previously anticipated. NASA began rolling back the shuttle on 29 August 2006 in the late morning, but by early afternoon the decision was made to move ''Atlantis'' back to the launch pad (something that has never been done before) to weather out Tropical Storm Ernesto instead. The change came after weather forecasters determined that the storm wouldn't hit
Kennedy Space Center The John F. Kennedy Space Center (KSC, originally known as the NASA Launch Operations Center), located on Merritt Island, Florida, is one of the National Aeronautics and Space Administration's (NASA) ten field centers. Since December 196 ...
as forcefully as they once thought. Its peak winds were expected to be less than 79 mph (126 kilometers per hour), NASA's limit for keeping the shuttle outdoors. By the early morning of 31 August 2006, the storm had passed and inspection teams began a survey for damage to the launch facilities. Only three problems were discovered, all of which were simple repairs. A target date for launch was set for 6 September with the option to launch for another two days after NASA and Russian space managers agreed to extend the launch window by one day. On the morning of 3 September 2006, the official countdown began at the T minus 43-hour mark, with about 30 hours of scheduled holds. In the early morning of 6 September 2006, engineers observed an apparent internal short when one of the three electricity producing fuel cells was powered up. When engineers couldn't figure out the problem in time, the launch was scrubbed for the day to further analyze the fuel cell problem. Late Wednesday evening NASA managers decided that they would not attempt a launch on Thursday, and scheduled the next launch attempt for 8 September 2006. Originally they had ruled out 9 September as a potential launch date due to a conflict with the planned Russian
Soyuz Soyuz is a transliteration of the Cyrillic text Союз ( Russian and Ukrainian, 'Union'). It can refer to any union, such as a trade union (''profsoyuz'') or the Union of Soviet Socialist Republics (Сою́з Сове́тских Социалис ...
mission
Soyuz TMA-9 Soyuz TMA-9 was a Soyuz mission to the International Space Station (ISS) launched by a Soyuz FG launch vehicle. It was a human spaceflight mission transporting personnel to and from the ISS. It launched from the Baikonur Cosmodrome on 18 September ...
, which was scheduled to, and did, launch on 18 September 2006. This caused some news agencies to report that Friday as the last chance for a launch until October.


8 September (Launch attempt 1)

On the morning of 8 September 2006, it was reported that one of the engine cut-off (ECO) sensors in the external tank had failed. About half an hour before the scheduled launch time, NASA announced it had decided to delay the launch for another 24 hours while the fuel was drained out of the external tank and the problem assessed. The sensor in question, ECO sensor No. 3, was proved to be faulty when it indicated that there was still liquid hydrogen in the external tank despite all of it being drained out. The other three ECO sensors correctly indicated a dry tank; and as long as they didn't start to malfunction, NASA could allow a launch with three out of the four ECO sensors operational.


9 September (Flight day 1, Launch)

On 9 September 2006, all the engine cut-off sensors were working properly, and following a flawless countdown, at 15:15 UTC (11:15 EDT), ''Atlantis'' lifted off the launch pad to the
International Space Station The International Space Station (ISS) is the largest Modular design, modular space station currently in low Earth orbit. It is a multinational collaborative project involving five participating space agencies: NASA (United States), Roscosmos ( ...
. As ''Atlantis'' launched, the
International Space Station The International Space Station (ISS) is the largest Modular design, modular space station currently in low Earth orbit. It is a multinational collaborative project involving five participating space agencies: NASA (United States), Roscosmos ( ...
was (220 mi) above the northern Atlantic Ocean, between
Greenland Greenland ( kl, Kalaallit Nunaat, ; da, Grønland, ) is an island country in North America that is part of the Kingdom of Denmark. It is located between the Arctic and Atlantic oceans, east of the Canadian Arctic Archipelago. Greenland ...
and
Iceland Iceland ( is, Ísland; ) is a Nordic island country in the North Atlantic Ocean and in the Arctic Ocean. Iceland is the most sparsely populated country in Europe. Iceland's capital and largest city is Reykjavík, which (along with its ...
. During the climb to orbit, Mission Control asked the crew to reconfigure a cooling system that apparently had ice build up. The reconfiguration cleared the system, called the Flash Evaporator System, and it operated normally. Temporary ice in that cooling unit is not uncommon and has occurred on previous missions. Moments after main engine cutoff, 8.5 minutes after liftoff, Tanner and MacLean used hand-held video and digital still cameras to document the external tank after it separated from the shuttle. That imagery, as well as imagery gathered by cameras in the shuttle's umbilical well where the tank was connected, was transmitted to the ground for review.


10 September (Flight day 2)

: During their first full day in space, the crew thoroughly examined ''Atlantis'' with the
Orbiter Boom Sensor System The Orbiter Boom Sensor System (OBSS) was a 50-foot (15.24 m) boom carried on board NASA's Space Shuttles. The boom was grappled by the Canadarm and served as an extension of the arm, doubling its length to a combined total of 100 feet (30 m). At ...
, the 15 meter (50-foot) long extension for the shuttle's
robotic arm A robotic arm is a type of mechanical arm, usually programmable, with similar functions to a human arm; the arm may be the sum total of the mechanism or may be part of a more complex robot. The links of such a manipulator are connected by join ...
. Pilot Chris Ferguson and mission specialists Dan Burbank and Steve MacLean performed a slow, steady inspection of the reinforced carbon-carbon panels along the leading edge of ''Atlantis
starboard Port and starboard are nautical terms for watercraft and aircraft, referring respectively to the left and right sides of the vessel, when aboard and facing the bow (front). Vessels with bilateral symmetry have left and right halves which ar ...
and
port A port is a maritime facility comprising one or more wharves or loading areas, where ships load and discharge cargo and passengers. Although usually situated on a sea coast or estuary, ports can also be found far inland, such as H ...
wings and the nose cap. The crew worked ahead of schedule for most of the day readying the ship for docking and preparing for the mission's three planned
extra-vehicular activities Extravehicular activity (EVA) is any activity done by an astronaut in outer space outside a spacecraft. In the absence of a breathable Earthlike atmosphere, the astronaut is completely reliant on a space suit for environmental support. EVA inc ...
(EVA). Mission specialists Joe Tanner and Heide Stefanyshyn-Piper checked out the
spacesuit A space suit or spacesuit is a garment worn to keep a human alive in the harsh environment of outer space, vacuum and temperature extremes. Space suits are often worn inside spacecraft as a safety precaution in case of loss of cabin pressure, ...
s and tools that they, Burbank and MacLean used during spacewalks set for Days 4, 5, and 7. The spacewalks installed the girder-like P3/P4 truss, deploy new solar arrays, and prepare them for operation. On the space station,
Expedition 13 Expedition 13 was the 13th expedition to the International Space Station (ISS), and launched at 02:30 UTC on 30 March 2006. The expedition used the Soyuz TMA-8 spacecraft, which stayed at the station for the duration of the expedition for emerge ...
Flight Engineer Jeffrey Williams prepared the orbiting laboratory for ''Atlantis arrival on Day 3. He readied the digital cameras that was used to take high-resolution photos of the shuttle's heat shield. With help from Commander
Pavel Vinogradov Pavel Vladimirovich Vinogradov (russian: Павел Владимирович Виноградов; born 31 August 1953 in Magadan, USSR) is a cosmonaut and former commander of the International Space Station. As of January 2023, he has flown in ...
, Williams pressurized the Pressurized Mating Adapter 2 at the end of the
Destiny Laboratory Module The ''Destiny'' module, also known as the U.S. Lab, is the primary operating facility for U.S. research payloads aboard the International Space Station (ISS). It was berthed to the ''Unity'' module and activated over a period of five days in F ...
, where ''Atlantis'' later docked. Vinogradov also prepacked equipment to be returned.


11 September (Flight day 3)

: Prior to docking, Jett flew ''Atlantis'' through an orbital back flip while stationed about 180 meters (600 feet) below the space station. The maneuver allowed the Expedition 13 crew to take a series of high-resolution photographs of the orbiter's heat shield. At about 10:46 UTC ''Atlantis'' docked with the
International Space Station The International Space Station (ISS) is the largest Modular design, modular space station currently in low Earth orbit. It is a multinational collaborative project involving five participating space agencies: NASA (United States), Roscosmos ( ...
, and almost two hours later the hatch between them was opened, and the crew was welcomed aboard the station at 12:35 UTC. : Following docking, Ferguson and Burbank attached the shuttle's robotic
Canadarm Canadarm or Canadarm1 (officially Shuttle Remote Manipulator System or SRMS, also SSRMS) is a series of robotic arms that were used on the Space Shuttle orbiters to deploy, manoeuvre, and capture payloads. After the Space Shuttle ''Columbia ...
to the 17.5-ton P3/P4 truss, lifted it from its berth in the payload bay, and maneuvered it for handover to the station's
Canadarm2 The Mobile Servicing System (MSS), is a robotic system on board the International Space Station (ISS). Launched to the ISS in 2001, it plays a key role in station assembly and maintenance; it moves equipment and supplies around the station, su ...
. After hatch opening, MacLean and Expedition 13 Flight Engineer Jeff Williams then used the Canadarm2 to take the truss from the shuttle's robotic arm. MacLean is the first Canadian to operate the Canadarm2 in space. Tanner and Stefanyshyn-Piper began the "camping out" preparations in the
Quest Airlock The ''Quest'' Joint Airlock, previously known as the Joint Airlock Module, is the primary airlock for the International Space Station. ''Quest'' was designed to host spacewalks with both Extravehicular Mobility Unit (EMU) spacesuits and Orlan s ...
to prepare for a Day 4 spacewalk. The preparations are new pre-breathing measures on the part of NASA, to avoid
decompression sickness Decompression sickness (abbreviated DCS; also called divers' disease, the bends, aerobullosis, and caisson disease) is a medical condition caused by dissolved gases emerging from solution as bubbles inside the body tissues during decompressio ...
, or ''the bends'', by getting rid of some
nitrogen Nitrogen is the chemical element with the symbol N and atomic number 7. Nitrogen is a nonmetal and the lightest member of group 15 of the periodic table, often called the pnictogens. It is a common element in the universe, estimated at se ...
in their bloodstreams. The preparations involve wearing oxygen masks and sleeping overnight in the airlock with the airlock at under 69 kPa (10 psi), to acclimate their bodies the low pressures they will encounter when wearing their
spacesuit A space suit or spacesuit is a garment worn to keep a human alive in the harsh environment of outer space, vacuum and temperature extremes. Space suits are often worn inside spacecraft as a safety precaution in case of loss of cabin pressure, ...
s.


12 September (Flight day 4)

: Following the installation of the P3/P4 Truss to the ISS by the
Canadarm2 The Mobile Servicing System (MSS), is a robotic system on board the International Space Station (ISS). Launched to the ISS in 2001, it plays a key role in station assembly and maintenance; it moves equipment and supplies around the station, su ...
, Tanner and Stefanyshyn-Piper began their spacewalk to activate the truss at 09:17 UTC. During the EVA they installed power and data cables between the P1 & P3/P4 trusses, released the P3/P4 truss' launch restraints and a number of other tasks to configure the truss for upcoming activities. The spacewalk was so successful that the astronauts carried out a number of tasks scheduled for later EVAs, with the eventual completion of the EVA at 15:43 UTC. A bolt, spring and washer assembly from a launch lock was lost during these extra activities and floated off into space. Following the completion of the EVA, the station's crew began preparing for Day 5's spacewalk, with astronauts Burbank and MacLean entering the
Quest Airlock The ''Quest'' Joint Airlock, previously known as the Joint Airlock Module, is the primary airlock for the International Space Station. ''Quest'' was designed to host spacewalks with both Extravehicular Mobility Unit (EMU) spacesuits and Orlan s ...
for their "camp out" at 18:40 UTC, ready for the scheduled 09:15 UTC EVA.


13 September (Flight day 5)

: On Day 5, the second spacewalk of the mission was conducted, this time by first-time spacewalkers Burbank and MacLean. They devoted the day to the final tasks required for activation of the Solar Alpha Rotary Joint (SARJ). The SARJ is an automobile-sized joint that will allow the station's solar arrays to turn and point toward the
sun The Sun is the star at the center of the Solar System. It is a nearly perfect ball of hot plasma, heated to incandescence by nuclear fusion reactions in its core. The Sun radiates this energy mainly as light, ultraviolet, and infrared radi ...
. Burbank and MacLean released locks that had held the joint secure during its launch to orbit aboard ''
Atlantis Atlantis ( grc, Ἀτλαντὶς νῆσος, , island of Atlas) is a fictional island mentioned in an allegory on the hubris of nations in Plato's works '' Timaeus'' and '' Critias'', wherein it represents the antagonist naval power that b ...
''. As they worked, the spacewalkers overcame several minor problems, including a malfunctioning helmet camera, a broken socket tool, a stubborn bolt, and a bolt that came loose from the mechanism designed to hold it captive. The stubborn bolt required the force of both spacewalkers to finally remove it. Burbank and MacLean spent 7 hours and 11 minutes outside the station, beginning their spacewalk at 09:05 UTC and completing it at 16:16 UTC. In addition to the SARJ work, they completed several "get-ahead" tasks during their time outside. Engineers encountered a glitch during the four-hour activation and checkout of SARJ, and had temporarily delayed starting the deployment of the new solar arrays pending further work and checkout of the SARJ. The timeline allowed ample time to continue working on the problem during the night and still complete the deploy of the arrays on Thursday as scheduled.


14 September (Flight day 6)

: Day 6 continued the installation of the
solar array A photovoltaic system, also PV system or solar power system, is an electric power system designed to supply usable solar power by means of photovoltaics. It consists of an arrangement of several components, including solar panels to absorb and ...
. The unfurling of the
solar panel A solar cell panel, solar electric panel, photo-voltaic (PV) module, PV panel or solar panel is an assembly of photovoltaic solar cells mounted in a (usually rectangular) frame, and a neatly organised collection of PV panels is called a photo ...
s themselves began a little behind schedule due to the problem encountered on Day 5 with SARJ. This problem was determined to be in the software, and a workaround was developed. The unfurling of the panels continued throughout the morning in stages to prevent the panels sticking, as they did during
STS-97 STS-97 was a Space Shuttle mission to the International Space Station (ISS) flown by Space Shuttle '' Endeavour''. The crew installed the first set of solar arrays to the ISS, prepared a docking port for arrival of the Destiny Laboratory Modul ...
. It was noted by the crew that some panels were still sticking together, but this didn't cause any problems. Although the installation has been completed, the solar arrays will not provide power to the station until the next shuttle mission,
STS-116 STS-116 was a Space Shuttle mission to the International Space Station (ISS) flown by Space Shuttle '' Discovery''. ''Discovery'' lifted off on 9 December 2006 at 20:47:35 EST. A previous launch attempt on 7 December had been canceled due to cl ...
, scheduled for December 2006, when the station will undergo a major electrical system rewiring. Other activities of Day 6 included a "double walk off" of the station's
Canadarm2 The Mobile Servicing System (MSS), is a robotic system on board the International Space Station (ISS). Launched to the ISS in 2001, it plays a key role in station assembly and maintenance; it moves equipment and supplies around the station, su ...
from its current location at the
Mobile Base System The Mobile Servicing System (MSS), is a robotic system on board the International Space Station (ISS). Launched to the ISS in 2001, it plays a key role in station assembly and maintenance; it moves equipment and supplies around the station, supp ...
to the
Destiny Laboratory Module The ''Destiny'' module, also known as the U.S. Lab, is the primary operating facility for U.S. research payloads aboard the International Space Station (ISS). It was berthed to the ''Unity'' module and activated over a period of five days in F ...
and the preparation for the mission's third spacewalk. A number of interviews were also conducted later in the day, between Jett & MacLean and Canadian Prime Minister
Stephen Harper Stephen Joseph Harper (born April 30, 1959) is a Canadian politician who served as the 22nd prime minister of Canada from 2006 to 2015. Harper is the first and only prime minister to come from the modern-day Conservative Party of Canada, ...
& students.


15 September (Flight day 7)

Flight day 7 featured the third and final spacewalk of mission STS-115. The start of the spacewalk was delayed after a circuit-breaker-like remote power controller (RPC) tripped, causing loss of power to the airlock's depressurization pump. This was attributed to a momentary spike in the electric current of the depressurization pump. After assessing data to ensure the system had no
short circuit A short circuit (sometimes abbreviated to short or s/c) is an electrical circuit that allows a current to travel along an unintended path with no or very low electrical impedance. This results in an excessive current flowing through the circu ...
, the breaker was reset and pump reactivated. Joe Tanner and Heide Stefanyshyn-Piper began their spacewalk at 10:00 UTC after a 45-minute delay During the 6-hour and 42-minute spacewalk, the astronauts carried out numerous maintenance and repair tasks including removal of hardware used to secure the P3/P4 radiator during launch. Ground Flight Controllers subsequently unfurled the radiator, increasing the ability of the station to dissipate heat into space. Also, completed during this spacewalk was the retrieval of a materials exposure experiment from the outside of the ISS, maintenance on the P6 truss, installation of a wireless TV aerial and the replacement of the S1 truss' S-band antenna assembly. A number of "get-ahead" tasks previously scheduled for future missions were also performed during this spacewalk. Near the end of the spacewalk, the astronauts carried out a test to evaluate using infrared video of the leading edge of ''Atlantis wing to detect debris damage. After the spacewalk, the station's mobile transporter was moved to a worksite on the P3 truss to inspect portions of that truss.


16 September (Flight day 8)

Day 8 of STS-115, the last full day with Space Shuttle ''
Atlantis Atlantis ( grc, Ἀτλαντὶς νῆσος, , island of Atlas) is a fictional island mentioned in an allegory on the hubris of nations in Plato's works '' Timaeus'' and '' Critias'', wherein it represents the antagonist naval power that b ...
'' docked to the ISS, was mainly spent in preparation for the undocking procedures to occur in flight day 9. The crew spent the morning resting following their highly successful mission, and then began getting ready for the undocking by carrying out transfers of ISS equipment and science experiments onto ''Atlantis'' ready for the trip home. The crews of
Expedition 13 Expedition 13 was the 13th expedition to the International Space Station (ISS), and launched at 02:30 UTC on 30 March 2006. The expedition used the Soyuz TMA-8 spacecraft, which stayed at the station for the duration of the expedition for emerge ...
and STS-115 also took part in the traditional joint-crew news conference, with mission Commander Brent Jett commenting on the success of the mission and on the construction missions to follow: "All of the rest of the assembly missions are going to be challenging. We have similar payloads flying in the future. We are off to a good start on assembly. I think we can pass along a lot of the lessons to the future crews."


17 September (Flight day 9)

Flight day 9 saw the end of STS-115's tasks at the ISS as ''
Atlantis Atlantis ( grc, Ἀτλαντὶς νῆσος, , island of Atlas) is a fictional island mentioned in an allegory on the hubris of nations in Plato's works '' Timaeus'' and '' Critias'', wherein it represents the antagonist naval power that b ...
'' undocked from the International Space Station at 12:50 UTC. Following the traditional farewell ceremonies between Expedition 13 and STS-115, the hatch between ''Atlantis'' and the ISS was closed and locked at 10:27 UTC. Then, after a series of checks for leaks, ''Atlantis'' left the dock to begin its 360-degree flyaround of the expanded ISS to document the new configuration.


18 September (Flight day 10)

The crew of STS-115 spent the morning of Flight Day 10 carrying out final inspections of ''Atlantis'' heat shield in preparation for re-entry on flight day 12. Orbiting around behind the ISS, the crew used the Orbiter's robotic arm and boom sensor system to make sure that no damage had been done to ''Atlantis'' nose and wing leading edges by micrometeoroids and other space junk. The crew spent the rest of this light duty day stowing equipment in preparation for re-entry and landing.


19 September (Flight day 11)

During the morning of day 11, astronauts Jett and Ferguson tested ''Atlantis reaction control thrusters and practiced for landing using on-board computers. The thrusters will be used to position the shuttle during re-entry. The crew also took some time for interviews, with Ferguson telling the media that everyone on board was looking forward to landing. "I think we all, thus far, feel pretty good about the job that we did," Ferguson said. "We are looking forward to a successful re-entry and landing sometime tomorrow." Following the interviews, the crew continued their preparations for re-entry by stowing unnecessary equipment and other tasks prior to landing. However, the crew informed the Mission Control Center later in the day that, following the test of the reaction control system, an object was seen moving in a co-orbital path with the Orbiter. The astronauts spotted the object using an on-board TV camera, but unfortunately the resolution of the images was not high enough to identify the object. The images were sent down to the MCC for further analysis by flight controllers, who were concerned about the possibility that the object may have come off ''Atlantis'', and as such wished to identify the object. The most likely scenario was that the object was benign, such as ice or a piece of shimstock (observed earlier in the flight protruding from the heat shield) that may have shaken loose. However, the possibility remained that the object may be of critical importance, such as a tile from the Orbiter's thermal protection system, and the Mission Control Center asked ''Atlantis'' crew to power up the shuttle's robotic arm ready to reinspect the orbiter, and drew up plans for a series of tests which took place on flight day 12 to determine whether the shuttle was safe for re-entry. This extra inspection, added to poor weather forecasts predicted for the Shuttle Landing Facility for Wednesday, and the de-orbit burn and landing were delayed by a day.


20 September (Flight day 12)

Following the discovery of a co-orbiting object on flight day 11, Flight Controllers spent the early hours of the morning using the Orbiter's robotic arm to inspect the upper surface of ''Atlantis'', with the astronauts on board the Orbiter spending the rest of the morning scanning the underside of the shuttle for any areas of concern. Following these scans, the crew received word from the Mission Control Center in Houston to use the orbiter boom sensor system to conduct more inspections of ''Atlantis heat shield. Following the review of these scans, together with an overnight analysis of the payload bay by Ground Flight Controllers, it was determined that there remained no safety issue with ''Atlantis'', and Mission Controllers cleared the Orbiter for re-entry. This clean bill of health, added to a favorable weather forecast for the Shuttle Landing Facility for Thursday morning, permitted ''Atlantis'' to be cleared for a landing the next day. The crew spent the remainder of the day in preparation for landing, packing up gear and stowing the
Ku band The Ku band () is the portion of the electromagnetic spectrum in the microwave range of frequencies from 12 to 18  gigahertz (GHz). The symbol is short for "K-under" (originally german: Kurz-unten), because it is the lower part of the or ...
antenna used for TV broadcasts. During the inspection, the crew was notified that the
Soyuz TMA-9 Soyuz TMA-9 was a Soyuz mission to the International Space Station (ISS) launched by a Soyuz FG launch vehicle. It was a human spaceflight mission transporting personnel to and from the ISS. It launched from the Baikonur Cosmodrome on 18 September ...
spacecraft was docked with the ISS above, which carried the first half of the
Expedition 14 Expedition 14 was the 14th expedition to the International Space Station (ISS). Commander Michael López-Alegría, and flight engineer Mikhail Tyurin launched from Baikonur Cosmodrome on 18 September 2006, 04:09 UTC, aboard Soyuz TMA-9. They joi ...
crew.


21 September (Flight day 13 and landing)

Flight day 13 was the last day of the mission, with the final re-entry procedures and landing taking place during the morning, and numerous debriefs and conferences in the afternoon. The landing process began hours before the actual landing at Kennedy Space Center. The process began with the APU prestart at 04:37 EDT, followed by the closing of the payload bay doors and sealing of the Orbiter at 04:45 EDT. ''Atlantis'' crew received the final "Go" for the prime re-entry window from Mission Control in Houston at 04:52 EDT. The crew then started the deorbit reorientation of the shuttle so that its engines faced in its direction of travel, meaning that by firing the engines for the deorbit burn ''Atlantis'' would slow down and begin its descent out of orbit. The de-orbit burn was initiated at 05:15 EDT, lasting 2 minutes 40 seconds with two engines burning well throughout. The astronauts aboard the Orbiter were informed at 05:17 EDT that their burn was perfect, with no alterations required as ''Atlantis'' began her drop through the atmosphere above the Indian Ocean. Following the deorbit burn, the crew of ''Atlantis'' began dumping excess propellant overboard, a process lasting 3 minutes, concluding at 05:26 EDT, with the Orbiter 55 minutes away from landing. Twenty-five minutes later, at 05:51 EDT, ''Atlantis'' began feeling the effects of the atmosphere at an altitude of approximately (80 mi), and soon after began its "roll reversal banking" in order to bleed off most of the /h (17,000 mph) she was traveling at, ready for landing at less than /h (470 mph). The ISS was positioned in such a way as to be above the reentry path taken by ''Atlantis'', so the astronauts were able to observe the entire maneuver from above. At 06:08 EDT, the downlink from the Shuttle was acquired by the MILA tracking station on Merritt Island, Florida, with GPS data beginning to be accepted by the Orbiter three minutes later. Ten minutes following the first detection of ''Atlantis'', two
sonic boom A sonic boom is a sound associated with shock waves created when an object travels through the air faster than the speed of sound. Sonic booms generate enormous amounts of sound energy, sounding similar to an explosion or a thunderclap to ...
s were heard at Kennedy Space Center as the Orbiter dropped below the sound barrier three minutes prior to touchdown. Commander Jett took control of ''Atlantis'' a minute later, and, with Kennedy Space Center Runway 33 in sight, began bringing his ship in for a landing. ''Atlantis main gear touched down at 06:21:30 EDT on Runway 33 at the Space Shuttle Landing Facility at Kennedy Space Center, with the nose gear following 6 seconds later at 06:21:36 EDT, and, 8 million kilometers (5 million miles) after launch, the Orbiter's wheels came to a stop at 06:22:16 EDT, bringing mission STS-115 to an end. The morning's landing was considered a night landing as it took place about 48 minutes before sunrise, and as such was the 21st night landing for the Space Shuttle Program. It was the 63rd landing at Kennedy Space Center, as well as the 27th mission for ''Atlantis''.


Post flight

While working on the ''Atlantis'' orbiter, NASA technicians discovered that one of the spacecraft's radiator panels showed evidence of
micrometeorite A micrometeorite is a micrometeoroid that has survived entry through the Earth's atmosphere. Usually found on Earth's surface, micrometeorites differ from meteorites in that they are smaller in size, more abundant, and different in composition. T ...
damage. A hole was observed which was reported to be about 2.7 mm (0.108 in) in diameter.


Debris analysis

NASA's Mission Management Team conducted a detailed analysis of data from many sources including ground imagery, radar, shuttle inspections using the
Canadarm Canadarm or Canadarm1 (officially Shuttle Remote Manipulator System or SRMS, also SSRMS) is a series of robotic arms that were used on the Space Shuttle orbiters to deploy, manoeuvre, and capture payloads. After the Space Shuttle ''Columbia ...
and from the space station. By Day 2 they pinpointed a handful of launch debris events, and drew a preliminary conclusion that the effect was minimal. Later that day, NASA agency engineers decided that additional heat shield inspections were not required. The preceding only relates to debris shed immediately during or after launch, and not the debris observed on 19 September 2006. Not mentioned was a large debris event during launch at 48 seconds near max Q. Because it happened on the ET side opposite the Orbiter, it was never a danger to the Shuttle. By the origin from near the top of the ET, it presents a new source of debris and is therefore of concern for further missions.


Wake-up calls

A tradition for NASA spaceflights since the days of Gemini, mission crews are played a special musical track at the start of each day in space. Each track is specially chosen, often by their family, and usually has special meaning to an individual member of the crew, or is applicable to their daily activities.


Contingency mission

STS-300 was the designation given to the Contingency Shuttle Crew Support mission which would have launched in the event Space Shuttle ''Discovery'' became disabled during
STS-114 STS-114 was the first "Return to Flight" Space Shuttle mission following the Space Shuttle ''Columbia'' disaster. ''Discovery'' launched at 10:39 EDT (14:39 UTC), July 26, 2005. The launch, 907 days (approx. 29 months) after the loss of ''Co ...
or
STS-121 STS-121 was a 2006 NASA Space Shuttle mission to the International Space Station (ISS) flown by . The main purposes of the mission were to test new safety and repair techniques introduced following the ''Columbia'' disaster of February 2003 as w ...
. This rescue mission would have been a modified version of the STS-115 mission with the launch date being brought forward and the crew reduced.
STS-300 would have launched no earlier than 17 August 2006, and the crew for STS-300 would have been a four-person subset of the full STS-115 crew:"STS-121 Nasa Press Kit"
NASA Press Kit – STS-121, May 2006.
* Brent Jett, commander * Christopher Ferguson, pilot and backup
Remote Manipulator System Canadarm or Canadarm1 (officially Shuttle Remote Manipulator System or SRMS, also SSRMS) is a series of robotic arms that were used on the Space Shuttle orbiters to deploy, manoeuvre, and capture payloads. After the Space Shuttle ''Columbia'' ...
(RMS) operator * Joseph Tanner, mission specialist 1, Extravehicular 1 and prime RMS operator * Daniel Burbank, mission specialist 2 and Extravehicular 2


Media

File:ISS P3-P4 Truss unfolding.ogg, The components and the unfolding of the P3/P4 Truss in Detail (Animation). File:STS-115-Launch-September-9-2006.ogv, Space Shuttle ''Atlantis'' launches from launch pad 39B at
Kennedy Space Center The John F. Kennedy Space Center (KSC, originally known as the NASA Launch Operations Center), located on Merritt Island, Florida, is one of the National Aeronautics and Space Administration's (NASA) ten field centers. Since December 196 ...
as part of the STS-115 mission.


See also

*
Outline of space science The following outline is provided as an overview and topical guide to space science: Space science encompasses all of the scientific disciplines that involve space exploration and study natural phenomena and physical bodies occurring in outer ...
*
2006 in spaceflight This article outlines notable events occurring in 2006 in spaceflight, including major launches and EVAs. 2006 saw Brazil, Iran, and Sweden all get a national into space for the first time. Launches , colspan=8, January , - , colsp ...
* List of International Space Station spacewalks * List of Space Shuttle missions * Lists of spacewalks and moonwalks *
List of human spaceflights This is a list of all human spaceflights throughout history. Beginning in 1961 with the flight of Yuri Gagarin aboard Vostok 1, human spaceflight occurs when a human crew flies a spacecraft into outer space. Human spaceflight is distinguish ...


References


External links


STS-115 Official NASA Page







Space-Astronautics.com

Canadian Space Agency: Missions overview, updates, timeline, and gallery

SpaceflightWeb Mission Profile



Videos


Mission Timeline
Canadian Space Agency The Canadian Space Agency (CSA; french: Agence spatiale canadienne, ASC) is the national space agency of Canada, established in 1990 by the ''Canadian Space Agency Act''. The president is Lisa Campbell, who took the position on September 3, 202 ...
: with animations of key parts of the mission
STS-115 Video Highlights
{{DEFAULTSORT:STS-115 Spacecraft launched in 2006 Space Shuttle missions Spacecraft which reentered in 2006 Articles containing video clips