R211 (New York City Subway car)
   HOME

TheInfoList



OR:

The R211 is a new technology train (NTT)
New York City Subway The New York City Subway is a rapid transit system owned by the government of New York City and leased to the New York City Transit Authority, an affiliate agency of the state-run Metropolitan Transportation Authority (MTA). Opened on October ...
car being built by
Kawasaki Heavy Industries (or simply Kawasaki) is a Japanese Public company, public multinational corporation manufacturer of motorcycles, engines, Heavy equipment (construction), heavy equipment, aerospace and Military, defense equipment, rolling stock and ships, headq ...
for the
B Division B Division, Division B, or variant may refer to: * ''B Division'' (New York City Subway) * ''B Division'' (Irish League), association football * ''Division B'' (Scottish Football League) * ''Divizia B'' (Romanian Football League) * Moldovan "B ...
and the
Staten Island Railway The Staten Island Railway (SIR) is a rapid transit line in the New York City borough of Staten Island. It is owned by the Staten Island Rapid Transit Operating Authority (SIRTOA), a subsidiary of the Metropolitan Transportation Authority, ...
(SIR). They will replace two aging subway car models: all R44 cars on the
Staten Island Railway The Staten Island Railway (SIR) is a rapid transit line in the New York City borough of Staten Island. It is owned by the Staten Island Rapid Transit Operating Authority (SIRTOA), a subsidiary of the Metropolitan Transportation Authority, ...
and all R46 subway cars. The order is split into three parts: R211A and R211T cars for the subway and R211S cars for the SIR. The R211Ts employ open gangways between cars, a feature not present on current
rolling stock The term rolling stock in the rail transport industry refers to railway vehicles, including both powered and unpowered vehicles: for example, locomotives, freight and passenger cars (or coaches), and non-revenue cars. Passenger vehicles ca ...
. The base order consists of 535 cars, with options for up to 1,077 additional cars. Planning for the R211 order started in 2011. The design process started in 2012, at which time the order was supposed to consist of cars. The cars' lengths were changed to by 2015, and the first request for proposals was solicited in July 2016. After several changes to the proposal, the
Metropolitan Transportation Authority The Metropolitan Transportation Authority (MTA) is a public benefit corporation responsible for public transportation in the New York City metropolitan area of the U.S. state of New York. The MTA is the largest public transit authority in th ...
(MTA) awarded a contract to Kawasaki in January 2018. Delivery of the pilot cars began at the end of June 2021. They contain new features such as wider doors, information displays, Wi-Fi, LED-lit doorways, open gangways, and LED interior lighting.


Component orders

With all options exercised, the
Metropolitan Transportation Authority The Metropolitan Transportation Authority (MTA) is a public benefit corporation responsible for public transportation in the New York City metropolitan area of the U.S. state of New York. The MTA is the largest public transit authority in th ...
(MTA) plans to spend $3.686 billion in the order. The contract is split into three parts: R211A, R211S, and R211T. The majority of the 535-car base order will comprise 440 R211A cars that will partially replace the aging 748-car R46 fleet. There will also be 20 R211T open gangway prototype cars, and 75 R211S cars which are expected to replace the remaining 61-car R44 fleet on the
Staten Island Railway The Staten Island Railway (SIR) is a rapid transit line in the New York City borough of Staten Island. It is owned by the Staten Island Rapid Transit Operating Authority (SIRTOA), a subsidiary of the Metropolitan Transportation Authority, ...
. The R44s and R46s are long, and the R211s are only . As a result, the 752 R46s would need to be replaced by 940 R211s. There will be two options for additional cars: the first for 640 R211A cars and the second for 437 R211A or R211T cars. Both options are designed to accommodate either standard cars or open gangway cars, depending on the test results from the 20 pilot cars. If all options are exercised, the order would total 1,612 cars. Any additional cars that do not replace existing rolling stock will be used to expand the system's fleet. The R211 order would provide 1,015 new cars to replace existing fleet, as well as up to 597 cars for fleet expansions following the extension of the
Second Avenue Subway The Second Avenue Subway (internally referred to as the IND Second Avenue Line by the MTA and abbreviated to SAS) is a New York City Subway line that runs under Second Avenue on the East Side of Manhattan. The first phase of this new line, ...
and the
automation of the New York City Subway Most trains on the New York City Subway are manually operated. , the system currently uses Automatic Block Signaling, with fixed wayside signals and automatic train stops. Many portions of the signaling system were installed between the 1930s a ...
. The R211Ts would also increase capacity and allow passengers to walk seamlessly from one car to the next.


Features

The doors on the R211s are wide, compared to current MTA standard of , thereby projected to reduce station dwell time by 25 to 30 percent. This door width will also promote
accessibility Accessibility is the design of products, devices, services, vehicles, or environments so as to be usable by people with disabilities. The concept of accessible design and practice of accessible development ensures both "direct access" (i. ...
on the cars, making them the first fully accessible subway car in New York City. This design change partially incorporates a design feature of the R110A prototype subway cars, which had doors that are wide. The new cars have
Wi-Fi Wi-Fi () is a family of wireless network protocols, based on the IEEE 802.11 family of standards, which are commonly used for local area networking of devices and Internet access, allowing nearby digital devices to exchange data by radio waves ...
installed, USB chargers, digital
advertisement Advertising is the practice and techniques employed to bring attention to a product or service. Advertising aims to put a product or service in the spotlight in hopes of drawing it attention from consumers. It is typically used to promote a ...
s, digital customer information displays, illuminated door opening alerts, and
security cameras Closed-circuit television (CCTV), also known as video surveillance, is the use of video cameras to transmit a signal to a specific place, on a limited set of monitors. It differs from broadcast television in that the signal is not openly tr ...
, unlike the current New Technology Trains, which lack these features. Each car contains an on-board computer system that could detect breakdowns in critical systems such as braking and door-opening. It was announced in July 2016 that some of the cars would have open gangways that allowed passengers to move between cars during train movement. To test out the curve radius and gangway flex in the existing 60-foot-long cars, an R143 test train was equipped with measuring gauges and was operated on most parts of the B Division. Compared to previous New Tech train orders, the R211s have seen vast changes. On the exterior, the subway cars have a blue front with large windows, LED headlights, and a blue strip with gold accents on the sides, similar to the new MTA Regional Bus Operations livery released in 2016. To designate the route, a large LED screen with the route bullet is displayed at the ends of the train, a feature similar to trains with rollsigns ( R40 to R68A). The route's destination is displayed above the door on the front, similar to the overhead rollsign arrangement last used on the R38 order from 1966, which displayed both the route and destination. On the sides, there is a screen that displays both the route bullet and the route's destination, also similar to rollsign-equipped trains. There are also several changes in interior appearance. Updated FIND displays are installed over doors. The seating on the inside is blue and gold, and flip seats are installed to allow for space for wheelchairs. There are also looped stanchions, a feature found in some R46, R62A, and R160 cars, as well as on all R179 cars. As part of an action plan to fix the subway's state of emergency of 2017, many of the R211's features were implemented on several R160s assigned to the E, F, and L routes. In addition to various screens throughout the train, touch screen displays are present throughout the subway cars, allowing people to zoom in and out of the map. All R211A and R211T cars are equipped for
communications-based train control Communications-based train control (CBTC) is a railway signaling system that uses telecommunications between the train and track equipment for traffic management and infrastructure control. CBTC allows a train's position to be known more accurat ...
(CBTC) in conjunction with the ongoing automation of B Division lines. All R211S cars are equipped with cab signaling.


History


Initial request for proposals

The R211 Design Master Plan was approved by the MTA in December 2011, and design planning began in December 2012. An R211 solicitation was posted in the classified section of '' Metro Magazines May 9, 2013, issue, stating the proposal to acquire these cars in the near future. At the time, the order was planned to be in length, the same length as the R46 cars. Open-gangways, which would allow passengers to seamlessly walk throughout the train or units, and other alternate configurations were also initially considered for the entire order. By the release of the MTA's 2015-2019 Capital Program in October 2015, the order specified cars, which has been the standard length of new B Division cars since the R143 order. , open-gangways will be tested on ten cars (now designated as the R211T). Additionally, the order was broken up into a base order of 565 R211A cars and two option orders: the first for 375 R211A cars, and a second for up to 520 R211As. The Request for Proposal (RFP) was issued on July 22, 2016, and the contract was to be put out for bidding. With the RFP, the breakup of the order was changed. The base order consisted of 285 cars, with 10 R211T cars, 75 R211S cars, and 200 R211A cars. There were still two option orders; the first option order contained 740 cars (either R211As or R211Ts, depending on the success of the R211Ts in the base order), and the second base order contained 520 cars. The RFP closed in December 2016, and the contract was expected to be awarded in early 2017, at which time the existing R46 fleet would be 42 years old, making the oldest cars years old, in . However, in January 2017, the contract was pushed back to mid-2017. On April 24, 2017, at the New York City Transit Board Meeting, the breakdown of the order was changed once again. The base order now includes 535 cars (an increase of 250 cars), with 10 R211T cars, 75 R211S cars, and 450 R211A cars. The option order now consisted of between 490 and 640 R211T cars. This change was made to allow for faster deliveries of the R211 cars. The R211As, with their standard configuration, would be delivered in 2021, earlier than the open-gangway R211T cars, which would not be delivered until at least 2023.


Contract


Creation of mockup and contract award

In May 2017, the MTA quietly built a mockup of the R211 in a sparsely-used section of the 34th Street–Hudson Yards station's mezzanine, hidden behind a construction wall. The ''
New York Daily News The New York ''Daily News'', officially titled the ''Daily News'', is an American newspaper based in Jersey City, NJ. It was founded in 1919 by Joseph Medill Patterson as the ''Illustrated Daily News''. It was the first U.S. daily printed in ...
'' first reported on the mockup's existence in September of that year. The mockup contains features such as the open-gangway designs, digital screens showing next stops and their station layouts, multicolor lights next to the doors to indicate which set of doors will open, and a blue-and-gold-stripe paint design on its exterior. The model was completed and was made publicly accessible from November 30 to December 6, 2017, so riders could review it. In August 2017,
Bombardier Transportation Bombardier Transportation was a Canadian-German rolling stock and rail transport manufacturer, headquartered in Berlin, Germany. It was one of the world's largest companies in the rail vehicle and equipment manufacturing and servicing industry ...
, who was manufacturing the R179s at the time, was banned from bidding on the R211 contract due to various delays and problems associated with the R179 contract. Shortly afterward, it was reported that
CRRC CRRC Corporation Limited (known as CRRC) is a Chinese state-owned and publicly traded rolling stock manufacturer. It is the world's largest rolling stock manufacturer in terms of revenue, eclipsing its major competitors of Alstom and Siemens. I ...
had also opted out of contention for the R211 contract, leaving
Kawasaki Heavy Industries (or simply Kawasaki) is a Japanese Public company, public multinational corporation manufacturer of motorcycles, engines, Heavy equipment (construction), heavy equipment, aerospace and Military, defense equipment, rolling stock and ships, headq ...
and
Alstom Transport Alstom SA is a French multinational rolling stock manufacturer operating worldwide in rail transport markets, active in the fields of passenger transportation, signalling, and locomotives, with products including the AGV, TGV, Eurostar, Aveli ...
as two of the likely bidders for the contract. On January 19, 2018, the MTA Board suggested that Kawasaki Rail Car, Inc, a subsidiary of
Kawasaki Heavy Industries (or simply Kawasaki) is a Japanese Public company, public multinational corporation manufacturer of motorcycles, engines, Heavy equipment (construction), heavy equipment, aerospace and Military, defense equipment, rolling stock and ships, headq ...
of Kobe, Japan, be awarded the $1.4 billion base order for the first 535 new R211 cars. The cars are anticipated to be delivered from 2020 to 2023, with the option orders to be delivered by 2025. The R211 base order includes 20 R211T cars with open gangways; 75 R211S cars for the Staten Island Railway, to be delivered near the end of the base order; and 440 R211A cars similar to the R143/R160 series. All cars in the base order will operate in five-car units. The first test train was then expected to be delivered in July 2020, with the production cars being delivered between 2021 and 2023. The cars are being assembled at Kawasaki's factories in the U.S. at
Lincoln, Nebraska Lincoln is the capital city of the U.S. state of Nebraska and the county seat of Lancaster County. The city covers with a population of 292,657 in 2021. It is the second-most populous city in Nebraska and the 73rd-largest in the United ...
, and
Yonkers, New York Yonkers () is a city in Westchester County, New York, United States. Developed along the Hudson River, it is the third most populous city in the state of New York, after New York City and Buffalo. The population of Yonkers was 211,569 as en ...
, as well as in Japan at
Kobe Kobe ( , ; officially , ) is the capital city of Hyōgo Prefecture Japan. With a population around 1.5 million, Kobe is Japan's seventh-largest city and the third-largest port city after Tokyo and Yokohama. It is located in Kansai region, whi ...
,
Hyōgo Prefecture is a prefecture of Japan located in the Kansai region of Honshu. Hyōgo Prefecture has a population of 5,469,762 () and has a geographic area of . Hyōgo Prefecture borders Kyoto Prefecture to the east, Osaka Prefecture to the southeast, an ...
.


Option orders

In October 2018, it was confirmed that the second option order would consist of 89 sets, and in September 2019, it was confirmed that the 89 sets would be formed from 437 cars. The MTA also confirmed in September 2019 that the first option order would also consist of 640 cars. The entire order will consist of 1,612 cars with both options exercised. The delivery of the base order is scheduled to be completed by August 2023, with option 1 and option 2 completed by December 2024 and October 2025 respectively. In October 2022, the MTA Board voted to exercise the first option order for 640 cars at a cost of US $1.7 billion. All cars in the first option order would be R211A cars. The cars in the option order would be delivered from February 2025 to December 2026.


Delivery


Delays in delivery

By January 2019, the first R211A train was scheduled to be delivered in July 2020, but was delayed to January 2021. Thereafter, new R211 cars would have been produced and delivered at a rate of 30 to 40 cars per month. The first two test trains of ten R211T open-gangway cars would have been delivered in May 2021, followed by the first 5-car set of R211S cars for the Staten Island Railway in December 2021. Under the schedule outlined in January 2019, the base order of R211 cars would begin delivery in October 2021 and continue to be delivered through mid-2023. If the two option orders of 1,077 cars were exercised, deliveries would have continued through late 2025. A decision on whether to make the first option order as open-gangway or standard trainsets was needed to be decided by late 2022; by late October 2022, the first option order was confirmed to comprise standard trainsets. It was also announced in January 2019 that Kawasaki had made a full-car mock-up of the R211 fleet. In late November 2020, the MTA announced that delivery of the first cars was delayed to the first quarter of 2021. The onset of the
COVID-19 pandemic The COVID-19 pandemic, also known as the coronavirus pandemic, is an ongoing global pandemic of coronavirus disease 2019 (COVID-19) caused by severe acute respiratory syndrome coronavirus 2 (SARS-CoV-2). The novel virus was first identi ...
had impacted global supply chains and the delivery of the first cars was delayed by between 9 and 14 months. By January 2021, the first cars were scheduled to arrive in April. The R211T open-gangway test trains were delayed to April 2022, while the R211S Staten Island Railway test train was delayed to August 2022. Deliveries of the base order of R211As were scheduled for September 2022 to September 2024, while deliveries of the R211S cars were scheduled for October 2023 to June 2024. Kawasaki planned to deliver 22 cars per month, a rate that an independent engineering consultant for the MTA described as "aggressive". In late March 2021, TV station
NY1 NY1 (also officially known as Spectrum News NY1 and spoken as New York One) is an American cable news television channel founded by Time Warner Cable, which itself is owned by Charter Communications through its acquisition in May 2016. The channe ...
reported that delivery of the first cars had slipped further, with the arrival of the first cars delayed to June 2021. At its June 2021 meeting, the MTA's Capital Program Oversight Committee announced the R211A pilot had been delayed to July 2021 and the R211T test train had been delayed to June 2022. The production of the R211A base order, the R211S test train, and the rest of the R211S order had the same timeline as was outlined in January 2021. Some of the other issues with the test train, such as cracks in the HVAC frame, had been identified in previous months and fixed. The base order of R211As had to be underway by November 2023 so there would be enough cars to test a
communications-based train control Communications-based train control (CBTC) is a railway signaling system that uses telecommunications between the train and track equipment for traffic management and infrastructure control. CBTC allows a train's position to be known more accurat ...
(CBTC) system being installed on the
IND Eighth Avenue Line The IND Eighth Avenue Line is a rapid transit line in New York City, United States, and is part of the B Division of the New York City Subway. Opened in 1932, it was the first line of the Independent Subway System (IND), and the ''Eighth Avenu ...
. By July 2022, full delivery of the R211A base order and the R211S order had been delayed to 2025 due to labor issues at Kawasaki's Nebraska factory. Kawasaki was obligated to construct 40 cars per month in Nebraska as part of its contract with the MTA.


Delivery

Starting on June 29, 2021, the first set of R211As (4060–4064) was delivered to the
New York City Transit Authority The New York City Transit Authority (also known as NYCTA, the TA, or simply Transit, and branded as MTA New York City Transit) is a New York state public-benefit corporations, public-benefit corporation in the U.S. state of New York (state), New ...
. The next five cars (4065–4069) were delivered starting on July 12, 2021, forming a complete pilot ten-car train for acceptance testing and evaluation. The test train was delivered despite a lack of staff in Nebraska and a shortage of important parts, which prompted an independent engineering consultant to predict that delivery of the test train could be delayed past July 2021. The pilot train was prepared at
Coney Island Yard The New York City Transit Authority operates a total of 24 rail yards for the New York City Subway system, and one for the Staten Island Railway. There are 10 active A Division yards and 11 active B Division yards, two of which are shared betwe ...
for several weeks before being tested without passengers starting in August 2021. Passenger service for the pilot train is expected to begin by spring 2023. The first of the R211Ts were delivered on October 31, 2022.


Notes


References


External links


MTA Capital Program 2015-2019 (page 15)

R211 digital mock (page 18)

R211 Design Concepts

Contract proposal as of March 18, 2016

RFP Addendums

R211 Contract

R211 Technical Specifications
{{NYCS rolling stock New York City Subway rolling stock Kawasaki multiple units