Phénix (French for phoenix) was a small-scale (gross 264/net 233 MWe) prototype
fast breeder reactor A breeder reactor is a nuclear reactor that generates more fissile material than it consumes. Breeder reactors achieve this because their neutron economy is high enough to create more fissile fuel than they use, by irradiation of a fertile mater ...
, located at the
Marcoule Marcoule Nuclear Site (french: Site nucléaire de Marcoule) is a nuclear facility in the Chusclan and Codolet communes, near Bagnols-sur-Cèze in the Gard department of France, which is in the tourist, wine and agricultural Côtes-du-Rhône r ...
nuclear site, near
Orange, France Orange (; Provençal: ''Aurenja'' or ''Aurenjo'' ) is a commune in the Vaucluse department in the Provence-Alpes-Côte d'Azur region in southeastern France. It is about north of Avignon, on the departmental border with Gard, which follows t ...
. It was a pool-type liquid-metal fast breeder reactor cooled with liquid
sodium Sodium is a chemical element with the symbol Na (from Latin ''natrium'') and atomic number 11. It is a soft, silvery-white, highly reactive metal. Sodium is an alkali metal, being in group 1 of the periodic table. Its only stable ...
. It generated 590 MW of thermal power, and had a breeding ratio of 1.16 (16% more
plutonium Plutonium is a radioactive chemical element with the symbol Pu and atomic number 94. It is an actinide metal of silvery-gray appearance that tarnishes when exposed to air, and forms a dull coating when oxidized. The element normally exh ...
produced than consumed), but normally had to be stopped for refueling operations every two months. Phénix continued operating after the closure of the subsequent full-scale prototype
Superphénix Superphénix ( en, Superphoenix) or SPX was a nuclear power station prototype on the Rhône river at Creys-Malville in France, close to the border with Switzerland. Superphénix was a 1,242 MWe fast breeder reactor with the twin goals of reproc ...
in 1997. After 2004, its main use was investigation of transmutation of
nuclear waste Radioactive waste is a type of hazardous waste that contains radioactive material. Radioactive waste is a result of many activities, including nuclear medicine, nuclear research, nuclear power generation, rare-earth mining, and nuclear weapons ...
while also generating some electricity. Phénix was shut down in 2009. Construction of Phénix began in November 1968. The first connection to the French national electricity grid was in December 1973. Plans for a French fast reactor date as far back as 1958's ''
Rapsodie Rapsodie was an experimental nuclear reactor built in Cadarache in France. It was France's first fast reactor, and first achieved criticality in 1967. Rapsodie was a sodium-cooled fast neutron loop-type reactor with a thermal output of 40MW an ...
'', and followed up in 1964 for a larger design with a power output of 1 GWe. Construction of the Rapsodie facility started in 1962 and went critical on 28 January 1967. It did not have power producing systems, but its 22 MW of thermal output (MWth) would translate to perhaps 9 MW of electrical output (MWe). Experiments on core configurations were carried out in the ''Masurca'' facility starting in 1966, and design of a larger power-producing facility was already well underway. During the 1960s, interest in
nuclear power Nuclear power is the use of nuclear reactions to produce electricity. Nuclear power can be obtained from nuclear fission, nuclear decay and nuclear fusion reactions. Presently, the vast majority of electricity from nuclear power is produced b ...
was reaching a crescendo. For France, with little
uranium Uranium is a chemical element with the symbol U and atomic number 92. It is a silvery-grey metal in the actinide series of the periodic table. A uranium atom has 92 protons and 92 electrons, of which 6 are valence electrons. Uranium is weak ...
supply of their own, large scale generation would be subject to supply constraints, especially given that nuclear power was experiencing a boom in construction that suggested the available supply would be limited even on a worldwide basis. In France's plans, breeders would serve the twin purposes of producing fuel for their conventional
light water reactor The light-water reactor (LWR) is a type of thermal-neutron reactor that uses normal water, as opposed to heavy water, as both its coolant and neutron moderator; furthermore a solid form of fissile elements is used as fuel. Thermal-neutron react ...
fleet, as well as producing that fuel from the waste fuel from those reactors, thereby reducing the amount of
nuclear waste Radioactive waste is a type of hazardous waste that contains radioactive material. Radioactive waste is a result of many activities, including nuclear medicine, nuclear research, nuclear power generation, rare-earth mining, and nuclear weapons ...
they would have to dispose of. Only a small number of breeders, estimated to be around 20, would be required to fuel the fleet of about 200 light water reactors. France began construction of the Phénix demonstration plant in November 1968, only a year after Rapsodie went critical. It was fueled with 931 kg of highly enriched plutonium, around 77% Pu-239. The fuel load is capable of running for about 90 days maximum, but in practice it normally ran for two month periods. Due to its design, refueling required the reactor to be shut down. As a result, it had a low
capacity factor The net capacity factor is the unitless ratio of actual electrical energy output over a given period of time to the theoretical maximum electrical energy output over that period. The theoretical maximum energy output of a given installation is def ...
(CF), on the order of 65%. As a prototype plant, a high CF was not a design goal, although any practical design would have to improve this. Phénix demonstrated a breeding ratio of 1.16, meaning it produced 16% more fuel than it consumed, while also producing 233 MWe in normal operation. Phénix ran without problems through the 1970s and '80s, but in the early 1990s it began to demonstrate a number of unexplained behaviours, including large power transients. This had serious safety implications, and the reactor was repeatedly shut down, spending most of the period from 1991 to 1994 being studied while offline. The long offline period required it to be recertified, so the plant also underwent a significant refurbishment between 1994 and 2002. It was finally recertified in June 2003, but only at a reduced power of 130 MWe.


See also

*
Superphénix Superphénix ( en, Superphoenix) or SPX was a nuclear power station prototype on the Rhône river at Creys-Malville in France, close to the border with Switzerland. Superphénix was a 1,242 MWe fast breeder reactor with the twin goals of reproc ...
, the main reactor for which this was the demonstration