Northern Hub
   HOME

TheInfoList



OR:

The Northern Hub was a rail upgrade programme between 2009 and 2020 in
Northern England Northern England, also known as the North of England, the North Country, or simply the North, is the northern area of England. It broadly corresponds to the former borders of Angles, Angle Northumbria, the Anglo-Scandinavian Scandinavian York, K ...
to improve and increase train services and reduce journey times between its major cities and towns, by electrifying lines and removing a major rail bottleneck in
Manchester Manchester () is a city in Greater Manchester, England. It had a population of 552,000 in 2021. It is bordered by the Cheshire Plain to the south, the Pennines to the north and east, and the neighbouring city of Salford to the west. The ...
. It was predicted to stimulate economic growth in the region. The project has several elements but the prime objective is to eradicate the bottleneck in Manchester and allow trains to travel through the city at speed without stopping. The project was announced as the Manchester Hub in 2009. The project's steering partnership involves
Network Rail Network Rail Limited is the owner (via its subsidiary Network Rail Infrastructure Limited, which was known as Railtrack plc before 2002) and infrastructure manager of most of the railway network in Great Britain. Network Rail is an "arm's len ...
,
Deutsche Bahn The (; abbreviated as DB or DB AG) is the national railway company of Germany. Headquartered in the Bahntower in Berlin, it is a joint-stock company ( AG). The Federal Republic of Germany is its single shareholder. describes itself as the ...
,
First TransPennine Express First TransPennine Express was a British train operating company jointly owned by FirstGroup and Keolis which operated the TransPennine Express franchise. First TransPennine Express ran regular Express regional railway services between the major ...
, Northern Rail,
East Midlands Trains East Midlands Trains (EMT) was a British train operating company owned by the transport group Stagecoach, which operated the East Midlands franchise between November 2007 and August 2019. Following the Department for Transport (DfT) award of ...
,
CrossCountry CrossCountry (legal name XC Trains Limited) is a train operating company in the United Kingdom owned by Arriva UK Trains, operating the Cross Country franchise. The CrossCountry franchise was restructured by the Department for Transport (DfT ...
, Freightliner, the
Department for Transport The Department for Transport (DfT) is a department of His Majesty's Government responsible for the English transport network and a limited number of transport matters in Scotland, Wales and Northern Ireland that have not been devolved. The ...
,
Transport for Greater Manchester Transport for Greater Manchester (TfGM) is the public body responsible for co-ordinating transport services throughout Greater Manchester in North West England. TfGM is responsible for investments in improving transport services and facilitie ...
and
Merseytravel Merseytravel is the passenger transport executive, responsible for the coordination of public transport in the Liverpool City Region in North West England. Merseytravel was established on 1 December 1969 as the Merseyside Passenger Transpor ...
. Services from
Liverpool Liverpool is a City status in the United Kingdom, city and metropolitan borough in Merseyside, England. With a population of in 2019, it is the List of English districts by population, 10th largest English district by population and its E ...
to
Leeds Leeds () is a city and the administrative centre of the City of Leeds district in West Yorkshire, England. It is built around the River Aire and is in the eastern foothills of the Pennines. It is also the third-largest settlement (by popul ...
and beyond will be diverted from the Liverpool to Manchester line southern route, via Warrington Central and
Manchester Piccadilly Manchester Piccadilly is the principal railway station in Manchester, England. Opened as Store Street in 1842, it was renamed Manchester London Road in 1847 and became Manchester Piccadilly in 1960. Located to the south-east of Manchester city ...
, to the more direct electrified Liverpool to Manchester northern route, via Newton-le-Willows and Manchester Victoria; this will provide a fast route to and through Manchester. The construction of two through platforms at Manchester Piccadilly will allow 4 more trains per hour through the station. The refurbishment of Manchester Victoria station was completed in October 2015, so it can become an east-west rail interchange and through station between Liverpool and Leeds. Trains from North-East England to
Manchester Airport Manchester Airport is an international airport in Ringway, Manchester, England, south-west of Manchester city centre. In 2019, it was the third busiest airport in the United Kingdom in terms of passenger numbers and the busiest of those ...
will use the £85 million
Ordsall Chord Ordsall Chord, also known as the Castlefield Curve, is a short railway line in Ordsall, Salford, England, which links and Manchester Oxford Road to , designed to increase capacity and reduce journey times into and through Manchester. It allow ...
, between Manchester Victoria and
Manchester Oxford Road Manchester Oxford Road railway station is a railway station in Manchester, England, at the junction of Whitworth Street West and Oxford Street. It opened in 1849 and was rebuilt in 1960. It is the second busiest of the four stations in Manch ...
, to access Piccadilly and will continue to the airport without reversing at Piccadilly. The Manchester Hub Study, outlining the project, was released by Network Rail in February 2010. Costs were estimated at £530 million, subsequently reassessed to £560 million. Chancellor
George Osborne George Gideon Oliver Osborne (born Gideon Oliver Osborne; 23 May 1971) is a former British politician and newspaper editor who served as Chancellor of the Exchequer from 2010 to 2016 and as First Secretary of State from 2015 to 2016 in the ...
approved expenditure of £85 million for the Ordsall Chord in his budget on 23 March 2011 and other aspects of the scheme were reviewed to ensure best value. A further £130 million was committed in Osborne's budget of March 2012 and approval for the full scheme was confirmed by the government on 16 July 2012. The first train ran on the chord on 10 December 2017 and the project was completed by 2018. Support for the scheme has been vociferous from civic and business leaders, due to the high benefit-to-cost ratio, and from politicians, such as George Osborne; but has also been criticised for being incremental and only improving the rail network in Northern England to "where it should have been a decade ago". The scheme has a benefit-to-cost ratio (BCR) of £4 for every £1 invested - double that of
Crossrail Crossrail is a railway construction project mainly in central London. Its aim is to provide a high-frequency hybrid commuter rail and rapid transit system crossing the capital from suburbs on the west to east, by connecting two major railway l ...
in London and the proposed
High Speed 2 High Speed 2 (HS2) is a planned high-speed railway line in England, the first phase of which is under construction in stages and due for completion between 2029 and 2033, depending on approval for later stages. The new line will run from its m ...
project which have BCRs of £2.10 and £2.30 respectively. The Northern Hub project was completed in 2020 after the modernisation of Manchester Victoria station, completion of the Ordsall Chord, platform expansion at Manchester Airport and introduction of 138 new purpose-built trains for Northern and TransPennine Express. It has been superseded by the Great North Rail Project. Further projects may include
High Speed 3 Northern Powerhouse Rail (NPR), sometimes referred to unofficially as High Speed 3, is a proposed major rail programme designed to substantially enhance the economic potential of the North of England. The phrase was adopted in 2014 for a project ...
which proposes an upgraded trans-Pennine railway line to link with the HS2 line to London, and a new Liverpool-Manchester Airport-Manchester railway line also linked to HS2. A feasibility study of the west to east rail line and its branches into HS2 will be published in March 2016.


Background

The Northern Hub was proposed in February 2010 to resolve problems around Manchester city centre that restricted route capacity and caused delays. *Terminating trains in through platforms at Victoria station removed capacity for through trains. The problem could have been mitigated by an additional terminating platform west of the station but operational efficiencies were achieved by altering route paths to relieve congestion. *Congestion at Piccadilly was caused by trains having to reverse to travel to
Manchester Airport Manchester Airport is an international airport in Ringway, Manchester, England, south-west of Manchester city centre. In 2019, it was the third busiest airport in the United Kingdom in terms of passenger numbers and the busiest of those ...
and trains between
Liverpool Liverpool is a City status in the United Kingdom, city and metropolitan borough in Merseyside, England. With a population of in 2019, it is the List of English districts by population, 10th largest English district by population and its E ...
and
Yorkshire Yorkshire ( ; abbreviated Yorks), formally known as the County of York, is a Historic counties of England, historic county in northern England and by far the largest in the United Kingdom. Because of its large area in comparison with other Eng ...
or the
East Midlands The East Midlands is one of nine official regions of England at the first level of ITL for statistical purposes. It comprises the eastern half of the area traditionally known as the Midlands. It consists of Leicestershire, Derbyshire, L ...
had to switch lines across the throat of the station blocking all other services. *Freight trains pass through Manchester city centre, unusual for a city centre rail network. Two freight trains per hour pass through Manchester to
Trafford Park Trafford Park is an area of the Metropolitan Borough of Trafford, Greater Manchester, England, opposite Salford Quays on the southern side of the Manchester Ship Canal, southwest of Manchester city centre and north of Stretford. Until the l ...
and no alternative route exists. Freight trains using passenger routes through Manchester was raised in Parliament in 2002. Network Rail concluded that no single intervention would unlock the bottlenecks but that greater efficiency and enhancement to services was possible. A proposal to use Piccadilly primarily for north-south services and Victoria for east-west services was agreed as the most effective course of action. The re-alignment of services commenced in May 2014 when
First TransPennine Express First TransPennine Express was a British train operating company jointly owned by FirstGroup and Keolis which operated the TransPennine Express franchise. First TransPennine Express ran regular Express regional railway services between the major ...
services between
Liverpool Liverpool is a City status in the United Kingdom, city and metropolitan borough in Merseyside, England. With a population of in 2019, it is the List of English districts by population, 10th largest English district by population and its E ...
and Newcastle were routed through Manchester Victoria rather than Piccadilly. It is expected most
TransPennine Express TransPennine Express (TPE), legally First TransPennine Express Limited, is a British train operating company owned by FirstGroup that operates the TransPennine Express franchise. It runs regional and inter-city rail services between the major ci ...
services will pass through Victoria after the May 2018 timetable change after the opening of the Ordsall Chord in December 2017.


Station improvements

Major stations will be improved to include new platforms, station layout re-configuration and redevelopment. Most improvements will be in Manchester aimed at alleviating bottlenecks that delay passing services and restricts routes.


Manchester

Victoria station will be re-configured as the Northern England hub for east-west rail services. Once voted the worst station in the United Kingdom, it has received a £44 million transformation including a £20 million roof covering the concourse and four platforms. Piccadilly's through platforms, 13 and 14, will be modernised and two through platforms, 15 and 16, will be built over Fairfield Street to alleviate congestion. Oxford Road's platforms will be lengthened and a footbridge will be built. The Grade II listed timber grid-shell roof will be incorporated into the new station design. The surrounding site could be redeveloped with office, residential and leisure space. Salford Crescent station will be redeveloped at a cost of £12 million and further development could occur should extra capacity be required. At
Manchester Airport station Manchester Airport station is a railway, tram, bus and coach station at Manchester Airport, England which opened at the same time as the second air terminal in 1993. The station is south of Manchester Piccadilly, at the end of a short branch f ...
a new platform will be built creating extra capacity and access for direct services from other cities in Northern England. Construction of the platform began in February 2014.
Huyton Huyton ( ) is a town in the Metropolitan Borough of Knowsley, Merseyside, England. Part of the Liverpool Urban Area, it borders the Liverpool suburbs of Dovecot, Knotty Ash and Belle Vale, and the neighbouring village of Roby, with which ...
and Roby stations will have two new tracks through the stations to allow faster trains to pass and provide two additional platforms. Burnley Manchester Road station will receive a £2.3 million upgrade before the reinstatement of a direct rail service to Victoria via the re-opened Todmorden Curve in 2015.
Dore and Totley railway station Dore & Totley railway station serves the south-western Sheffield suburbs of Dore and Totley in South Yorkshire, England south of . The station is served by the Northern service between Sheffield and Manchester, East Midlands Railway servic ...
will get a second platform and a footbridge for access. The single track will be doubled.


Leeds

At Leeds Station two platforms will be built at a cost of £13.6 million to alleviate congestion.


Infrastructure

Northern Hub plans include: *Piccadilly and Victoria stations linked by the
Ordsall Chord Ordsall Chord, also known as the Castlefield Curve, is a short railway line in Ordsall, Salford, England, which links and Manchester Oxford Road to , designed to increase capacity and reduce journey times into and through Manchester. It allow ...
*Station improvements completed at Victoria which was rated as the worst station in the United Kingdom in 2009. *New platforms at Piccadilly for trains from/to Oxford Road, enabling traffic from the north and west to access the south side. *Passing loop between Roby and Huyton on the line from Liverpool to Manchester via Newton-le-Willows, *Extra capacity on routes through the
Pennines The Pennines (), also known as the Pennine Chain or Pennine Hills, are a range of uplands running between three regions of Northern England: North West England on the west, North East England and Yorkshire and the Humber on the east. Common ...
between Leeds,
Huddersfield Huddersfield is a market town in the Kirklees district in West Yorkshire, England. It is the administrative centre and largest settlement in the Kirklees district. The town is in the foothills of the Pennines. The River Holme's confluence i ...
,
Dewsbury Dewsbury is a minster and market town in the Metropolitan Borough of Kirklees in West Yorkshire, England. It lies on the River Calder and on an arm of the Calder and Hebble Navigation waterway. It is to the west of Wakefield, east of Hudd ...
and Manchester *Passing loops at Chinley, Grindleford and Dore between Sheffield and Manchester


Electrification

Electrification for rail lines out of Manchester is underway or has been approved. While independent of the Northern Hub scheme, they complement it. * Electrification of the
Manchester to Liverpool line Manchester () is a city in Greater Manchester, England. It had a population of 552,000 in 2021. It is bordered by the Cheshire Plain to the south, the Pennines to the north and east, and the neighbouring city of Salford to the west. The two ...
was announced by the Department for Transport in July 2009. The section from Manchester to Newton-le-Willows was completed in December 2013 and the section to Liverpool should have been completed by December 2014.North West Electrification
Network Rail. Accessed 16 July 2012
The 32-mile line between Liverpool Lime Street and Manchester Victoria via Huyton and Newton Le-Willows has a maximum speed limit of 75 mph. Following electrification and the introduction of Class 319 stock, trains will reach 90 mph cutting journey times from 47 to 32 minutes. The Manchester to Newton-le-Willows section was completed on 17 July 2013, it was marked by
ceremony
at Eccles station at which the Secretary of State for Transport, Rt. Hon. Patrick McLoughlin MP, was present. Electrified Manchester to Edinburgh and Glasgow services have been running since the timetable change in December 2013. Due to delays the target date for completion of the section from Earlestown to Liverpool was missed but electric train services between Liverpool and Manchester Airport commenced in March 2015. * The Liverpool to Wigan Line is electrified providing a second connection to the West Coast Main Line at Ince Moss Junction via St. Helens Central. The newly electrified line was operational by May 2015. * Electrification of the Manchester to Preston Line via Bolton was announced in December 2009 and was expected to be completed by December 2017. Preparatory work on bridges and tunnels commenced in 2014. However, the work was delayed by geological problems and change of main contractor, electric service eventually commencing on 11 February 2019. * Electrification of the line from Preston to Blackpool North was scheduled for completion by May 2016. It joins the Manchester to Preston Line providing an electrified route from Blackpool to Manchester and the West Coast Main Line. This stage ran behind schedule (following a change of engineering contractor and the decision to combine track & signalling alterations with the electrification work) and the first electric train ran in May 2018. The scheme also involves major restructuring of the lines and rationalization at both Kirkham & Wesham station and Blackpool North. The branch to Blackpool South is not being electrified but is having new signaling at the same time and there was a total blockade of the line November 2017 - March 2018. * The Huddersfield Line from Manchester Victoria to Leeds and York via Stalybridge was expected to be electrified between 2016 and 2018. Electrification was announced in November 2011, but the plan was paused by the government in 2015 because electrification on its own did not deliver the benefits that various stakeholders wanted. The work was expected to be completed in 2022, after the DfT gave the go-ahead for work to resume in September 2015. The section between Manchester Victoria and Stalybridge was to be completed much sooner as it was considered part of the other Northern schemes. In particular there is a grid feeder in the Stalybridge area at Heyrod supplying power to part of the schemes. It was visited by Jonathan Reynolds, the local MP for the constituency on 27 May 2016. There was a blockade from 8 July until 30 July 2017 when work was done in the Ashton under Lyne area. After some back and forth the most recent updates have shown that electrification will go all the way to Stalybridge and then onwards to Leeds. This section is now officially part of the Transpennine Route Upgrade project.


Service improvements

Northern Hub is expected to deliver the following improvements: * 14 trains an hour through Manchester compared with 10 currently * Up to 700 more trains per day with space for 44 million more people to travel by train each year * Two new fast trains per hour between Manchester Victoria and
Liverpool Lime Street Liverpool Lime Street is a terminus railway station and the main station serving the city centre of Liverpool. Opened in August 1836, it is the oldest still-operating grand terminus mainline station in the world. A branch of the West Coast ...
* Six fast trains an hour at peak times between
Leeds Leeds () is a city and the administrative centre of the City of Leeds district in West Yorkshire, England. It is built around the River Aire and is in the eastern foothills of the Pennines. It is also the third-largest settlement (by popul ...
and Manchester as opposed to five * New services to Manchester Airport from
Bradford Bradford is a city and the administrative centre of the City of Bradford district in West Yorkshire, England. The city is in the Pennines' eastern foothills on the banks of the Bradford Beck. Bradford had a population of 349,561 at the 2011 ...
via Halifax, and the Calder Valley and from
Chester Chester is a cathedral city and the county town of Cheshire, England. It is located on the River Dee, close to the English–Welsh border. With a population of 79,645 in 2011,"2011 Census results: People and Population Profile: Chester Loca ...
* A 15-minute service to Manchester Airport from Victoria, Oxford Road and Piccadilly * An express service between Liverpool Lime Street and Newcastle via Manchester Victoria and Leeds commenced in May 2014 As part of the Northern Hub scheme; electrification of key lines will enable faster electric trains increasing capacity and lowering journey times. Typically, diesel trains that operated between Manchester and Liverpool such as the Class 142 and Class 156 had a maximum speed limit of . Following electrification, Class 319 trains reach a top speed of with greater acceleration from stations. Network Rail has published target times from Manchester to be achieved after the completion of the Northern Hub projects. * Leeds and Manchester target time: 40 minutes - a reduction of 14 minutes * Bradford and Manchester target time: 50 minutes - a reduction of 10 minutes * Manchester and Sheffield target time: 40 minutes - a reduction of 8 minutes * Chester and Manchester target time: 40 minutes - a reduction of 23 minutes * Liverpool and Manchester target time: 30 minutes - a reduction of 17 minutes. A reduced journey time of 37 minutes was achieved in May 2014 with the introduction of the new 'express' route and the introduction of Class 319 trains in May 2015 reduced journey times between both cities to 30 minutes. * Manchester and Preston target time: 30 minutes - a reduction of 9 minutes * There will be faster journey times to the
East Midlands The East Midlands is one of nine official regions of England at the first level of ITL for statistical purposes. It comprises the eastern half of the area traditionally known as the Midlands. It consists of Leicestershire, Derbyshire, L ...
via Sheffield,
Chester Chester is a cathedral city and the county town of Cheshire, England. It is located on the River Dee, close to the English–Welsh border. With a population of 79,645 in 2011,"2011 Census results: People and Population Profile: Chester Loca ...
, Halifax,
Hull Hull may refer to: Structures * Chassis, of an armored fighting vehicle * Fuselage, of an aircraft * Hull (botany), the outer covering of seeds * Hull (watercraft), the body or frame of a ship * Submarine hull Mathematics * Affine hull, in affi ...
, Newcastle and the
North East The points of the compass are a set of horizontal, radially arrayed compass directions (or azimuths) used in navigation and cartography. A compass rose is primarily composed of four cardinal directions—north, east, south, and west—each sep ...


Timeline

Network Rail's original aim was for all schemes - including electrification, station upgrades and track work - to be completed by the end of 2018, though this timescale will not be met for the Transpennine electrification. ;2013 *April - work begins on restoring Manchester Victoria station *30 December - Manchester to West Coast Main Line and Newton-le-Willows electrification complete. New four-carriage Class 350s are introduced, reducing journey times and increasing capacity on the Edinburgh-Manchester Airport route. ;2014 *20 May - a new fast service between Liverpool and Newcastle via Manchester Victoria begins delivering journey time reductions *December - Newton-le-Willows to Liverpool Lime Street and Huyton to Wigan electrification complete - delayed, first services Liverpool to Manchester Airport did not run until March 2015. Four-carriage Class 319s will be introduced increasing capacity between Liverpool and Manchester Airport via Manchester Piccadilly. ;2015 *August - Completion of Manchester Victoria station redevelopment ;2016 *Early 2016 - work begins on building two new platforms at Manchester Piccadilly and re-configuring Manchester Oxford Road (subject to application approval, expected in late 2015) ;2017 *December **
Ordsall Chord Ordsall Chord, also known as the Castlefield Curve, is a short railway line in Ordsall, Salford, England, which links and Manchester Oxford Road to , designed to increase capacity and reduce journey times into and through Manchester. It allow ...
operational ** Manchester Victoria to Preston electrification complete ** Manchester to Miles Platting area electrification complete (TP phase 1) ;2018 *Preston-Blackpool electrification complete *Platforms 15 and 16 were supposed to be operational at Manchester Piccadilly ;2020 ;2022 *Manchester to Leeds and York electrification scheduled for completion


Heritage threat

The historic first passenger railway station, Manchester Liverpool Road, a Grade I
listed building In the United Kingdom, a listed building or listed structure is one that has been placed on one of the four statutory lists maintained by Historic England in England, Historic Environment Scotland in Scotland, in Wales, and the Northern I ...
, is threatened by the plan. After this project is completed, it will no longer be possible to run trains into or out of the station. The Manchester Museum of Science and Industry management objected to the scheme and an inquiry was set up in 2014 to investigate potential damage to the historic structure.


Future

The Northern Hub may be merged into or superseded by a larger project being called
High Speed 3 Northern Powerhouse Rail (NPR), sometimes referred to unofficially as High Speed 3, is a proposed major rail programme designed to substantially enhance the economic potential of the North of England. The phrase was adopted in 2014 for a project ...
. David Higgins, chairman of the HS2, stated in March 2014 that the Northern Hub scheme is incremental and the benefits of the High Speed 2 will not be fully felt if rail links between Northern cities are not improved. In June 2014, George Osborne, Chancellor of the Exchequer stated his vision to see improved transport links between Liverpool, Manchester, Sheffield and Leeds to increase economic productivity. Osborne's proposals were referred to as 'Crossrail of the North' and '
High Speed 3 Northern Powerhouse Rail (NPR), sometimes referred to unofficially as High Speed 3, is a proposed major rail programme designed to substantially enhance the economic potential of the North of England. The phrase was adopted in 2014 for a project ...
'. In November 2015 Transport for the North (TfN) proposed a four-track trans-Pennine railway line that would link with the HS2 line to London, and a new Liverpool-Manchester airport-Manchester railway line also linked to HS2. A feasibility study of the west to east rail line and its branches into HS2 will be published in March 2016.


See also

* Northern Powerhouse * Transpennine Route Upgrade


References


External links


Northern Hub website
{{Current rail infrastructure projects in the United Kingdom Proposed rail infrastructure in England Proposed transport infrastructure in the North West of England Electrification