Mumbai–Ahmedabad High Speed Rail Corridor (MAHSR) or Mumbai–Ahmedabad HSR is an under-construction high-speed rail line connecting India's economic hub
Mumbai Mumbai (, ; also known as Bombay — List of renamed Indian cities and states#Maharashtra, the official name until 1995) is the capital city of the Indian States and union territories of India, state of Maharashtra and the ''de facto'' fin ...
with the city of Ahmedabad. When completed, it will be India's first high-speed rail line. Construction was expected to begin by April 2020, and the project was expected to be completed by December 2023. Due to delays acquiring land in Maharashtra, a completion date for the whole corridor is uncertain, though the 352 km stretch through Gujarat may open in 2027. A stretch of , from Surat to Bilimora, is expected to be completed by 2026.


History


Conception

The Mumbai–Ahmedabad corridor, along with five other high-speed rail corridors, was introduced for a feasibility study in the 2009–2010
Rail Budget Railway budget of India was the Annual Financial Statement of the state-owned Indian Railways, which handles rail transport in India. It was presented every year by the Minister of Railways, representing the Ministry of Railways, in the Parlia ...
. A long high-speed rail corridor was proposed to run from to via Mumbai. The point at which this route would touch Mumbai was to be decided when the feasibility report was prepared. The pre-feasibility study for the Ahmedabad–Mumbai–Pune corridor was completed by a consortium of
RITES Rail India Technical and Economic Service Limited, abbreviated as RITES Ltd, is a wholly owned subsidiary of the Indian Railways, Ministry of Railways, Government of India. It is an engineering consultancy corporation, specializing in the field ...
,
Italferr Italferr is a consulting and project company belonging to FS (Ferrovie dello Stato), the Italian railway state company. Italferr, the Italian State Railways Group engineering firm, operates on the Italian and international markets in the field o ...
and
Systra SYSTRA is a multinational engineering and consulting group in the mobility sector, whose fields of activity include rail and public transport. In 2019, it employed a staff of about 7,300 people, and is a limited company which shareholders includ ...
. The top speed expected for the corridor was set up to . The proposed stations included
Lonavala Lonavala (ISO: Loṇāvaḷā) is a hill station town and a Municipal Council in the Pune district, Maharashtra, India. It is about west of Pune and to the east of Mumbai. It is known for its production of the hard candy ''chikki'' and is als ...
on Mumbai–
Pune Pune (; ; also known as Poona, ( the official name from 1818 until 1978) is one of the most important industrial and educational hubs of India, with an estimated population of 7.4 million As of 2021, Pune Metropolitan Region is the largest i ...
section and Surat, Bharuch and
Vadodara Vadodara (), also known as Baroda, is the second largest city in the Indian state of Gujarat. It serves as the administrative headquarters of the Vadodara district and is situated on the banks of the Vishwamitri River, from the state capita ...
on Mumbai–Ahmedabad section. It was proposed to have 32 services between Mumbai and Ahmedabad. Railway officials also proposed extending the corridor up to Bengaluru. A Memorandum of Understanding (MoU) was signed in
New Delhi New Delhi (, , ''Naī Dillī'') is the capital of India and a part of the National Capital Territory of Delhi (NCT). New Delhi is the seat of all three branches of the government of India, hosting the Rashtrapati Bhavan, Parliament Ho ...
on 14 February 2013 between the
Ministry of Railways A Ministry of Railways is a Cabinet department that exists or has existed in many Commonwealth states as well as others. It generally occurs in countries where railroad transportation is a particularly important part of the national infrastructur ...
and the
Société Nationale des Chemins de Fer Français The Société nationale des chemins de fer français (; abbreviated as SNCF ; French for "National society of French railroads") is France's national state-owned railway company. Founded in 1938, it operates the country's national rail traffic ...
(SNCF), the French national railways, for technical cooperation in the field of railways. The parties agreed to carry out jointly an "operations and development" feasibility project on the Mumbai–Ahmedabad high-speed rail corridor. The project was funded by the SNCF with support from the French Ministry of Finance. In March 2013, the
Railway Board The Ministry of Railways is a ministry in the Government of India, responsible for the country's rail transport. The ministry operates the statutory body Indian Railways, an organisation that operates as a monopoly in rail transport and is h ...
decided to drop the Mumbai–Pune section and operate the high-speed rail service only between Mumbai and Ahmedabad. The Board took the decision due to financial constraints, as the ghat section between Pune and Mumbai would escalate the budget for the project. According to Vidyadhar A. Malegaonkar, Chief Public Relations Officer (PRO), Western Railway, "It's basically a Western Railway project and very little portion of Maharashtra was being covered under it. Hence, the Maharashtra government was showing little interest in the project and was also reluctant to bear a financial burden. That is the reason why the Railway Board has decided against including the Pune–Mumbai portion in the high-speed corridor". India and Japan signed a MoU to undertake a joint feasibility study of the Mumbai–Ahmedabad route in New Delhi in September 2013. This was in pursuance of the Joint Statement between the then- Prime Minister of India, Manmohan Singh and the
Prime Minister of Japan The prime minister of Japan (Japanese: 内閣総理大臣, Hepburn: ''Naikaku Sōri-Daijin'') is the head of government of Japan. The prime minister chairs the Cabinet of Japan and has the ability to select and dismiss its Ministers of Sta ...
,
Shinzō Abe Shinzo Abe ( ; ja, 安倍 晋三, Hepburn: , ; 21 September 1954 – 8 July 2022) was a Japanese politician who served as Prime Minister of Japan and President of the Liberal Democratic Party (LDP) from 2006 to 2007 and again from 2012 to 20 ...
, on 29 May 2013, which provided that the two sides would co-finance a joint feasibility study of the route. The objective of the joint study was to prepare a feasibility report of the system with a speed of . The cost of the study (¥500 million) was borne equally by India and Japan. The study was scheduled to be completed within 18 months from its commencement, i.e. by July 2015. The study carried out traffic forecasting, alignment surveys and undertook a comparative Study of high-speed railway technology and systems.
Japan International Cooperation Agency The is a governmental agency that delivers the bulk of Official Development Assistance (ODA) for the government of Japan. It is chartered with assisting economic and social growth in developing countries, and the promotion of international co ...
(JICA) and the SNCF carried out studies on the project. JICA researched the technology, alignment and traffic-related aspects, while SNCF worked on business projections. The feasibility study included an alignment survey concerning aspects such as land acquisition, environmental challenges and building of tunnels and bridges. It also suggested a financial model based on fare and non-fare box revenue.


Planning

JICA officials visited Mumbai in January 2014 to discuss the details of the project, and made selective site visits to the proposed route. On 21 January, following several meetings between JICA and
Indian Railways Indian Railways (IR) is a statutory body under the ownership of Ministry of Railways, Government of India that operates India's national railway system. It manages the fourth largest national railway system in the world by size, with a tota ...
officials, it was proposed to originate the corridor at the Bandra Kurla Complex (BKC) in Mumbai. The proposed route would begin from BKC, go right up to
Thane Thane (; also known as Thana, the official name until 1996) is a metropolitan city in Maharashtra, India. It is situated in the north-eastern portion of the Salsette Island. Thane city is entirely within Thane taluka, one of the seven taluk ...
on the Central Line, and then take a diversion on the Trans-Harbour route which is on the Thane-Diva-Vasai-Virar stretch. The corridor would then switch over to the Western Line, before entering Gujarat and terminating at Ahmedabad. 12 stations were proposed on the route, of which 8 would have been in Gujarat. The intention behind taking the route via Thane is to keep the option open to link the corridor to Pune. The team also proposed other options for originating the line at either
Bandra Terminus Mumbai Bandra Terminus (station code: BDTS) also known as Vandre Terminus (in Marathi)is a railway terminus in Bandra from where trains bound for Northern India and Western India are scheduled regularly. It was built in the 1990s to deconges ...
or
Lokmanya Tilak Terminus Lokmanya Tilak Terminus (also known by its former name Kurla Terminus, station code: LTT) is a railhead and a major railway terminus in the Kurla suburb of Mumbai, India. LTT is managed by the Central Railway. The and suburban railway station ...
, if the BKC option was unfeasible. Air-conditioned bullet trains are expected to operate in the corridor at speeds of , enabling commuters to traverse the distance in two hours. Currently, the fastest train operating on this sector is the Ahmedabad Duronto Express, which takes Six and Quarter hours to reach from Ahmedabad running non-stop between these two cities at a maximum speed of . The project held its first full-fledged meeting at the Railway Ministry in the first week of April 2014, to bring about a broad consensus on the project, especially between the governments of Maharashtra and Gujarat. The meeting was attended by representatives from the Maharashtra and Gujarat governments, and the JICA, and Railway Board officials. At the meeting, officials agreed to begin the line from BKC, and then take it to Thane and onward to Virar. The Maharashtra government was in favour of connecting the line with Belapur as well, in order to bring high-speed rail to
Navi Mumbai Navi Mumbai (), is a planned city situated on the west coast of the Indian subcontinent, located in the Konkan division of Maharashtra state, on the mainland of India. Navi Mumbai is part of the Mumbai Metropolitan Region (MMR). The city i ...
. However, railway officials were opposed to the Belapur detour. Officials also discussed the need to ensure that the terminal at BKC would be connected to Line 3 of the
Mumbai Metro The Mumbai Metro is a rapid transit (MRT) system serving the city of Mumbai and the wider Mumbai Metropolitan Region in Maharashtra, India.Mumbai Metropolitan Region Development Authority is responsible authority for maintaining the metro system ...
, enabling commuters from
South Mumbai South Mumbai, colloquially SoBo from South Bombay in Anglo-Indian English, administratively the Mumbai City District, is the city centre and the southernmost precinct of Greater Bombay. It extends from Colaba to Mahim and Sion neighbour ...
to reach BKC. In May 2014, the project was approved by
Prime Minister A prime minister, premier or chief of cabinet is the head of the cabinet and the leader of the ministers in the executive branch of government, often in a parliamentary or semi-presidential system. Under those systems, a prime minister i ...
Narendra Modi Narendra Damodardas Modi (; born 17 September 1950) is an Indian politician serving as the 14th and current Prime Minister of India since 2014. Modi was the Chief Minister of Gujarat from 2001 to 2014 and is the Member of Parliament fro ...
in a meeting with the chairman of the High Speed Rail Corporation of India. The feasibility study on the project was carried out by RITES, Italferr and Systra in July 2015. On 20 July 2015, a joint Japanese-Indian survey team recommended a
Shinkansen The , colloquially known in English as the bullet train, is a network of high-speed railway lines in Japan. Initially, it was built to connect distant Japanese regions with Tokyo, the capital, to aid economic growth and development. Beyond l ...
-style system for the Mumbai–Ahmedabad line, including the adoption of
Automatic train control Automatic train control (ATC) is a general class of train protection systems for railways that involves a speed control mechanism in response to external inputs. For example, a system could effect an emergency brake application if the driver d ...
and dedicated tracks. JICA's report recommended constructing 63.3% of the route an embankment slightly above the ground, 28.3% on stilts, 5.8% underground and 2.2% on bridges. Minister of State for Railways
Rajen Gohain Rajen Gohain (26 November 1950) born in Nagaon, Assam is an Indian politician who served as Member of parliament, Lok Sabha. He has represented the Nowgong constituency in Assam since 1999 to 2019 and is a member of the Bharatiya Janata Party. ...
informed
Parliament In modern politics, and history, a parliament is a legislative body of government. Generally, a modern parliament has three functions: representing the electorate, making laws, and overseeing the government via hearings and inquiries. Th ...
on 15 March 2017 that under a new plan the entire corridor would be elevated except for the tracks that were proposed to be built underground. The Ministry of Railways, based on the recommendation of the NITI Aayog, announced that
Shinkansen The , colloquially known in English as the bullet train, is a network of high-speed railway lines in Japan. Initially, it was built to connect distant Japanese regions with Tokyo, the capital, to aid economic growth and development. Beyond l ...
technology would be adopted for the line, with technology transfer to support the
Make in India Make in India is an initiative by the Government of India to create and encourage companies to develop, manufacture and assemble products made in India and incentivize dedicated investments into manufacturing. The policy approach was to crea ...
programme. Japan would also provide staff training. In January 2016, the Ministry of Railways fast tracked the project and set up a Special Purpose Vehicle (SPV) named the National High Speed Rail Corporation Limited to build and operate the corridor. The company was registered in January 2016 in the name of Indian Railways. It was planned for the company to eventually be made into a joint venture with equity participation of the Maharashtra and Gujarat governments. The Public sector company is expected to build and also carry out train operations. The Ministry of Railways, the National High-Speed Rail Corporation (NHSRC) and JICA signed a tripartite consultancy agreement in December 2016 to implement the project. The NHSRC is a new agency floated to implement the project. A joint venture between Japan International Consultants for Transportation Co (JIC), Nippon Koei Co, and Oriental Consultants Global Co. Ltd. was appointed as the general consultants for the project, and prepared design documents, bidding documents and technical standards and specifications for the project. In late 2016, JICA awarded the detailed design study for the project to a consortium led by Japan International Consultants for Transportation (JIC), Nippon Koei India Pvt. Ltd and Oriental Consultants. The study formally began in March 2017. JIC will forecast demand, set fares and devise a train operation plan, handle preliminary design work for structures such as tunnels and bridges, and draw up an overall construction schedule. Japan International Consultants for Transportation (JIC) Project Manager stated that "conditions surrounding the construction of a high-speed railway in India – such as weather, which is harsh there, and the quality and standards of materials – are considerably different from those in Japan. So we are now comparing and adjusting to these technical matters." Japanese public and private sector companies conducted training programs for railway staff in India. JIC stated that the local expertise in India gained from constructing and operating various rapid transit systems could be utilized for the high speed rail project. Japan also provided training to Indian Railway Ministry officials, some of whom studied in government-sponsored programs at graduate schools in Japan. India and Japan signed an agreement to establish an HSR Training Institute in India by 2020 to train railway staff in high speed rail operations. The project received clearance from the National Board for Wildlife (NBWL) in January 2019 to carry out construction in and around wildlife areas. The Board required the NHSRC to create safe passages for animals to pass through before beginning construction, and to erect noise barriers and fencing to prevent any disturbance to wildlife during construction. The project received conditional clearance to cut down 53,467 mangrove trees spread over an area of 13.36 hectares from the expert appraisal committee (EAC) on Coastal Regulation Zone (CRZ) projects of the Union Ministry of Environment and Forests on 18 March 2019. The Ministry required the NHSRCL to obtain approval from the Bombay High Court and clearance from the Dahanu Taluka Environment Protection Authority. The NHSCRL is also required to conduct a study on the impact of the vibrations from the trains on the birds and mudflats in the Thane Creek Flamingo Sanctuary. The NHSRCL approached the Bombay High Court for approval on 8 April 2019. The NHSRCL announced in June 2019 that it had altered the proposed design of Thane station which would save 21,000 mangrove trees. As a result, only 32,044
mangrove A mangrove is a shrub or tree that grows in coastal saline or brackish water. The term is also used for tropical coastal vegetation consisting of such species. Mangroves are taxonomically diverse, as a result of convergent evolution in severa ...
s are affected by the project.


Design

The design for the bridges, viaducts and tunnels was made by engineers based in Delhi, Mumbai and Japan. The corridor is long and traverses the states of Maharashtra and Gujarat and the union territory of
Dadra and Nagar Haveli Dadra and Nagar Haveli is a district of the union territory of Dadra and Nagar Haveli and Daman and Diu in western India. It is composed of two separate geographical entities: Nagar Haveli, wedged in between Maharashtra and Gujarat states t ...
. The alignment comprises of viaducts (90.6% of route length), of tunnels (5.1%), of
cut and fill In earthmoving, cut and fill is the process of constructing a railway, road or canal whereby the amount of material from cuts roughly matches the amount of fill needed to make nearby embankments to minimize the amount of construction labor. ...
(2.5%) and of bridges (1.8%). A tunnel connects
Thane Thane (; also known as Thana, the official name until 1996) is a metropolitan city in Maharashtra, India. It is situated in the north-eastern portion of the Salsette Island. Thane city is entirely within Thane taluka, one of the seven taluk ...
and
Virar Virar (Pronunciation: iɾaɾ is a coastal city in taluka Vasai and district of Palghar, India. It is clubbed into Vasai-Virar city, administered by Vasai-Virar Municipal Corporation. It lies in south part of Palghar District in Vasai Talu ...
, of which will be undersea. The undersea tunnel was chosen to avoid damaging the thick vegetation present in the area. The corridor will begin at the underground station in the Bandra-Kurla Complex in Mumbai, and then traverse underground before emerging above ground at Thane.


Cost

The project is estimated to cost , including the cost of 24 trainsets, interest during construction and import duties. JICA agreed to fund 81% of the total project cost , through a 50-year loan at an interest rate of 0.1% with a moratorium on repayments up to 15 years and the remaining cost will be borne by the state governments of Maharashtra and Gujarat. 20% of the components used on the corridor will be supplied by Japan, and manufactured in India. Most of the line will be constructed on an elevated corridor to avoid land acquisitions and the need to build underpasses. It will also enhance safety by eliminating the need for level crossings. The decision to construct an elevated line raised the cost for the project by an additional . Railway Minister Piyush Goyal informed Parliament that had been spent on the project as of June 2019. The expenditure already incurred rose to by July 2022, even as analysis suggested a 48% cost escalation in the project to due to the
COVID-19 pandemic The COVID-19 pandemic, also known as the coronavirus pandemic, is an ongoing global pandemic of coronavirus disease 2019 (COVID-19) caused by severe acute respiratory syndrome coronavirus 2 (SARS-CoV-2). The novel virus was first identi ...
and land acquisition issues.


Land acquisition

Survey work on the route began in January 2017. According to NHSRC director Mukul Saran Mathur, "''The geo-technical surveys have started along the entire route between Mumbai and Ahmedabad and is expected to take two to three months. The activities that have begun include geo-technical and geo-physical investigations into the 21-kilometre, under-water tunnel of the project as well as the Final Location Survey to mark the alignment, right down to the pillars on which the high speed trains will run.''" RITES identified 750 locations along the entire route to carry out soil testing, including 62 locations for the underground section. The agency completed soil testing at a total of 250 locations by 24 February. Officials carried out testing of soil and rocks at a depth of 70 metres underwater for the undersea tunnel stretch. Railway officials utilized a helicopter mounted with a 100-megapixel high-resolution digital camera, a Light Detection and Ranging (LiDAR) scanner, a data recorder and other equipment to carry out the survey. This aerial-survey method provides accurate data about land contours, buildings and vegetation, and will permit the survey work to be completed within 9–10 weeks as opposed to the six to eight months required for a regular survey. The helicopter completed its survey of the entire route within a flying time of 30 hours, and the rest of the time is required for data processing. The aerial survey was completed by JICA and the Indian Railways by the end of February 2017. Railway Ministry officials stated in April 2017 that final location surveys had been completed, and that consultants to carry out environmental and social impact studies would be appointed within a few months. Indian Prime Minister
Narendra Modi Narendra Damodardas Modi (; born 17 September 1950) is an Indian politician serving as the 14th and current Prime Minister of India since 2014. Modi was the Chief Minister of Gujarat from 2001 to 2014 and is the Member of Parliament fro ...
and Japanese Prime Minister
Shinzo Abe Shinzo Abe ( ; ja, 安倍 晋三, Hepburn: , ; 21 September 1954 – 8 July 2022) was a Japanese politician who served as Prime Minister of Japan and President of the Liberal Democratic Party (LDP) from 2006 to 2007 and again from 2012 to 20 ...
laid the foundation stone for the project in Ahmedabad on 14 September 2017. All geo-technical surveys and tests under the sea bed for the underground section were completed by December 2017. Civil construction of the corridor was expected to begin by June 2018, and the project was scheduled to be completed in 2023. The deadline was advanced to have the bullet train go on its first run on 15 August 2022 on the occasion of India's 75th Independence day. However, surveys and land acquisition for the project faced delays and disruptions due to protests by farmers, land owners, and members of the Maharashtra Navnirman Sena party, which opposes the bullet train project. The deadline to complete land acquisition was postponed from December 2018 to December 2019 as a result of the protests. Railway Minister Piyush Goyal stated in July 2019 that the project was expected to be completed by December 2023. In February 2020, Maharashtra Chief Minister Uddhav Thackeray called the project a "
white elephant A white elephant is a possession that its owner cannot dispose of, and whose cost, particularly that of maintenance, is out of proportion to its usefulness. In modern usage, it is a metaphor used to describe an object, construction project, sch ...
" and questioned whether anyone would benefit from it. The Shiv Sena has also blocked land acquisition attempts causing delays to the project. A total of 1,434.4 hectares of land will be required for the project including private, government, forest and railway land. The Railway Ministry stated that it had only been able to acquire 21.02 hectares or about 1.46% of the total land required for the project as of 18 December 2018. NHSRC officials stated on 16 January 2019 that they had received the consent for land acquisition from 61 out of the 104 villages in Maharashtra that were located along the proposed route. Officials in Gujarat stated that land acquisition was expected to be completed only by the end of 2019. As of May 2019, 60% of land acquisition in Gujarat was completed. A report by news agency
IANS Indo-Asian News Service or IANS is a private Indian news agency. It was founded in 1986 by Indian American publisher Gopal Raju as the "India Abroad News Service" and later renamed. Their main offices are located in Noida, Uttar Pradesh. The ser ...
quoted an unnamed NHSRC official as stating that 39% of the total land acquisition had been completed as of June 2019. The official stated that 471 of 940 hectares of land was acquired in Gujarat and 66 of 431 hectares in Maharashtra. In August 2019, Minister of State for Railways Suresh Angadi informed Parliament that 297 villages were located along the proposed route in Gujarat and 97% of land owners in the state had consented to land acquisition but the government was still facing challenges acquiring land in certain pockets of Maharashtra. NHSRC Managing Director Achal Khare stated that 45% of total land acquisition for the project was complete as of September 2019. The
Gujarat High Court The Gujarat High Court is the High Court of the state of Gujarat. It was established on 1 May 1960 under the ''Bombay Re-organisation Act, 1960'' after the state of Gujarat split from Bombay State. The seat of the court is Ahmedabad. The pre ...
dismissed a batch of petitions filed by farmers challenging the acquisition of their lands for the project later in the same month. On 29 January 2020, Railway Board Chairman VK Yadav stated that 47% of the total land required for the project had been acquired. Maharashtra had only acquired 101.04 hectares out of the total 432 hectares required for the project, with no land having been acquired in Mumbai as of February 2021. Gujarat had completed 94% of total land acquisition (901.86 of 956.15 hectares). Railway Minister Piyush Goyal stated that the project would not be completed by 2023 due to land acquisition delays in Maharashtra. He also confirmed that the Railways would proceed with the tendering process in Gujarat as the state had acquired 94% of required land. In September 2021, the NHSRCL stated that it had acquired 30% of required land in Maharashtra, 97% in Gujarat and had completed land acquisition in Dadra and Nagar Haveli. As of March 2022, Over 89% of required land has been acquired, 98% in gujarat, 68% in Maharashtra, and 100% in Daman and Diu and Dadra and Nagar Haveli.


Construction

The NHSRCL has divided the civil construction work of 508 km long
Mumbai Mumbai (, ; also known as Bombay — List of renamed Indian cities and states#Maharashtra, the official name until 1995) is the capital city of the Indian States and union territories of India, state of Maharashtra and the ''de facto'' fin ...
Ahmedabad High Speed Rail project into 8 packages as given below: Note: The civil contract C8 has been awarded to the joint-venture of SCC Infrastructure Ltd and VRS Construction Ltd. The NHSCRL floated tenders for the construction of the undersea tunnel on 23 April 2019. A tender for works between Vadodara and Ahmedabad was floated in August 2019. In January 2021, the NHSRCL invited final bids for the construction of the Mumbai terminal. The agency floated tenders for construction of the Sabarmati depot in August 2021. The NHSRCL reinvented tender for underground HSR station at BKC grounds , Mumbai on 22 August 2022. It has also reinvented tendor for India's longest undersea tunnel of 21 km on 23 September 2022. The NHSRCL stated that construction work on the project would create 90,000 direct and indirect jobs, including more than 51,000 technician jobs. The NHSRCL announced that it had cast the first full height pier for the project near Vapi, Gujarat on 31 July 2021. A Full Span Launching Equipment-Straddle Carrier and Girder Transporter was deployed for use in the project September 2021. The equipment was indigenously designed and manufactured at Larsen and Toubro's manufacturing facility in Kanchipuram,
Tamil Nadu Tamil Nadu (; , TN) is a state in southern India. It is the tenth largest Indian state by area and the sixth largest by population. Its capital and largest city is Chennai. Tamil Nadu is the home of the Tamil people, whose Tamil language ...
. Over 30 such machines will be used in the construction of the project.


Infrastructure and operations

Indian Railways proposes to operate two types of services on the corridor. A "Rapid Train" or express service with only two stops at Surat and Vadodara, and a slower service that stops at all stations. The "Rapid Train" would complete the journey in 2 hours and 7 minutes, while the slower service would take 2 hours and 58 minutes. In total, 70 daily services will be operated on the line, or 35 services in each direction with 3 services per hour during peak hours and 2 services per hour during off-peak hours. The Railways estimates that the high speed rail corridor will have a daily ridership of around 36,000 in 2023. Trains will operate between 6.00AM and midnight. Currently, a train journey from Mumbai to Ahmedabad takes 7 hours. On 9 January 2017 at Vibrant Gujarat Summit, the
Gujarat Government The Government of Gujarat, also known as Gujarat Government, is the supreme governing authority of the Indian state of Gujarat and its 33 districts. It consists of an executive of the legislators appointed by the Governor of Gujarat, a judiciar ...
and the National High Speed Rail Corporation Limited (NHSRC) signed an MoU worth for component manufacturing for the high speed rail corridor. The Gujarat Government will bear 25% of the total project cost and provide land for the project.


Rolling stock

Twenty-four red E5 Series Shinkansen trainsets will be procured to operate on the corridor, of which 6 are to be assembled in India. The trains will be modified to operate under Indian weather. Trains in Japan can withstand temperatures of up to 35 degrees celsius but the Indian trains will be able to operate at temperatures exceeding 50 degrees celsius; this can be achieved with the use of special cooling systems and air conditioners. Fine mesh dust filters will be fitted on air conditioners, blowers, and other important equipment on the Indian high speed trains to keep dust out. Another modification is the provision of extra space to store heavy luggage by removing a few seats from the last coach of each train. Trains are proposed to have a length of between 10 and 16 coaches. Each train will have a passenger capacity of between 1,300 and 1,600 passengers. The system will be designed to operate trains at a maximum speed of , while the operational speed would be . Trains will be equipped with multi-purpose rooms that contain foldable beds for feeding mothers and patients, and the rooms will also be fitted with mirrors and baggage racks.


Signaling and power

Signaling equipment and power systems for the corridor will be imported from Japan, per the terms of the loan agreement with JICA. The NHSRCL estimated that the corridor would consume around 110 crore units of electricity annually once operational. Consumption was expected to rise in 2033, when additional services are planned to be introduced. A total of 29 substations will supply electricity to the corridor. The NHSRCL finalized the locations for the substations by January 2018, and approached power utility companies in Gujarat and Maharashtra to conduct joint surveys which were completed by April 2018. The NHSRCL acquired 39,540 square feet of land from the Godrej and Boyce Manufacturing Company at Vikhroli in May 2018 to construct the ventilation shaft and distribution and traction sub-stations for the corridor. Solar panels installed at the Sabarmati and Thane stations, at the High-Speed Rail Training Institute in Vadodara, and at the Sabarmati HSR Complex will generate solar power.


Operator

The National High Speed Rail Corporation Limited (NHSRCL) was registered under the ''Companies Act, 2013'' on 12 February 2016. The NHSRC is a special purpose vehicle responsible for the implementation of the Mumbai–Ahmedabad high-speed rail project. In October 2016, the Indian Railways invited applications to fill key positions in the NHSRC.


Fares

The detailed project report proposed fares that would be 1.5 times that of a First-Class AC ticket on the Mumbai–Ahmedabad Duronto Express. In September 2019, the NHSRCL stated that the end-to-end fare on the corridor was expected to be , and the minimum fare would be . Trains will have business and standard sections with 2x2 and 2x3 seating configuration respectively. Unlike Japanese Shinkansen coaches, the last coach on Indian trains will have a few seats removed to make space to store check-in luggage. NHSRC Managing Director Achal Khare stated that Japanese passengers typically travel light but the modification was made to accommodate Indian passengers. The coaches have sufficient overhead space for hand baggage but not for heavy luggage. The NHSRC stated that it would charge passengers an additional fee for check-in luggage in order to discourage travellers from bringing too many pieces of heavy luggage. Passengers who travel with check-in luggage would be seated in the same coach in which check-in luggage is stored.


Depots

The corridor uses three depots at Sabarmati and Surat in Gujarat and Thane in Maharashtra. The depots were designed based on the operations at Japan's Sendai and
Kanazawa is the capital Cities of Japan, city of Ishikawa Prefecture, Japan. , the city had an estimated population of 466,029 in 203,271 households, and a population density of 990 persons per km2. The total area of the city was . Overview Cityscape ...
depots for Shinkansen. The Sabarmati depot is spread over an area of 80 hectares and serves as the main depot for the line. It also houses the operation control centre for the corridor. The Thane depot is spread over an area of 60 hectares. The Sabarmati and Thane depots contain washing plants, inspection bays, sheds, workshops, and stabling lines for regular maintenance of trains. The Surat depot is the smallest with an area of 44 hectares. It contains basic facilities for train maintenance. All depots contain reservoirs for rain water harvesting and collected water is passed through treatment plants within the depot before being re-used for washing trainsets. Depots also have recharge pits for recharging water back into the earth. The Thane and Surat depots are also capable of recycling and re-using effluent and sewage water. Bio-waste from the trains is stored in tanks onboard and removed at depots, where it is then treated in sewage treatment plants.


Stations

The line will have 12 stations. Stations are proposed for Mumbai,
Thane Thane (; also known as Thana, the official name until 1996) is a metropolitan city in Maharashtra, India. It is situated in the north-eastern portion of the Salsette Island. Thane city is entirely within Thane taluka, one of the seven taluk ...
,
Virar Virar (Pronunciation: iɾaɾ is a coastal city in taluka Vasai and district of Palghar, India. It is clubbed into Vasai-Virar city, administered by Vasai-Virar Municipal Corporation. It lies in south part of Palghar District in Vasai Talu ...
, Boisar, Vapi, Bilimora, Surat, Bharuch,
Vadodara Vadodara (), also known as Baroda, is the second largest city in the Indian state of Gujarat. It serves as the administrative headquarters of the Vadodara district and is situated on the banks of the Vishwamitri River, from the state capita ...
, Anand/ Nadiad, Ahmedabad and Sabarmati. High speed rail stations will be constructed either above or next to existing railway stations to provide transfer with the Indian Railways network. The Director of the Railway Bureau of Japan's Ministry of Land, Infrastructure, Transportation and Tourism stated that "this makes construction extremely difficult".


Mumbai terminal

The Indian Railways proposed making the proposed terminus at BKC as a three-storey underground station. However, the Maharashtra state government planned to construct the International Financial Services Centre (IFSC) at BKC on the same plot. JICA's report had cited the BKC plot as the most suitable location to build the Mumbai terminus. In February 2016, the Railways and the state government came to an agreement to construct both projects at the BKC. However, in April 2016, the state government refused to permit construction of the underground station at BKC, citing the lack of availability of land in the area for an underground station after the completion of the proposed IFSC and its multi-level underground car park. The state government also stated that IFSC would begin generating revenue for the government shortly, while the rail corridor was only expected to be completed by 2023. It instead suggested relocating the proposed BKC terminus to either Matunga or Kanjurmarg. The issue was resolved in January 2017, when the Maharashtra Government and the MMRDA agreed to provide 5.4 hectares of land in BKC to construct a terminus. Lines 2 and 3 of the
Mumbai Metro The Mumbai Metro is a rapid transit (MRT) system serving the city of Mumbai and the wider Mumbai Metropolitan Region in Maharashtra, India.Mumbai Metropolitan Region Development Authority is responsible authority for maintaining the metro system ...
will meet the HSR at BKC.


Vadodara

Platform 6 of the will be used as the platform for the bullet train. The NHSRCL will revamp the existing station to accommodate high-speed rail services. This will involve the removal of the reservation center, section engineering office, water tank and railway police station located on the existing platform. The new station building will have a height of 20–22 metres, and will be 40 metres in width. The design of the station is inspired by the banyan tree. The project requires the dismantling of platform 7. The largest girder on the high-speed rail corridor, measuring 220 metres in length, will be located at Vadodara station. The construction of the girder will require the dismantling of platform 7 of Vadodara Junction station which is used by trains arriving from Delhi. To cope with the loss of the platform, the NHRSCL will build a new as a satellite station. Chhayapuri station was inaugurated in December 2019, paving the way for officials to go ahead with the dismantling of platform 7 at Vadodara Junction.


Ahmedabad Terminal

The Sabarmati station will serve as the high-speed rail terminal in Ahmedabad. A new high speed rail terminal will be built on the eastern side of the station above the existing platforms 10, 11 and 12. The
Ahmedabad Metro Ahmedabad Metro is a rapid transit system for the cities of Ahmedabad and Gandhinagar in Gujarat state of India. The Gujarat Metro Rail Corporation Limited was established in February 2010 and the long Phase–1 of the project was approved ...
will connect the HSR at (Kalupur station).


Extensions


Delhi–Ahmedabad

Delhi-Ahmedabad high-speed rail corridor (DAHSR) and Mumbai–Ahmedabad high-speed rail corridor (MAHSR) will together form the Delhi-Mumbai high-speed rail corridor (DMHSR). DAHSR, long, will pass through
Delhi Delhi, officially the National Capital Territory (NCT) of Delhi, is a city and a union territory of India containing New Delhi, the capital of India. Straddling the Yamuna river, primarily its western or right bank, Delhi shares borders ...
,
Haryana Haryana (; ) is an Indian state located in the northern part of the country. It was carved out of the former state of East Punjab on 1 Nov 1966 on a linguistic basis. It is ranked 21st in terms of area, with less than 1.4% () of India's land a ...
(),
Rajasthan Rajasthan (; lit. 'Land of Kings') is a state in northern India. It covers or 10.4 per cent of India's total geographical area. It is the largest Indian state by area and the seventh largest by population. It is on India's northwestern s ...
and Gujarat and will be three to four hours commute with maximum speed and average speed of . It will start from Dwarka Sector 21 in Delhi, run along
Dwarka Expressway Northern Peripheral Road or NH 248-BB, commonly known as Dwarka Expressway is a long, under construction, 8-lane,elevated grade separated expressway connecting Mahipalpur in Delhi to Kherki Daula Toll Plaza, Gurgaon in Haryana. The expres ...
till
Gurugram Gurgaon (pronunciation: ʊɽɡãːw, officially named Gurugram (pronunciation: ʊɾʊɡɾaːm, is a city located in the northern Indian state of Haryana. It is situated near the Delhi–Haryana border, about southwest of the nationa ...
with stop at
Manesar Manesar is a town and municipal corporation, know new Gurugram City in the Gurugram district of the state of Haryana, India and a part of the National Capital Region (NCR) of Delhi. It is an industrial hub. Its proximity to the burgeoning ci ...
, then along Gurugram-Jaipur rail line to Rewari, and then along
NH-48 National Highway 48 (NH 48) is a National Highway of India that starts at Delhi and terminates at Chennai traversing through seven states of India. It has a total length of 2807 km (1744 miles). NH 48 passes through the states of Delhi ...
to
Jaipur Jaipur (; Hindi: ''Jayapura''), formerly Jeypore, is the capital and largest city of the Indian state of Rajasthan. , the city had a population of 3.1 million, making it the tenth most populous city in the country. Jaipur is also known ...
and Ahmedabad.Delhi-Ahmedabad high-speed rail corridor to pass through Gurugram, Social News, 20 July 2021.


Project status


2020

* July : 60% of required land was acquired and the rest was ''"almost on the verge of completion."'' Civil works tenders covering 68% corridor ( out of , of 77% land in
Gujarat Gujarat (, ) is a state along the western coast of India. Its coastline of about is the longest in the country, most of which lies on the Kathiawar peninsula. Gujarat is the fifth-largest Indian state by area, covering some ; and the ninth ...
, 80% in Dadra & Nagar Haveli and 22% in Maharashtra) and a separate tender for 28 steel bridges have been allocated, remaining tendering process is underway.Railways' two big ticket projects DFC, bullet train on track despite lockdown: Railway Board Chairman VK Yadav
''Economic Times'', 6 June 2020.
* October : Contract signed for 47% of the total length of the project. The contract awarded lies in the state of Gujarat. * November : Contract awarded for further stretch of taking the total to 64% of the total length of .


2021

* February :
Larsen and Toubro Larsen & Toubro Ltd, commonly known as L&T, is an Indian multinational conglomerate company, with business interests in engineering, construction, manufacturing, technology, information technology and financial services, headquartered in Mumba ...
(L&T) begins Pier Work for Mumbai-Ahmedabad High Speed corridor. * May : Larsen and Toubro (L&T) started pouring concrete to cast the first pier of Mumbai-Ahmedabad High Speed corridor. * June : Newly appointed Railway Minister,
Ashwini Vaishnaw Ashwini Vaishnaw (born 18 July 1970) is an Indian politician and former IAS officer currently serving as the Minister of Railways, Communications and Electronics & Information Technology in Government of India, since 8 July 2021. He is a membe ...
reviewed the entire project. According to PTI report, 1,035 hectare had been acquired out of the total of 1,396 hectares of land required for the project. Out of the 74% land acquired till this date, the majority of 96% falls in Gujarat, while only 25% falls in the state of Maharashtra. Besides, 96% of the land needed for the project in Dadra and Nagar Haveli had already been acquired. * July : National High Speed Rail Corporation Limited (NHSRCL) invites bids for design, construction, installation, testing and commissioning of Sabarmati Depot consisting of workshop, inspection sheds, various buildings, maintenance facilities and associated works. December 2, 2021 would be the last date for submission of bids. * August : NHSRCL casts the first full height pier on Mumbai–Ahmedabad high-speed rail corridor. The exact height of the cast pier is 13.05 metres. The pier is cast with 183 cubic metres of concrete quantity and 18.820 MT of steel. * September : On 10 September Larsen and Toubro (L&T) made first indigenously designed and manufactured ' Full Span Launching Equipment-Straddle Carrier and Girder Transporter' to expedite the construction of viaduct for Mumbai- Ahmedabad High Speed Rail corridor. As of 29 September the stretch from Surat to Bilimora is expected to be operational by 2026, while the rest of Gujarat's portion is expected to be completed by 2024. * October : The joint venture of
IRCON International Ircon International, or Indian Railway Construction Limited (IRCON), is an Indian engineering & construction corporation, specialized in transport infrastructure. The public sector undertaking was established in 1976, by the Indian Railways und ...
and DRA Infracon won package C7 on 4 October comprising viaduct between Anand and Sabarmati, including 2 HSR stations at Sabarmati and Ahmedabad. NHSRCL then invited the bids for the tunnelling work on 21 kilometres underground, including a 7 kilometre long undersea tunnel, as of 30 October. *November **2 November: Casting of 970-tonne full span
pre-stressed concrete Prestressed concrete is a form of concrete used in construction. It is substantially "prestressed" ( compressed) during production, in a manner that strengthens it against tensile forces which will exist when in service. Post-tensioned concreted i ...
(PSC) box girder launched at near Naslipore village,
Navsari district Navsari is an administrative district in the state of Gujarat in India, with its headquarters at the city of Navsari. The district covers an area of 2,211 square kilometres and was formed in 1997 after Valsad district was split into Valsad and N ...
, Gujarat. **25 November: NHSRCL erects first full span 40 m box girder for Mumbai-Ahmedabad HSR Corridor, near Navsari. *December: NHSRCL had acquired 40.39% of the total land required for the project in Maharashtra. It was said that the construction work would not commence until 80-90% of the land is acquired. While in the case of Gujarat, 98.5% of the land was acquired.


2022

*January : ** 18 January : 46.71% of the total land required in the state of Maharashtra was acquired by NHSRCL from districts of
Palghar Palghar () is a town in the Konkan division of Maharashtra state, India and a municipal council. It is in the Mumbai Metropolitan Region, and since 2014 it has been the administrative capital of the Palghar district. Palghar lies on the West ...
and
Thane Thane (; also known as Thana, the official name until 1996) is a metropolitan city in Maharashtra, India. It is situated in the north-eastern portion of the Salsette Island. Thane city is entirely within Thane taluka, one of the seven taluk ...
. The land in the suburbs of Mumbai as well as 4.82 hectares of land in Bandra Kurla Complex was yet to be acquired. ** 21 January : First track contract signed by NHSRCL with contractor
IRCON International Ircon International, or Indian Railway Construction Limited (IRCON), is an Indian engineering & construction corporation, specialized in transport infrastructure. The public sector undertaking was established in 1976, by the Indian Railways und ...
to design, supply and construct the tracks. Two Japanese companies namely, Japanese Railway Track Consultants (JRTC) and Japanese Railway Technical Service (JARTS) work closely with IRCON. This contract covers about 47% of the total length of the project starting from Maharashtra- Gujarat Border to
Vadodara Vadodara (), also known as Baroda, is the second largest city in the Indian state of Gujarat. It serves as the administrative headquarters of the Vadodara district and is situated on the banks of the Vishwamitri River, from the state capita ...
in Gujarat. ** 23 January : According to a Media report, around 13 kilometres of Pier work had been completed and another stretch of piling-up or casting was in the process. *February : ** 3 February : The land acquisition was almost completed in Gujarat with 99.4% of the total land being acquired. Out of 736 hectares of land that was to be acquired in Gujarat, only 6.6 hectares of land was pending. In Maharashtra, land acquisition was nearly 60% complete. However, the important lands in suburban Mumbai were yet to be acquired. ** 9 February : NHSRCL awarded ₹ 2,460.88 worth of contract for L&T to design and develop 8 km of the viaduct and a station in
Vadodara Vadodara (), also known as Baroda, is the second largest city in the Indian state of Gujarat. It serves as the administrative headquarters of the Vadodara district and is situated on the banks of the Vishwamitri River, from the state capita ...
. This marked the successful awarding of 100% civil contracts for the construction of alignments in Gujarat, including eight stations and two rolling stock depots at Sabarmati and Surat respectively. * June: ** 6 June: Around 90.3% of the total required land (98.78% of the land required in Gujarat, and 71.49% in Maharashtra) has been acquired. First train is expected to run, on a 50 km (31 mi) section, between Surat and Bilimora, in 2026. *July: **15 July: Maha govt clears issues related to land acquisition. The newly formed government has directed the officials to resolve all the issues including transfer of land for underground station and tunnel shaft by September. ** 25 July: Japan awards ₹6000 Crores ODA loan for the project. * September: **22 September 2022: About 96 percent of land needed for MAHSR project acquired in state of Maharashtra . NHSRCL has got possession of 71% land in state. The works in the state are slated to start by 2022 end. * October **9 October 2022: As of now about 6.7 km of viaduct is completed, piles cast on 183.3 km , foundation over 104.3 km and piers over a stretch of 93 km in state of Gujarat. *December **15 December 2022: As of now of the total land acquired for the project is 1,374.20 Ha out of the required 1,392.63 Ha. Which is about 98.68%.In Gujarat, 943.53 Ha out of 954.3 Ha has been acquired, accounting for 98.87% of the total land required in the state. In Dadra and Nagar Haveli, the entire 7.90 Ha land and in Maharashtra, 422.77 Ha out of 430.45 Ha (98.2%) has been acquired.


See also


References


External links


Preliminary Study


* ttps://www.openstreetmap.org/relation/8304354 OpenStreetMap with route of Mumbai–Ahmedabad high-speed rail corridor
Permanent link
{{DEFAULTSORT:Mumbai - Ahmedabad high-speed passenger corridor High-speed railway lines in India Standard gauge railways in India Rail transport in Maharashtra Rail transport in Gujarat Proposed railway lines in India Modi administration initiatives Rail transport in Mumbai Transport in Ahmedabad India–Japan relations 2028 in rail transport