MBTA Orange Line
   HOME

TheInfoList



OR:

The Orange Line is a
rapid transit Rapid transit or mass rapid transit (MRT), also known as heavy rail or metro, is a type of high-capacity public transport generally found in urban areas. A rapid transit system that primarily or traditionally runs below the surface may be ...
line operated by the
Massachusetts Bay Transportation Authority The Massachusetts Bay Transportation Authority (abbreviated MBTA and known colloquially as "the T") is the public agency responsible for operating most public transportation services in Greater Boston, Massachusetts. The MBTA transit network in ...
(MBTA) as part of the MBTA subway system. The line runs south on the surface from Oak Grove station in Malden, Massachusetts through Malden and Medford, paralleling the
Haverhill Line The Haverhill Line (formerly named the Haverhill/Reading Line) is a branch of the MBTA Commuter Rail system, running north from downtown Boston, Massachusetts through the cities and towns of Malden, Melrose, Wakefield, Reading, Wilmington, And ...
, then crosses the
Mystic River The Mystic River is a riverU.S. Geological Survey. National Hydrography Dataset high-resolution flowline dataThe National Map accessed April 1, 2011 in Massachusetts, in the United States. In Massachusett, means "large estuary," alluding to t ...
on a bridge into Somerville, then into Charlestown. It passes under the
Charles River The Charles River ( Massachusett: ''Quinobequin)'' (sometimes called the River Charles or simply the Charles) is an river in eastern Massachusetts. It flows northeast from Hopkinton to Boston along a highly meandering route, that doubles b ...
and runs through
Downtown Boston Downtown Boston is the central business district of Boston, Massachusetts, United States. The city of Boston was founded in 1630. The largest of the city's commercial districts, Downtown is the location of many corporate or regional headquarters; ...
in the Washington Street Tunnel. The line returns to the surface in the South End, then follows the Southwest Corridor southwest in a cut through Roxbury and
Jamaica Plain Jamaica Plain is a neighborhood of in the City of Boston, Massachusetts, United States. Settled by Puritans seeking farmland to the south, it was originally part of the former Town of Roxbury, now also a part of the City of Boston. The commun ...
to Forest Hills station. The Orange Line operates during normal MBTA service hours (all times except late nights) with six-car trains. A 120-car fleet built in 1979–1981 is being replaced with a 152-car
CRRC CRRC Corporation Limited (known as CRRC) is a Chinese state-owned and publicly traded rolling stock manufacturer. It is the world's largest rolling stock manufacturer in terms of revenue, eclipsing its major competitors of Alstom and Siemens. I ...
fleet from 2018 to 2023. The Orange Line is fully grade-separated; trains are driven by operators with
automatic train control Automatic train control (ATC) is a general class of train protection systems for railways that involves a speed control mechanism in response to external inputs. For example, a system could effect an emergency brake application if the driver d ...
for safety. Wellington Carhouse in Medford is used for heavy maintenance and storage; a small yard at Forest Hills is also used for storage. All 20 Orange Line stations are fully
accessible Accessibility is the design of products, devices, services, vehicles, or environments so as to be usable by people with disabilities. The concept of accessible design and practice of accessible development ensures both "direct access" (i. ...
. Averaging 201,000 weekday passengers in 2019, the Orange Line has the second-highest ridership of the MBTA subway lines. The Orange Line originated as the Main Line Elevated of the
Boston Elevated Railway The Boston Elevated Railway (BERy) was a streetcar and rapid transit railroad operated on, above, and below, the streets of Boston, Massachusetts and surrounding communities. Founded in 1894, it eventually acquired the West End Street Rai ...
, which was built in 1901. It consisted of the
Charlestown Elevated The Charlestown Elevated was a segment of the MBTA Orange Line rapid transit line that ran from the Canal Street Incline in downtown Boston, Massachusetts through Charlestown to a terminal in Everett, Massachusetts. It opened in June 1901 and ...
,
Atlantic Avenue Elevated The Atlantic Avenue Elevated was an elevated railway around the east side of Downtown Boston, Massachusetts, providing a second route for the Boston Elevated Railway's Main Line Elevated (now the MBTA's Orange Line) around the Washington Street ...
,
Washington Street Elevated The Washington Street Elevated was an elevated segment of Boston's Massachusetts Bay Transportation Authority subway system, comprising the southern stretch of the Orange Line. It ran from Chinatown through the South End and Roxbury, ending i ...
, and a portion of the previously-built
Tremont Street subway The Tremont Street subway in Boston's MBTA subway system is the oldest subway tunnel in North America and the third oldest still in use worldwide to exclusively use electric traction (after the City and South London Railway in 1890, and the Bud ...
. All of the original route has been replaced, beginning with the Washington Street Tunnel replacing the Tremont Street subway in 1908. The Washington Street Elevated was extended from to Forest Hills in 1909, with an
infill station An infill station (sometimes in-fill station) is a train station built on an existing passenger rail, rapid transit, or light rail line to address demand in a location between existing stations. Such stations take advantage of existing train serv ...
at in 1912; the Charlestown Elevated was extended from to in 1919. The Atlantic Avenue Elevated was closed in 1938. The newly formed MBTA assigned colors to its subway lines in 1965, with the Main Line becoming the Orange Line. The Charlestown Elevated was closed in 1975; it was replaced by the Haymarket North Extension, which opened in phases from 1975 to 1977. The Southwest Corridor replaced the Washington Street Elevated in 1987, using an alignment originally intended for Interstate 95, completing the modern Orange Line alignment. The downtown stations were lengthened in the 1980s to allow six-car trains. Accessibility modifications began with some of those stations and were completed in 2005. opened as an infill station in 2014. The Orange Line has struggled with reliability issues, including aging infrastructure and trains, since the 2010s. Despite the ongoing fleet replacement, several prominent incidents occurred in 2022. The entire Orange Line was replaced with buses from August 19 to September 18, 2022, to allow for accelerated repairs.


History


Construction

The Main Line of the electric
Boston Elevated Railway The Boston Elevated Railway (BERy) was a streetcar and rapid transit railroad operated on, above, and below, the streets of Boston, Massachusetts and surrounding communities. Founded in 1894, it eventually acquired the West End Street Rai ...
opened in segments, starting in 1901. It proceeded from
Sullivan Square Sullivan Square is a traffic circle located at the north end of the Charlestown neighborhood of Boston, Massachusetts. It is named after James Sullivan, an early 19th-century Governor of Massachusetts. Sullivan Square station on the MBTA Oran ...
along the
Charlestown Elevated The Charlestown Elevated was a segment of the MBTA Orange Line rapid transit line that ran from the Canal Street Incline in downtown Boston, Massachusetts through Charlestown to a terminal in Everett, Massachusetts. It opened in June 1901 and ...
to the Canal Street incline near
North Station North Station is a commuter rail and intercity rail terminal station in Boston, Massachusetts. It is served by four MBTA Commuter Rail lines – the Fitchburg Line, Haverhill Line, Lowell Line, and Newburyport/Rockport Line – and the Amtrak ...
. It was carried underground by the
Tremont Street subway The Tremont Street subway in Boston's MBTA subway system is the oldest subway tunnel in North America and the third oldest still in use worldwide to exclusively use electric traction (after the City and South London Railway in 1890, and the Bud ...
(now part of the Green Line), returning above ground at the Pleasant Street incline (now closed, located just south of
Boylston station Boylston station (also signed as Boylston Street) is a light rail station on the MBTA Green Line in downtown Boston, Massachusetts, located on the southeast corner of Boston Common at the intersection of Boylston Street and Tremont Street. A ...
). A temporary link connected from there to the
Washington Street Elevated The Washington Street Elevated was an elevated segment of Boston's Massachusetts Bay Transportation Authority subway system, comprising the southern stretch of the Orange Line. It ran from Chinatown through the South End and Roxbury, ending i ...
, which in 1901 ran from this point via Washington Street to Dudley Square (which is most of what is now Phase 1 of the Silver Line). Also in 1901, the
Atlantic Avenue Elevated The Atlantic Avenue Elevated was an elevated railway around the east side of Downtown Boston, Massachusetts, providing a second route for the Boston Elevated Railway's Main Line Elevated (now the MBTA's Orange Line) around the Washington Street ...
opened, branching at Causeway Street to provide an alternate route through downtown Boston (along the shoreline, where today there is no rail transit) to the Washington Street Elevated. In 1908, a new Washington Street Tunnel opened, allowing Main Line service to travel from the
Charlestown Elevated The Charlestown Elevated was a segment of the MBTA Orange Line rapid transit line that ran from the Canal Street Incline in downtown Boston, Massachusetts through Charlestown to a terminal in Everett, Massachusetts. It opened in June 1901 and ...
, underground via an additional new portal at the Canal Street incline, under downtown Boston and back up again to meet the Washington Street Elevated and Atlantic Avenue Elevated near Chinatown. The stations were richly decorated with tile work, mosaics, and copper; after criticism of the large
Tremont Street subway The Tremont Street subway in Boston's MBTA subway system is the oldest subway tunnel in North America and the third oldest still in use worldwide to exclusively use electric traction (after the City and South London Railway in 1890, and the Bud ...
headhouses, most entrances were comparatively modest and set into buildings. Use of the parallel Tremont Street subway was returned exclusively to
streetcar A tram (called a streetcar or trolley in North America) is a rail vehicle that travels on tramway tracks on public urban streets; some include segments on segregated right-of-way. The tramlines or networks operated as public transport a ...
s. By 1909, the Washington Street Elevated had been extended south to . Trains from Washington Street were routed through the new subway, either all the way to Sullivan Square, or back around in a loop via the subway and then the Atlantic Avenue Elevated. In 1919, the same year that the Atlantic Avenue Elevated was partially damaged in Boston's Great Molasses Flood, the Charlestown Elevated was extended north from Sullivan Square to Everett, over surface right-of-way parallel to Alford Street/Broadway, with a drawbridge over the
Mystic River The Mystic River is a riverU.S. Geological Survey. National Hydrography Dataset high-resolution flowline dataThe National Map accessed April 1, 2011 in Massachusetts, in the United States. In Massachusett, means "large estuary," alluding to t ...
. The Boston Elevated had long-term plans to continue this extension further north to Malden, a goal which would only be achieved decades later, under
public ownership State ownership, also called government ownership and public ownership, is the ownership of an industry, asset, or enterprise by the state or a public body representing a community, as opposed to an individual or private party. Public ownershi ...
and not via the Everett route.


Closure of Atlantic Avenue Elevated and ownership changes

Following a 1928 accident at a tight curve on Beach Street, the southern portion of the
Atlantic Avenue Elevated The Atlantic Avenue Elevated was an elevated railway around the east side of Downtown Boston, Massachusetts, providing a second route for the Boston Elevated Railway's Main Line Elevated (now the MBTA's Orange Line) around the Washington Street ...
, between South Station and Tower D on Washington Street, was closed (except for rush-hour trips from Dudley to North Station via the Elevated), breaking the loop; non-rush-hour Atlantic Avenue service was reduced to a shuttle between North and South Stations. In 1938, the remainder of the Atlantic Avenue Elevated was closed, leaving the subway as the only route through downtown – what is now the Orange Line between and stations. Ownership of the railway was transferred from the private Boston Elevated Railway to the public Metropolitan Transit Authority (MTA) in 1947; the MTA was itself reconstituted as the modern
Massachusetts Bay Transportation Authority The Massachusetts Bay Transportation Authority (abbreviated MBTA and known colloquially as "the T") is the public agency responsible for operating most public transportation services in Greater Boston, Massachusetts. The MBTA transit network in ...
(MBTA) in 1964.


Orange Line naming

The line was known as the Main Line Elevated under the
Boston Elevated Railway The Boston Elevated Railway (BERy) was a streetcar and rapid transit railroad operated on, above, and below, the streets of Boston, Massachusetts and surrounding communities. Founded in 1894, it eventually acquired the West End Street Rai ...
, and the Forest Hills–Everett Elevated (Route 2 on maps) under the
Metropolitan Transportation Authority The Metropolitan Transportation Authority (MTA) is a public benefit corporation responsible for public transportation in the New York City metropolitan area of the U.S. state of New York. The MTA is the largest public transit authority in th ...
. After taking over operations in August 1964, the MBTA began rebranding many elements of Boston's public transportation network. Colors were assigned to the rail lines on August 26, 1965, as part of a wider modernization developed by
Cambridge Seven Associates Cambridge Seven Associates, Inc. (stylized as CambridgeSeven, and sometimes as C7A) is an American architecture firm based in Cambridge, Massachusetts. Buildings designed by the firm have included academic, museum, exhibit, hospitality, transpo ...
. Peter Chermayeff assigned
red Red is the color at the long wavelength end of the visible spectrum of light, next to orange and opposite violet. It has a dominant wavelength of approximately 625–740 nanometres. It is a primary color in the RGB color model and a secondar ...
,
green Green is the color between cyan and yellow on the visible spectrum. It is evoked by light which has a dominant wavelength of roughly 495570 nm. In subtractive color systems, used in painting and color printing, it is created by a combi ...
, and
blue Blue is one of the three primary colours in the RYB colour model (traditional colour theory), as well as in the RGB (additive) colour model. It lies between violet and cyan on the spectrum of visible light. The eye perceives blue when ...
to the other three lines based on geographic features; however, according to Chermayeff, the Main Line El "ended up being orange for no particular reason beyond color balance." The firm originally planned for yellow instead of orange, but yellow was rejected after testing because yellow text was difficult to read on a white background. (Yellow was later used for MBTA bus service). The MBTA and transit historians later claimed that orange came from Orange Street, an early name for what is now part of Washington Street. In January and February 1967, the four original Washington Street Tunnel stations were renamed. Transfer stations were given the same name for all lines: Winter and Summer stations plus Washington on the Red Line became Washington, Milk and State plus Devonshire on the Blue Line became after the cross street, and Union and Friend plus Haymarket Square on the Green Line became after
Haymarket Square Haymarket Square may refer to: * Haymarket Square (Boston), in Boston * Haymarket Square (Chicago), in Chicago * Haymarket affair The Haymarket affair, also known as the Haymarket massacre, the Haymarket riot, the Haymarket Square riot, or ...
. Boylston Street was renamed Essex to avoid confusion with nearby
Boylston station Boylston station (also signed as Boylston Street) is a light rail station on the MBTA Green Line in downtown Boston, Massachusetts, located on the southeast corner of Boston Common at the intersection of Boylston Street and Tremont Street. A ...
on the Green Line. In May 1987, Essex was renamed after the adjacent Chinatown neighborhood, and Washington renamed after the adjacent shopping district. In March 2010, New England Medical Center station was renamed as two years after the eponymous hospital changed its name.


Rerouting of Charlestown and Everett service

The
Boston Transportation Planning Review Boston Transportation Planning Review (BTPR), published in 1972, was a transportation planning program for metropolitan Boston, Massachusetts, which was responsible for analyzing and redesigning the entire area-wide transit and highway system in ...
looked at the line in the 1970s, considering extensions to reach the
Route 128 The following highways are numbered 128: Canada * New Brunswick Route 128 * Ontario Highway 128 (former) * Prince Edward Island Route 128 Costa Rica * National Route 128 India * National Highway 128 (India) Japan * Japan National Route 128 ...
beltway A ring road (also known as circular road, beltline, beltway, circumferential (high)way, loop, bypass or orbital) is a road or a series of connected roads encircling a town, city, or country. The most common purpose of a ring road is to assist i ...
, with termini at
Reading Reading is the process of taking in the sense or meaning of letters, symbols, etc., especially by sight or touch. For educators and researchers, reading is a multifaceted process involving such areas as word recognition, orthography (spelling ...
in the north and Dedham in the south. As a result of this review, the
Charlestown Elevated The Charlestown Elevated was a segment of the MBTA Orange Line rapid transit line that ran from the Canal Street Incline in downtown Boston, Massachusetts through Charlestown to a terminal in Everett, Massachusetts. It opened in June 1901 and ...
– which served the Charlestown neighborhood north of downtown Boston and the inner suburb of Everett – was demolished and replaced in 1975. The Haymarket North Extension rerouted the Orange Line through an underwater crossing of the
Charles River The Charles River ( Massachusett: ''Quinobequin)'' (sometimes called the River Charles or simply the Charles) is an river in eastern Massachusetts. It flows northeast from Hopkinton to Boston along a highly meandering route, that doubles b ...
. Service in Charlestown was replaced with service along
Boston and Maine The Boston and Maine Railroad was a U.S. Class I railroad in northern New England. Originally chartered in 1835, it became part of what was the Pan Am Railways network in 1983 (most of which was purchased by CSX in 2022). At the end of 1970, ...
tracks routed partially beneath an elevated section of Interstate 93, ultimately to and then to in Malden, Massachusetts, instead of Everett. Rail service to Everett was replaced with buses. The extension was unique among Boston transit lines as it contained a third express track between Wellington and Community College stations. These stations, along with Sullivan Sq, have two island platform stations as opposed to the more normal single island stations found on the southern side of the Orange Line. This express track was designed for the never-built extension north of Oak Grove to Reading. The third track would have allowed peak-direction express service as well as places to terminate trains. Service north of Oak Grove was planned to have longer headways to account for the lower projected ridership. This extension was opposed by residents of Melrose who preferred restored commuter rail service. Because of this, the express track ends at Wellington and a single commuter rail track continues parallel to the Orange Line north to Reading.


Closure of Washington Street Elevated

Construction of Interstate 95 into downtown Boston was cancelled in 1972 after local protest over the necessary demolition. However, land for I-95's Southwest Corridor through Roxbury had already been cleared of buildings; moreover, the state had already committed to using this vacant land for transportation purposes. As a result, instead of an 8-lane Interstate highway with a relocated Orange Line running in its median (in a manner similar to the
Chicago Transit Authority The Chicago Transit Authority (CTA) is the operator of mass transit in Chicago, Illinois, United States, and some of its surrounding suburbs, including the trains of the Chicago 'L' and CTA bus service. In , the system had a ridership of , ...
's Dan Ryan, Congress, and O'Hare branches), the space would be occupied by the realigned Orange Line, a reconstructed three-track mainline for
Amtrak The National Railroad Passenger Corporation, doing business as Amtrak () , is the national passenger railroad company of the United States. It operates inter-city rail service in 46 of the 48 contiguous U.S. States and nine cities in Canada ...
's Northeast Corridor and MBTA Commuter Rail trains, and a linear park. After this re-routing was accomplished in 1987, the Washington Street Elevated was torn down, the last major segment of the original elevated line to be demolished. Between April 30 and May 3, 1987, the
Washington Street Elevated The Washington Street Elevated was an elevated segment of Boston's Massachusetts Bay Transportation Authority subway system, comprising the southern stretch of the Orange Line. It ran from Chinatown through the South End and Roxbury, ending i ...
south of the Chinatown station was closed to allow the Orange Line to be tied into the new Southwest Corridor. On May 4, 1987, the Orange Line was rerouted from the southern end of the Washington Street Tunnel onto the new Southwest Corridor. Instead of rising up to elevated tracks, it now veered west at the
Massachusetts Turnpike The Massachusetts Turnpike (colloquially "Mass Pike" or "the Pike") is a toll highway in the US state of Massachusetts that is maintained by the Massachusetts Department of Transportation (MassDOT). The turnpike begins at the New York state li ...
and followed the Pike and the old
Boston and Albany Railroad The Boston and Albany Railroad was a railroad connecting Boston, Massachusetts to Albany, New York, later becoming part of the New York Central Railroad system, Conrail, and CSX Transportation. The line is currently used by CSX for freight. Pa ...
right-of-way to the existing MBTA Commuter Rail stop at . It then continued along new tracks, partially covered and partially open but depressed, to . This MBTA right-of-way is also shared by
Amtrak The National Railroad Passenger Corporation, doing business as Amtrak () , is the national passenger railroad company of the United States. It operates inter-city rail service in 46 of the 48 contiguous U.S. States and nine cities in Canada ...
as part of the national Northeast Corridor intercity passenger rail service. While ending more or less at the same terminus (Forest Hills), the new routing passes significantly to the west of its previous route on Washington Street; local residents were promised replacement service. Originally, plans provided for light rail vehicles street running in mixed traffic, from Washington Street to Dudley Square, then diverting southeastward on Warren Street towards Dorchester. In 2002, Phase 1 of the Silver Line bus rapid transit was added to connect Washington Street to the downtown subways, attempting to address this service need. This replacement service was controversial, as many residents preferred the return of rail transportation.


Station renovations

In the mid-1980s, the MBTA spent $80 million to extend the platforms of seven Red Line and three Orange Line stations (,
Washington Washington commonly refers to: * Washington (state), United States * Washington, D.C., the capital of the United States ** A metonym for the federal government of the United States ** Washington metropolitan area, the metropolitan area centered o ...
, and ) to allow the use of six-car trains. Washington and Essex were made fully accessible, as was the northbound platform at Essex. The Southwest Corridor station opened in 1987 were all fully
accessible Accessibility is the design of products, devices, services, vehicles, or environments so as to be usable by people with disabilities. The concept of accessible design and practice of accessible development ensures both "direct access" (i. ...
. Six-car trains entered service on August 18, 1987. was also renovated around 1987. This left only , five stations on the Haymarket North Extension, and the southbound platform at Chinatown inaccessible by the 1990 passage of the Americans with Disabilities Act. Construction at and began in 1991. was retrofitted with elevators in 2000. The 1975-built was expanded into a "superstation" with a cross-platform transfer to the Green Line; elevators were in installed in 2001, though the Green Line did not use the station until 2004. The southbound platform at Chinatown was made accessible in 2002. Renovations to and were completed in 2005, making the Orange Line the first of the four original MBTA subway lines to become fully accessible.


Assembly

In the early 2000s, Somerville began planning an
infill In urban planning, infill, or in-fill, is the rededication of land in an urban environment, usually open-space, to new construction. Infill also applies, within an urban polity, to construction on any undeveloped land that is not on the urban ma ...
station between and to serve the new Assembly Square development. The $57 million station was funded by the state's Executive Office of Housing and Economic Development, FTA Section 5309 New Starts program, and Federal Realty Investment Trust (the developer of Assembly Square). Construction began in late 2011 and finished in mid 2014. The new station, , opened on September 2, 2014. It was the first new station on the MBTA subway system since 1987.


Reliability issues and repairs

During the unusually brutal winter of 2014–2015, the entire MBTA system was shut down on several occasions by heavy snowfalls. The aboveground sections of the Orange and Red lines were particularly vulnerable due to their exposed third rail, which iced over during storms. When a single train stopped due to power loss, other trains soon stopped as well; without continually running trains pushing snow off the rails, the lines were quickly covered in snow. (Because the Blue Line was built with overhead lines on its surface section due to its proximity to corrosive salt air, it was not subject to icing issues.) Starting in 2015, the MBTA began implementing its $83.7 million Winter Resiliency Program, much of which focused on preventing similar issues with the Orange and Red lines. The Southwest Corridor section of the Orange Line is located in a trench and is protected from the worst weather, but the 1970s-built Haymarket North Extension had older infrastructure and was in worse shape. From north, it is exposed to the weather and largely built on an embankment, rendering it more vulnerable. That section is receiving new heated third rail, switch heaters, and snow fences to reduce the impacts of inclement weather. The work requires
bustitution A rail replacement bus service uses buses to replace a passenger train service on a temporary or permanent basis. The train service that is replaced may be of any type such as light rail, tram, streetcar, commuter rail, regional rail or hea ...
of the line from Sullivan Square to Oak Grove on certain weeknights and weekends. In October 2018, the MBTA awarded a $218 million signal contract for the Red and Orange Lines, which was planned to allow 4.5-minute headways on the Orange Line beginning in 2022. On July 22, 2022, an Orange Line train caught fire while crossing the
Mystic River The Mystic River is a riverU.S. Geological Survey. National Hydrography Dataset high-resolution flowline dataThe National Map accessed April 1, 2011 in Massachusetts, in the United States. In Massachusett, means "large estuary," alluding to t ...
. Passengers had to jump out of the train onto the tracks, and one woman jumped into the river below. There were no injuries or casualties. A metal sill along the underside of the train came loose and came into contact with the third rail, igniting sparks. Following various reliability issues on the Orange Line, the MBTA announced that it would close the entire line for renovations from August 19 to September 18, 2022. During the closure, the MBTA conducted accelerated repairs to track, ties, signals, and concrete walls, as well as replacing two crossovers. This was intended to remove speed restrictions and improve safety and reliability. The shutdown also gave time for more new CRRC cars to be delivered and put into service; after the closure, service on the line resumed with new trains almost all the time. However, the work was not enough to eliminate all slow zones, and temporary slow zones were added where work was performed. By early October, a round trip on the full line was 13 minutes slower than before the shutdown, and 20 minutes slower than it would be without any slow zones. On October 25, the MBTA sent a letter to Senator
Ed Markey Edward John Markey (born July 11, 1946) is an American lawyer, politician, and former Army reservist who has served as the junior United States senator from Massachusetts since 2013. A member of the Democratic Party, he was the U.S. representa ...
, who had been investigating the project, detailing work needed during November and December to lift remaining slow zones, ranging from always-planned to unexpectedly necessary tasks.


Historical routes


Station listing


Rolling stock

The Orange Line is
standard-gauge A standard-gauge railway is a railway with a track gauge of . The standard gauge is also called Stephenson gauge (after George Stephenson), International gauge, UIC gauge, uniform gauge, normal gauge and European gauge in Europe, and SGR in Ea ...
heavy rail and uses a
third rail A third rail, also known as a live rail, electric rail or conductor rail, is a method of providing electric power to a railway locomotive or train, through a semi-continuous rigid conductor placed alongside or between the rails of a railway ...
for power. As of 2022, the fleet is undergoing replacement. The newer cars are being built by
CRRC CRRC Corporation Limited (known as CRRC) is a Chinese state-owned and publicly traded rolling stock manufacturer. It is the world's largest rolling stock manufacturer in terms of revenue, eclipsing its major competitors of Alstom and Siemens. I ...
in a newly-constructed plant in Springfield, Massachusetts, with 152 cars on order, along with additional cars for the Red Line. The older fleet was built between 1979 and 1981 by
Hawker Siddeley Canada Hawker Siddeley Canada was the Canadian unit of the Hawker Siddeley Group of the United Kingdom and manufactured railcars, subway cars, streetcars, aircraft engines and ships from the 1960s to 1980s. History Founded in 1962 as the Canadian divis ...
of
Thunder Bay Thunder Bay is a city in and the seat of Thunder Bay District, Ontario, Canada. It is the most populous municipality in Northwestern Ontario and the second most populous (after Greater Sudbury) municipality in Northern Ontario; its population i ...
,
Ontario Ontario ( ; ) is one of the thirteen provinces and territories of Canada.Ontario is located in the geographic eastern half of Canada, but it has historically and politically been considered to be part of Central Canada. Located in Central C ...
, Canada, and are based on the PA3 model used by
PATH A path is a route for physical travel – see Trail. Path or PATH may also refer to: Physical paths of different types * Bicycle path * Bridle path, used by people on horseback * Course (navigation), the intended path of a vehicle * Desire p ...
in
New Jersey New Jersey is a state in the Mid-Atlantic and Northeastern regions of the United States. It is bordered on the north and east by the state of New York; on the east, southeast, and south by the Atlantic Ocean; on the west by the Delaware ...
. There were 120 older cars prior to replacement, numbered 01200-01319. All in-service Orange Line trains run in six-car consists. Cars of both fleets are 65 feet (20 m) long and 9 ft 3 in (2.8 m) wide, with three pairs of doors on each side. , weekday peak and afternoon service operates on 7-minute headways, with headways ranging from 8 to 10 minutes at other times. Vehicle utilization ranges between 8 trains (48 cars) and 15 trains (90 cars). The "T" previously had a fleet of Pullman-Standard heavy rail cars for the Orange Line. These cars, known as 01100s, had been in service since the 1950s, and saw service on both the elevated and the northern extension before they were retired in 1981. Several remained on the property for some time before being scrapped. The 01100 cars were a favorite for fans, as the small motorman's cab enabled passengers to stand at the front for an operator's-eye view.


New CRRC trains

In late 2008, the MBTA began the planning process for new Orange and Red Line vehicles. The agency originally planned for a simultaneous order for 146 Orange Line cars (to replace the whole fleet) and 74 Red Line cars (to replace the older 1500 and 1600 series cars). A similar order was used in the late 1970s for the current Orange Line cars and the old Blue Line cars, ordered at the same time and largely identical except for size and color. In October 2013, MassDOT announced plans for a $1.3 billion subway car order for the Orange and Red Lines, which would provide 152 new Orange Line cars to replace the existing 120-car fleet and add more frequent service. On October 22, 2014, the MassDOT Board awarded a $566.6 million contract to a China based manufacturer CNR (which became part of
CRRC CRRC Corporation Limited (known as CRRC) is a Chinese state-owned and publicly traded rolling stock manufacturer. It is the world's largest rolling stock manufacturer in terms of revenue, eclipsing its major competitors of Alstom and Siemens. I ...
the following year) to build 152 replacement railcars for the Orange Line, as well as additional cars for the Red Line. The other bidders were Bombardier Transportation,
Kawasaki Heavy Industries (or simply Kawasaki) is a Japanese public multinational corporation manufacturer of motorcycles, engines, heavy equipment, aerospace and defense equipment, rolling stock and ships, headquartered in Chūō, Kobe and Minato, Tokyo, Japan. It is ...
and Hyundai Rotem. CNR began building the cars at a new manufacturing plant in Springfield, Massachusetts, with initial deliveries expected in 2018 and all cars in service by 2023. The Board forwent federal funding to allow the contract to specify the cars be built in Massachusetts, to create a local railcar manufacturing industry. In conjunction with the new rolling stock, the remainder of the $1.3 billion allocated for the project would pay for testing, signal improvements and expanded maintenance facilities, as well as other related expenses. Sixty percent of the car's components are sourced from the United States. After delays due to issues with the train's control system, the first new train entered revenue service on August 14, 2019; Replacement of the signal system is expected to be complete by 2022 on the Orange Line; the total cost is $218 million for both the Red and Orange Lines. While waiting for new cars, service has deteriorated due to maintenance problems with the old cars. The number of trains at rush hour was reduced from 17 (102 cars) to 16 (96 cars) in 2011; in the same year, daily ridership surpassed 200,000. Increased running times – largely due to longer dwell times from increased ridership – resulted in headways being lengthened from 5 minutes before 2011 to 6 minutes in 2016. The increased fleet size with the new trains will allow headways to be reduced to between 4 and 5 minutes at peak. In the interim, a 2016 test of platform markings at North Station which show boarding passengers where to stand to avoid blocking alighting passengers resulted in a one-third decrease in dwell times. The new cars have faced several issues since their August entry into service. In November 2019, a car derailed while undergoing initial testing at the Wellington yard. The last car of a six car trainset had jumped the rails while going over a
switch In electrical engineering, a switch is an electrical component that can disconnect or connect the conducting path in an electrical circuit, interrupting the electric current or diverting it from one conductor to another. The most common type of ...
, however no major damage had been reported. Several months earlier, the first two trainsets were taken out of service due to safety issues following the inadvertent opening of a passenger door while the train was in motion. Cars were also rechecked in early December 2019, after issues with sounds combined with passenger overload necessitated removal from service. The first train was restored to service in January 2020. The trains were pulled again on March 16, 2021, after a derailment involving one of the cars. Buses replaced trains around the site of the derailment until April 12. The CRRC cars remained out of service as of July 2021; defective side bearer pads were identified as a contributing factor. These dampen the movements of the trucks (which include the wheels) with respect to the car bodies, but were found to be wearing in such a way as to produce too much friction. The first of the CRRC trainsets was returned to revenue service on August 20, after modifications were approved by the MBTA's Safety Department and the Department of Public Utilities. The new cars were again removed from service on May 19–23, 2022, after a braking issue on one car due to an incorrectly installed bolt, and again between June and July 2022 due to a battery failure. The CRRC contract requires delivery of all Orange Line cars by January 2022, with a fine of $500 per day per car for late deliveries. Delays began to accumulate in 2019, and then facilities in China and Springfield had to shut down and operate at reduced capacity for parts of 2020 due to the
COVID-19 pandemic The COVID-19 pandemic, also known as the coronavirus pandemic, is an ongoing global pandemic of coronavirus disease 2019 (COVID-19) caused by severe acute respiratory syndrome coronavirus 2 (SARS-CoV-2). The novel virus was first identi ...
. As of September 2022, 78 of 152 new cars had been put in service on the Orange Line. This was enough for service almost all the time because of the rush hour service cap introduced after an FTA safety audit identified insufficient staffing of subway dispatchers. The MBTA indicated it would assess which delays were the fault of the contractor at the end of the contract. The first #12 fleet cars were sent to scrap on September 22, 2022. Almost all will be processed by the contractor Costello to remove hazardous materials and be recycled; two have been offered to the
Seashore Trolley Museum Seashore Trolley Museum, located in Kennebunkport, Maine, United States, is the world's first and largest museum of mass transit vehicles. While the main focus of the collection is trolley cars (trams), it also includes rapid transit trains, ...
in
Kennebunkport, Maine Kennebunkport is a resort town in York County, Maine, United States. The population was 3,629 people at the 2020 census. It is part of the Portland– South Portland– Biddeford metropolitan statistical area. The town center, the are ...
.Were you hoping for an Orange Line train diner? It's not likely as MBTA scraps old cars
/ref>


Facilities

The Orange Line has two tracks for most of its length; a third track is present between Wellington station and the Charles River portal. This track is used to bypass construction on the other two tracks and for testing newly delivered cars for the Orange Line. The primary maintenance and storage facility is at Wellington station. Had the Orange Line been extended to
Reading Reading is the process of taking in the sense or meaning of letters, symbols, etc., especially by sight or touch. For educators and researchers, reading is a multifaceted process involving such areas as word recognition, orthography (spelling ...
, the third track would have been the northbound local track, and the present-day northbound track would likely have become a bi-directional express track.


References


External links


Official MBTA Orange Line information
* ttp://world.nycsubway.org/us/boston/orange.html Orange Linefrom nycsubway.org – Includes detailed description and photos of current Orange Line

* ttp://www.cityofboston.gov/news/default.aspx?id=5823 "An Elevated View: The Orange Line", Boston Public Library exhibit about Orange Line elevated line history, October 2012 – January 2013
BPL description
) {{DEFAULTSORT:Orange Line (Mbta) Railway lines opened in 1901 1901 establishments in Massachusetts Standard gauge railways in the United States 600 V DC railway electrification