Line 6 (Beijing Subway)
   HOME

TheInfoList



OR:

Line 6 of the
Beijing Subway The Beijing Subway is the rapid transit system of Beijing Municipality that consists of 25 lines including 20 rapid transit lines, two airport rail links, one maglev line and 2 light rail lines, and 463 stations. The rail network extends ...
() is a
rapid transit Rapid transit or mass rapid transit (MRT), also known as heavy rail or metro, is a type of high-capacity public transport generally found in urban areas. A rapid transit system that primarily or traditionally runs below the surface may be ...
rail line in
Beijing } Beijing ( ; ; ), Chinese postal romanization, alternatively romanized as Peking ( ), is the Capital city, capital of the China, People's Republic of China. It is the center of power and development of the country. Beijing is the world's Li ...
. The line runs from Jin'anqiao in
Shijingshan District Shijingshan District () is an urban district of the municipality of Beijing. It lies to the west of the urban core of Beijing, and is part of the Western Hills area, bordering the districts of Haidian to the northeast and east, Fengtai to the so ...
to Lucheng in Tongzhou District. It serves important residential areas such as Changying, Chaoqing, and Dingfuzhuang, in addition to important commercial and business areas such as Financial Street, Beijing CBD and the sub-administrative center in Tongzhou District. Like Line 7, Line 6 provides relief to the parallel Line 1, which is the second most used subway line in Beijing, after Line 10. Line 6 is the second longest subway line in Beijing (only Line 10 is longer). A complete journey from end to end takes about an hour and 25 minutes on a local train and express trains reducing end to end travel time by 7 minutes. Line 6 uses 8-car size B train sets accommodating 1,960 people. The trains are capable of reaching the speed of . Stations to the east of the 3rd Ring Road to Tongzhou are more widely spaced, the furthest being apart. Line 6 also has the deepest station in the network, Dongsi station, which is 34 meters underground. The line uses overhead catenary as opposed to third rail used on other lines. Some of the station arrangements were the first of their kind in Beijing. Beijing's first split platform station, Nanluoguxiang station, and stations equipped with passing tracks, opened on Line 6. Line 6 was projected to have a short term volume of 700,000 passengers per day and a long term daily passenger traffic of 1.4 million passengers. Though due to its alignment through some of Beijing's densest residential neighborhoods and paralleling the overcapacity and busy Line 1, some industry leaders believed that the average daily passenger flow of the line may reach 1.4 million passengers per day sooner than expected. Within the first few months of operation, weekday ridership was at 320,000 passengers. However, by 2014, daily ridership had risen to 700,000 with sections operating at 100% capacity during rush hour. Authorities responded by adding more trains and shortening headway to reduce crowding on the line. By 2019, daily average weekday ridership on Line 6 exceeds 1 million riders.


Stations

Stations from west to east:(Chinese
Beijing Infrastructure Investment Co., Ltd. Line 6 Plan, ''BII''
Accessed on September 6, 2008
, , , 0.000 , 0.000 , rowspan="4" , Shijingshan , - , align="center" , ● , align="center" , ● , , , , 1.438 , 1.438 , - , align="center" , ● , align="center" , ● , , , , 0.839 , 2.277 , - , align="center" , ● , align="center" , ● , , , , 1.792 , 4.069 , - , align="center" , ● , align="center" , ● , , , , 1.794 , 5.863 , rowspan="2" style="border-bottom:solid 0 lightgray;" , , - , align="center" , ● , align="center" , ● , , , , 2.276 , 8.139 , - , align="center" , ● , align="center" , ● , , , , 2.140 , 10.279 , rowspan="4" style="border-top:solid 0;" , Haidian , - , align="center" , ● , align="center" , ● , , , , , 1.508 , 11.787 , - , align="center" , ● , align="center" , ● , , , , , 1.431 , 13.218 , - , align="center" , ● , align="center" , ● , , , , , 1.166 , 14.384 , - bgcolor="lightgrey" , align="center" , | , align="center" , | , ' , , , , — , — , Haidian / Xicheng , - , align="center" , ● , align="center" , ● , , , , , 1.664 , 16.048 , rowspan="4" , Xicheng , - , align="center" , ● , align="center" , ● , , , , , 0.887 , 16.935 , - , align="center" , ● , align="center" , ● , , , , , 1.443 , 18.378 , - , align="center" , ● , align="center" , ● , , , , , 1.321 , 19.699 , - , align="center" , ● , align="center" , ● , , , , , 1.349 , 21.048 , rowspan="2" , Dongcheng , - , align="center" , ● , align="center" , ● , , , , , 1.937 , 22.985 , - , align="center" , ● , align="center" , ● , , , , , 1.399 , 24.384 , Dongcheng / Chaoyang , - , align="center" , ● , align="center" , ● , , , , , 1.668 , 26.052 , rowspan="9" , Chaoyang , - , align="center" , ● , align="center" , ● , , , , , 0.845 , 26.897 , - , align="center" , ● , align="center" , ● , , , , , 1.450 , 28.347 , - , align="center" , ● , align="center" , ● , , , , , 2.036 , 30.383 , - , align="center" , ● , align="center" , ● , , , , , 1.282 , 31.665 , - , align="center" , ● , align="center" , | , , , , , 3.999 , 35.664 , - , align="center" , ● , align="center" , | , , , , , 1.238 , 36.902 , - , align="center" , ● , align="center" , | , , , , , 1.854 , 38.756 , - , align="center" , ● , align="center" , | , , , , , 1.405 , 40.161 , - , align="center" , ● , align="center" , | , , , , , 2.115 , 42.276 , rowspan="9" , Tongzhou , - , align="center" , ● , align="center" , | , , , , , 2.557 , 44.833 , - bgcolor="lightgrey" , align="center" , | , align="center" , | , ' , , , , — , — , - , align="center" , ● , align="center" , | , , , , , 3.011 , 47.844 , - , align="center" , ● , align="center" , | , , , , , 1.599 , 49.443 , - , align="center" , ● , align="center" , ● , , , , , 0.929 , 50.372 , - , align="center" , ● , align="center" , ● , , , , , 1.346 , 51.718 , - , align="center" , ● , align="center" , ● , , , , , 1.194 , 52.912 , -bgcolor="lightgrey" , align="center" , , align="center" , , ' , , , , — , — , - style="background:#; height: 2pt" , colspan="9" ,


History


Planning

Line 6 was originally planned to be an east–west line passing under Chaoyang Avenue continuing straight westward. However, this alignment would make the central section of Line 6 tunnel extremely close to the
Forbidden City The Forbidden City () is a palace complex in Dongcheng District, Beijing, China, at the center of the Imperial City of Beijing. It is surrounded by numerous opulent imperial gardens and temples including the Zhongshan Park, the sacrifi ...
. Issues of historic conservation and protection were raised against the proposed alignment. To avoid damaging cultural relics in the area, the entire western and middle section of line 6 was shifted northward to Ping'an Avenue, forming the route of Line 6 today. As of October 2007, Line 6 was planned to feature both express and local stations, but those plans have not been incorporated into the construction of Phase I. Line 6 started construction on December 8, 2007, as one of the "horizontal" east–west lines of the "three-ring, four horizontal and five vertical and seven radial" Beijing Subway masterplan. Construction is planned in three phases, the first phase in central Beijing, followed by extensions into the eastern and western suburbs.


Phase I

In Phase I, Line 6 runs from Haidian Wuluju in
Haidian District Haidian District () is a district of the municipality of Beijing. It is mostly situated in northwestern Beijing, but also to a lesser extent in the west, where it has borders with Xicheng District and Fengtai District. It is 431 square km in ar ...
to Caofang in Chaoyang District following Linglong Road, Sanlihe Road, Chaoyang North Road, the west bank of the Grand Canal, and Yunhe East Road. In Phase I, there were 20 stations except the reserved
Erligou station Erligou station () is a station under construction on Line 6 and Line 16 of the Beijing Subway. History Erligou station did not enter into operation along with Line 6 Phase I on December 30, 2012. Both Line 6 and Line 16 platforms will open i ...
. Construction began in December 2007 and was completed in 2012. On March 22, 2010, the tunneling work on Line 6 commenced near Shilipu in Chaoyang District. Total investment for Phase I was estimated at ¥19.7 billion. Line 6 in Phase I was originally slated to have elevated tracks for , east of the 5th Ring Road, from Dingfuzhuang and Changying. After residents along the route raised concerns about train noise, planners reconsidered and ultimately decided to keep all of Phase I underground. This made the first phase of Line 6 completely underground.


Phase II (eastern extension)

As of November 2010, plans for Phase II contained plans for distinct express and local stations. In Phase II, which opened in 2014, Line 6 was extended further east by about through six stations from to in Tongzhou New Town. Beiyunhe Dong station was reserved for later opening. Like Phase I, the Phase II track is entirely underground. The extension was designed to have express and local services using passing tracks at select stations. However, due to a shortage of rolling stock, express services have yet to be implemented when the Phase II opens in 2014. In 2018, the government announced that sufficient rolling stock had arrived to begin implementing an express service. Express services started operating on March 31, 2020.


Phase III (western extension)

Line 6 was originally planned to terminate at
Cishousi Station Cishousi () is an interchange station on Line 6, Beijing Subway, Line 6 and Line 10, Beijing Subway, Line 10 of the Beijing Subway. This station opened on December 30, 2012. It is named after the nearby Pagoda of Cishou Temple. Station Layout ...
with the S1 Line continuing the line westward. In 2011, because of issues of low capacity and electromagnetic radiation concerns of Maglev technology, city planning authorities proposed to detach several stations from the S1 line. This would extend Line 6 west with six stations from Jin'anqiao to Haidian Wuluju (the western terminus of Phase I).(Chines
"地铁6号线将西延至杨庄东街"
2012-03-23
All stations are below ground. This replaced the S1 Line section between Cishousi and Pingguoyuan station. Later the plan was revised with Line 6 being further extended westward beyond Pingguoyuan to Jin'anqiao station, paralleling the S1 Line. The revision was formalized and submitted to the National Development and Reform Commission for review in March 2012. Phase III opened in 2018, along with Beiyunhedong station in Tongzhou. Plans for an interchange with Line 1 at Pingguoyuan were disrupted by a planned renovation of the station. When Line 6 Phase III entered operation, Pingguoyuan station was reserved. In December 2021, the station was opened as an interchange between Line 6 and Line S1. The station for Line 1 will open in 2023.


Opening timeline


Future Development


South extension of Phase II

The one-station Southern extension of Phase II from to Dongxiaoyingnan will be in length. Construction started on 30 August 2022. It is expected to open in 2025.


Rolling Stock


References

{{Beijing Subway Station , line6=yes Beijing Subway lines Railway lines opened in 2012 2012 establishments in China 1500 V DC railway electrification