Labuan–Menumbok Bridge
   HOME

TheInfoList



OR:

Labuan–Menumbok Bridge ( ms, Jambatan Labuan–Menumbok) or Labuan Bridge is a new planned bridge connecting Labuan Island in Federal Territory of Labuan and
Menumbok Menumbok is a sub-district in the west of the Malaysian state of Sabah which is also one of the three administrative parts of Kuala Penyu District. This town is also administered as a sub-district within the jurisdiction of the Kuala Penyu distr ...
in
Sabah Sabah () is a state of Malaysia located in northern Borneo, in the region of East Malaysia. Sabah borders the Malaysian state of Sarawak to the southwest and the North Kalimantan province of Indonesia to the south. The Federal Territory o ...
,
Malaysia Malaysia ( ; ) is a country in Southeast Asia. The federation, federal constitutional monarchy consists of States and federal territories of Malaysia, thirteen states and three federal territories, separated by the South China Sea into two r ...
.


History


Proposal and studies

The proposal to develop a bridge between Labuan and Sabah has been met with a positive welcomed by both residents in the island and Sabah as well from various local politicians. However at the time, there is still no commitment from the Sabah state government under
Barisan Nasional The National Front ( ms, Barisan Nasional; abbrev: BN) is a political coalition of Malaysia that was founded in 1973 as a coalition of centre-right and right-wing political parties. It is also the third largest political coalition with 30 ...
(BN) leadership to develop such project although a China's firm has shown an interest to build the bridge without any cash payment by only giving them a land swap near the proposed bridge area as a return. An economic investment vehicle linked with
Labuan Corporation Perbadanan Labuan or Labuan Corporation (PL) is a local authority which administrates the Federal Territory of Labuan, Malaysia. This agency is under Ministry of the Federal Territories. PL are responsible for public health and sanitation, waste ...
(LC) also willing to undertake the project for the same reason as the LC chairman, Rozman Isli has stated "any further indecision would result in higher cost to build the bridge in the future". Rozman as well has urging the Sabah state government to include the bridge development as part of the Sabah
Pan Borneo Highway Pan Borneo Highway ( ms, Lebuhraya Pan Borneo), also known as Trans-Borneo Highway or Trans-Kalimantan Highway ( id, Jalan Lintas Kalimantan), is a road network on Borneo Island connecting two Malaysian states, Sabah and Sarawak, with Brunei ...
. On 11 November 2016, the Minister in the Prime Minister Department
Abdul Rahman Dahlan Datuk Seri Panglima Haji Abdul Rahman bin Dahlan ( Jawi: عبدالرحمن بن دحلان; born 24 November 1965) is a Malaysian politician. He is the former Minister in the Prime Minister's Department and the Minister of Urban Wellbeing, H ...
said the full study on the proposed bridge project to complete in early 2017. On 29 April 2017, it was reported that Prime Minister Najib Razak will launch the Labuan Development Blueprint (LDB) in May. According to Rozman, the bridge will only be constructed in 2020, and scheduled for completion in 2023. The announcement was subsequently responded to by Sabah
People's Justice Party The People's Justice Party ( ms, Parti Keadilan Rakyat , often known simply as KEADILAN or PKR) is a reformist political party in Malaysia, formed in 2003 by a merger of the National Justice Party and the older Malaysian People's Party. The ...
(PKR) chief Simsudin Sidek who said it was "unacceptable" for a short bridge to take four years to become a reality as was exampled from the construction of the Second Penang Bridge with a much longer length of 23.5 kilometres that was completed in five years. In his statement, he said: Following the change of government after the 2018 general election, PKR vice-president
Nurul Izzah Anwar Nurul Izzah binti Anwar ( Jawi: ; born 19 November 1980) is a Malaysian politician who served as the Member of Parliament (MP) for Permatang Pauh from May 2018 to November 2022 and for Lembah Pantai from March 2008 to May 2018. A member of the ...
stating on 19 September that their party are in favour to construct the bridge with another fellow vice-president
Rafizi Ramli Mohd Rafizi bin Ramli ( Jawi: ; born 14 September 1977) is a Malaysian politician who has served as the Minister of Economy in the Pakatan Harapan (PH) administration under Prime Minister Anwar Ibrahim since December 2022 and the Member of Pa ...
also supporting the proposal to build the bridge. She also stating that a letter from her will be delivered to Federal Territories Minister
Khalid Abdul Samad Khalid bin Abdul Samad ( Jawi: خالد بن عبدالصمد; born 14 August 1957) is a Malaysian politician who served as the Minister of Federal Territories in the Pakatan Harapan (PH) administration under former Prime Minister Mahathir M ...
on the need to build the bridge since the previous techno-economic feasibility study for the bridge construction by the previous government had been scrapped due to the unreasonable high cost. Minister Khalid also clarifying that despite the expensive project study by the previous government had been scrapped, the bridge project are still on the line. As a result of the subsequent postponement by the new government to provide the long-awaited bridge following the study scrapping, many concerned citizens had criticise and citing the matter should be no longer prolonged after so much promises given if the government really care about the transportation difficulties facing by the people of Labuan. On 29 June 2019, the current
Member of parliament A member of parliament (MP) is the representative in parliament of the people who live in their electoral district. In many countries with bicameral parliaments, this term refers only to members of the lower house since upper house members o ...
(MP) of Labuan, Rozman met Prime Minister Mahathir Mohamad with a briefing on the future development plan for the island, among the proposal included in the plan is the need for bridge which become the utmost priority to improve the economy landscape of both Labuan and Sabah where it was received positively by the Prime Minister. On 16 July, LC through their chairman Amir Hussein said the bridge will soon come to a realisation with the project will be available for bidding after its potential launch by the second half of the year with an estimate value of around RM4 billion. He further elaborated that the corporation still waiting for a green light from the Sabah government with a letter has been submitted to the latter state secretary. Through a meeting between Sabah Chief Minister
Shafie Apdal Datuk Seri Panglima Mohd Shafie bin Apdal ( Jawi: محمد شافعي بن أفضل; born 20 October 1956) is a Malaysian politician who has served as the Member of Parliament (MP) for Semporna since April 1995, State Leader of the Opposition ...
and representatives from the Federal Territories Ministry and the Economic Affairs Ministry in September, both sides agree on the construction of the bridge where they are planning to open the request for proposal before the end of the year and searching for any investors group that are interested and want to invest in the bridge construction. In early January 2020, the
Malaysian Public Works Department The Malaysian Public Works Department (JKR; ms, Jabatan Kerja Raya Malaysia) is the federal government department in Malaysia under Ministry of Works Malaysia (MOW) which is responsible for construction and maintenance of public infrastructure ...
(JKR) began calling for proposals from the private sector on the proposed bridge. The following month in February, nine private firms has announced their interest on the bridge project with Federal Territories Minister Khalid also hopeful the project will be awarded within 2020. By June, the new Federal Territories Minister
Annuar Musa Tan Sri Datuk Seri Panglima Haji Annuar bin Musa ( Jawi: أنور بن موسى; born 18 May 1956) is a Malaysian politician who served as the Minister of Communications and Multimedia in the Barisan Nasional (BN) administration under former ...
also stressed the importance of the bridge that deserves "serious attention". In August, Minister Annuar announced that the government is conducting the final phase of a feasibility study on the bridge construction. By September, Minister Annuar announced that a working paper on the Labuan bridge are to be submitted to the
Cabinet of Malaysia The Cabinet of Malaysia ( Malay: ''Jemaah Menteri Malaysia'') is the executive branch of the Government of Malaysia. Led by the Prime Minister, the cabinet is a council of ministers who are accountable collectively to the Parliament. According ...
for approval. In November, the federal government has agreed to build the bridge through the Private Finance Initiative (PFI) where the federal ministry and Works Ministry were in the process of finalising the terms of reference for the "Request for Proposal" (RFP) process to begin the bridge construction where it will be finalised by October 2021. In September 2021, Federal Territories Minister
Shahidan Kassim Shahidan bin Kassim ( Jawi: شهيدان بن قاسم; born 17 June 1951) is a Malaysian politician who served as Minister of Federal Territories in the Barisan Nasional (BN) administration under former Prime Minister Ismail Sabri Yaakob fro ...
said the construction of the bridge are to commence in July 2022.


Further reading

* Larry Ralon
Another study on Labuan bridge
(PDF).
Universiti Malaysia Sabah , image = Seal of Universiti Malaysia Sabah.png , image_size = , caption = Seal , motto = ''Bertekad Cemerlang'' (Malay) Jawi: , mottoeng = Strive to Excel , ...
Repository


References

{{DEFAULTSORT:Labuan-Menumbok Bridge Bridges in Sabah Proposed buildings and structures in Malaysia