Fitting out, or outfitting, is the process in
shipbuilding Shipbuilding is the construction of ships and other floating vessels. It normally takes place in a specialized facility known as a shipyard. Shipbuilders, also called shipwrights, follow a specialized occupation that traces its roots to bef ...
that follows the float-out/launching of a vessel and precedes
sea trial A sea trial is the testing phase of a watercraft (including boats, ships, and submarines). It is also referred to as a " shakedown cruise" by many naval personnel. It is usually the last phase of construction and takes place on open water, and ...
s. It is the period when all the remaining construction of the ship is completed and readied for delivery to her owners. Since most of the fitting-out process is interior work, this stage can overlap with latter stages, such as the sea trials.


Launching or floating

After a vessel has been floated (in contemporary shipbuilding) or launched (in traditional shipbuilding), it is then towed out of its drydock and moored at a fitting-out berth. While still afloat, its construction is then continued. Depending on the type of vessel, fitting-out can last weeks or many months. Vessels with comparatively little space for human occupation, such as oil tankers, bulk carriers and container ships, can take the least time for fitting. Conversely,
passenger ship A passenger ship is a merchant ship whose primary function is to carry passengers on the sea. The category does not include cargo vessels which have accommodations for limited numbers of passengers, such as the ubiquitous twelve-passenger freig ...
s take the longest. The process can include: * completion of the superstructure, * installation of the ship’s power plant, engines, and other machinery, * interior equipment and systems, including
electrical Electricity is the set of physical phenomena associated with the presence and motion of matter that has a property of electric charge. Electricity is related to magnetism, both being part of the phenomenon of electromagnetism, as described ...
,
plumbing Plumbing is any system that conveys fluids for a wide range of applications. Plumbing uses pipes, valves, plumbing fixtures, tanks, and other apparatuses to convey fluids. Heating and cooling (HVAC), waste removal, and potable water delive ...
, and
HVAC Heating, ventilation, and air conditioning (HVAC) is the use of various technologies to control the temperature, humidity, and purity of the air in an enclosed space. Its goal is to provide thermal comfort and acceptable indoor air quality. ...
, * finishing of interior spaces, * and installation of furnishings. Whatever construction is completed during fitting is also dependent on the shipyard’s capabilities and the availability of equipment prior to floating. For example, ''
Queen Mary 2 RMS ''Queen Mary 2'' (also referred to as the ''QM2'') is a British transatlantic ocean liner. She has served as the flagship of Cunard Line since succeeding ''Queen Elizabeth 2'' in 2004. As of 2022, ''Queen Mary 2'' is the only ocean liner ...
'' was originally to have its propeller pods installed prior to floating, but this was not done until the fitting-out stage. Contemporary ship construction usually has the vessel returning to drydock several times for installation of propulsion mechanisms (such as propulsion pods in contemporary vessels) and for the painting of surfaces below the waterline.