Drainage Services Department
   HOME

TheInfoList



OR:

The Drainage Services Department (DSD) is a department of the Hong Kong Government responsible for drainage and sewerage. Since 2007 it has been subordinate to the
Development Bureau The Development Bureau (DEVB; ) is an agency of the Government of Hong Kong responsible for urban planning and renewal, land administration, infrastructure development, building safety, landscape, greening & tree development, water supplies, ...
.


Responsibilities

The department is responsible for stormwater drainage, sewage collection and treatment, and flood prevention.


History

Environmental protection was one of the main concerns of former governor David Wilson. Wilson stressed the importance of better planning, increased control of pollution discharges, and large-scale investment in improved sewage disposal infrastructure. He stated that Hong Kong needed more treatment facilities and new outfalls constructed sufficiently far out to sea, and promoted a new department to help achieve this. The Drainage Services Department was established in 1989.


Major infrastructure works


Harbour Area Treatment Scheme

The Harbour Area Treatment Scheme (HATS) is a major sewage treatment infrastructure improvement scheme designed to improve the water quality of
Victoria Harbour Victoria Harbour is a natural landform harbour in Hong Kong separating Hong Kong Island in the south from the Kowloon Peninsula to the north. The harbour's deep, sheltered waters and strategic location on South China Sea were instrumental in ...
. Originally called the Strategic Sewage Disposal Scheme, the plan was drawn up in 1989 and construction of HATS Stage 1 commenced in 1994. It comprises a system of deep tunnels to convey sewage from eight Preliminary Treatment Works to the Stonecutters Island Sewage Treatment Works, which opened in 1997. The full Stage I system, which treats 75% of the sewage generated by the urban areas around the harbour, came online in December 2001. Construction of HATS Stage 2 commenced in 2008, and stage 2A was commissioned in 2015. HATS Stage 2B, comprising an underground biological treatment facility at Stonecutters Island, has been shelved as it is felt that the existing facility is sufficient at this time.


Drainage tunnels

The department has built several significant bored tunnels designed to intercept water running down mountain slopes and divert it from urban areas in order to prevent flooding. The largest of these is the Hong Kong West Drainage Tunnel, comprising an 11-kilometre long main tunnel and 8 km of adits. It stretches from
Tai Hang Tai Hang () is an area southeast of Causeway Bay located in the mid-north of Hong Kong Island in Hong Kong. It is home to many luxurious private apartments. Residents are predominantly more affluent Hong Kong locals and expatriate profession ...
in the east to an outfall just north of
Cyberport Cyberport is a business park in Southern District, Hong Kong consisting of four office buildings, a hotel, and a retail entertainment complex. It describes itself as a digital technology community with over 1,800 (800 on-site and 1,0 ...
. It was built at a cost of HK$3.4 billion. Construction commenced in November 2007 and the tunnel was commissioned on 22 August 2012. The Lai Chi Kok Drainage Tunnel encircles
Sham Shui Po Sham Shui Po is an area of Kowloon, Hong Kong, situated in the northwestern part of the Kowloon Peninsula, north of Tai Kok Tsui, east of Cheung Sha Wan and south of Shek Kip Mei (). It is located in and is the namesake of the Sham Shui ...
and
Lai Chi Kok Lai Chi Kok is a neighbourhood in Kowloon, Hong Kong, east of Kwai Chung and west of Cheung Sha Wan. Mei Foo Sun Chuen is the largest housing estate in the area and also the largest in Hong Kong with 99 blocks. Administratively, it belongs t ...
. It is a 3.7-kilometre tunnel, stretching from Shek Kip Mei to an outfall near
Stonecutters Island Stonecutters Island or Ngong Shuen Chau is a former island in Victoria Harbour, Hong Kong. Following land reclamation, it is now attached to the Kowloon Peninsula. Fauna The island once boasted at least three mating pairs of sulphur-crested co ...
, built at a cost of $1.7 billion. Construction commenced in November 2008 and the tunnel was commissioned on 18 October 2012. The Tsuen Wan Drainage Tunnel protects the
Tsuen Wan New Town Tsuen Wan New Town is a new town in Hong Kong. It spans Tsuen Wan, Kwai Chung and the eastern part of Tsing Yi Island. Traditionally, the administrative officials of Tsuen Wan managed the area of Tsuen Wan proper, Kwai Chung, Tsing Yi Isla ...
and
Kwai Chung Kwai Chung is an urban area within Tsuen Wan New Town in the New Territories of Hong Kong. Together with Tsing Yi Island, it is part of the Kwai Tsing District District of Hong Kong. It is also part of Tsuen Wan New Town. In 2000, it had a popula ...
areas. The 5.1-kilometre tunnel begins at Wo Yi Hop, north of Kwai Chung, and curves around the north of Tsuen Wan proper. Past Chai Wan Kok, it parallels the Tuen Mun Highway a short distance and then empties into the Rambler Channel. Construction of the $1.5 billion tunnel commenced in 2007. It was commissioned on 28 March 2013.


Vessels

The department operates two sludge transport vessels, called Clean Harbour 1 and Clean Harbour 2. These ships transport sludge from the Stonecutters Island Sewage Treatment Works to the sludge treatment facility in Tuen Mun. The ships are equipped with gantry cranes capable of lifting sludge from the lorries directly into containers on board, and can lift 10 containers per hour. Each ship can carry 90 containers of sludge, a total of 1,200 tons of sludge. The vessels were built by Jinhui Shipbuilding of
Zhongshan Zhongshan (; ) is a prefecture-level city in the south of the Pearl River Delta in Guangdong province, China. As of the 2020 census, the whole city with 4,418,060 inhabitants is now part of the Guangzhou–Shenzhen conurbation with 65,565,622 ...
and commissioned in 2015.


Clean Harbour 1

* container ship * Maritime Mobile Service Identification Number: 477 995 437 * IMO No: 9708277 * Official number: HK-4292 * Callsign: VROH7 * Net Tonnage: 657 tons * Gross tonnage: 1971 tons * Commissioning date: 5 March 2015


Clean Harbour 2

* container ship * Maritime Mobile Service Identification Number: 477 995 441 * IMO No: 9708289 * Official number: HK-4305 * Callsign: VROJ4 * Net Tonnage: 657 tons * Gross tonnage: 1971 tons * Commissioning date: 5 March 2015


References


Further reading

* *


External links

* {{authority control Hong Kong government departments and agencies Water supply and sanitation in Hong Kong Flood control in Asia