Canada Line
   HOME

TheInfoList



OR:

The Canada Line is a
rapid transit Rapid transit or mass rapid transit (MRT), also known as heavy rail or metro, is a type of high-capacity public transport generally found in urban areas. A rapid transit system that primarily or traditionally runs below the surface may be ...
line in
Metro Vancouver The Metro Vancouver Regional District (MVRD), or simply Metro Vancouver, is a Canadian political subdivision and corporate entity representing the metropolitan area of Greater Vancouver, designated by provincial legislation as one of the 28 ...
, British Columbia, Canada, that is part of the SkyTrain system. The line is owned by TransLink and InTransitBC and is operated by ProTrans BC. Coloured turquoise on route maps, it operates as an
airport rail link An airport rail link is a service providing passenger rail transport from an airport to a nearby city by mainline or commuter trains, rapid transit, people mover, or light rail. Direct links operate straight to the airport terminal, while ...
between
Vancouver Vancouver ( ) is a major city in western Canada, located in the Lower Mainland region of British Columbia. As the most populous city in the province, the 2021 Canadian census recorded 662,248 people in the city, up from 631,486 in 2016. ...
,
Richmond Richmond most often refers to: * Richmond, Virginia, the capital of Virginia, United States * Richmond, London, a part of London * Richmond, North Yorkshire, a town in England * Richmond, British Columbia, a city in Canada * Richmond, Californi ...
, and the
Vancouver International Airport Vancouver International Airport is an international airport located on Sea Island in Richmond, British Columbia, serving the city of Vancouver and the Lower Mainland region. It is located from Downtown Vancouver. It is the second busie ...
(YVR). The line comprises 16 stations and of track; the main line runs from Vancouver to Richmond while a
spur line A branch line is a phrase used in railway terminology to denote a secondary railway line which branches off a more important through route, usually a main line. A very short branch line may be called a spur line. Industrial spur An industr ...
from Bridgeport station connects to the airport. It opened on August 17, 2009, ahead of the
2010 Winter Olympics )'' , nations = 82 , athletes = 2,626 , events = 86 in 7 sports (15 disciplines) , opening = February 12, 2010 , closing = February 28, 2010 , opened_by = Governor General Michaëlle Jean , cauldron = Catriona Le May DoanNancy Greene Wayne G ...
. The Canada Line was anticipated to have 100,000 boardings per day in 2013 and 142,000 boardings per day by 2021, but it has consistently exceeded early targets.Canada Line
Ridership has grown steadily since opening day, with average ridership of 83,000 per day in September 2009, 105,000 per day in March 2010, and over 136,000 passengers per weekday in June 2011. During the 17 days of the 2010 Winter Olympics, the line carried an average of 228,190 passengers per day. Governance of the project was through Canada Line Rapid Transit Inc. (CLCO), formerly RAV Project Management Ltd. (RAVCO), a reflection of the original "Richmond–Airport–Vancouver" name). The line was built by
SNC-Lavalin SNC-Lavalin Group Inc. is a Canadian company based in Montreal that provides engineering, procurement, and construction (EPC) services to various industries, including mining and metallurgy, oil and gas, environment and water, infrastructure, a ...
, and InTransitBC is under contract with TransLink to manage the line for its first 35 years, until 2044. The Canada Line is operationally independent from British Columbia Rapid Transit Company, which operates SkyTrain's
Expo An expo is a trade exposition. It may also refer to: Events and venues * World's fair, a large international public exposition * Singapore Expo, convention and exposition venue ** Expo Axis, one of the world's largest membrane roofs, construct ...
and
Millennium A millennium (plural millennia or millenniums) is a period of one thousand years, sometimes called a kiloannus, kiloannum (ka), or kiloyear (ky). Normally, the word is used specifically for periods of a thousand years that begin at the starting ...
lines but is considered a part of the SkyTrain network. Like the other two SkyTrain lines in Metro Vancouver, it is also
light metro A medium-capacity system (MCS), also known as light rapid transit or light metro, is a rail transport system with a capacity greater than light rail, but less than typical heavy-rail rapid transit. MCS’s trains are usually 1-4 cars, or 1 lig ...
rapid transit, using fully automated trains on grade-separated guideways. However, the trains are powered by conventional motors with
third rail A third rail, also known as a live rail, electric rail or conductor rail, is a method of providing electric power to a railway locomotive or train, through a semi-continuous rigid conductor placed alongside or between the rails of a railway ...
electrical pickup rather than the linear induction system used on the other SkyTrain lines.


Route

The Canada Line begins in
Downtown Vancouver Downtown Vancouver is the central business district and the city centre neighbourhood of Vancouver, Canada, on the northwestern shore of the Burrard Peninsula in the Lower Mainland region of British Columbia. It occupies most of the north shor ...
at Waterfront station () in a
cut-and-cover A tunnel is an underground passageway, dug through surrounding soil, earth or rock, and enclosed except for the entrance and exit, commonly at each end. A pipeline is not a tunnel, though some recent tunnels have used immersed tube cons ...
subway tunnel beneath
Granville Street Granville Street is a major street in Vancouver, British Columbia, Canada, and part of Highway 99. Granville Street is most often associated with the Granville Entertainment District and the Granville Mall. This street also cuts through resid ...
. It quickly goes into twin-bored tunnels, heading southwest beneath Granville Street, then curving southeast to follow
Davie Street Davie Village (also known as Davie District or simply Davie Street) is a neighbourhood in the West End of Vancouver, British Columbia, Canada. It is the home of the city's LGBT subculture, and, as such, is often considered a gay village, o ...
through
Yaletown Yaletown is an area of Downtown Vancouver, Canada, bordered by False Creek and Robson and Homer Streets. Formerly a heavy industrial area dominated by warehouses and rail yards, since the 1986 World's Fair it has been transformed into one of the ...
. The tunnels then dive deeper to pass below
False Creek False Creek (french: Faux ruisseau) is a short narrow inlet in the heart of Vancouver, separating the Downtown and West End neighbourhoods from the rest of the city. It is one of the four main bodies of water bordering Vancouver, along with Eng ...
before rising back up to
Olympic Village station Olympic Village is an underground station on the Canada Line of Metro Vancouver's SkyTrain rapid transit system. The station is located at the intersection of Cambie Street and West 2nd Avenue, adjacent to the Cambie Street Bridge in Vancouver ...
(). There, the line transitions back to a cut-and-cover tunnel (which is noted by the tunnel changing from a circular to a square shape), heading south under
Cambie Street Cambie Street is a street in Vancouver, British Columbia, Canada. It is named for Henry John Cambie, chief surveyor of the Canadian Pacific Railway's western division (as is Cambie Road, a major thoroughfare in nearby Richmond). There are two ...
. This section has some portions where the two sets of tracks are stacked vertically. The line emerges from the ground just south of 64th Avenue, climbing to an elevated guideway. The line continues elevated across the North Arm Bridge over the North Arm of the
Fraser River The Fraser River is the longest river within British Columbia, Canada, rising at Fraser Pass near Blackrock Mountain in the Rocky Mountains and flowing for , into the Strait of Georgia just south of the City of Vancouver. The river's annual ...
, leaving
Vancouver Vancouver ( ) is a major city in western Canada, located in the Lower Mainland region of British Columbia. As the most populous city in the province, the 2021 Canadian census recorded 662,248 people in the city, up from 631,486 in 2016. ...
and entering
Richmond Richmond most often refers to: * Richmond, Virginia, the capital of Virginia, United States * Richmond, London, a part of London * Richmond, North Yorkshire, a town in England * Richmond, British Columbia, a city in Canada * Richmond, Californi ...
. Just beyond Bridgeport station () at a
flying junction A flying junction or flyover is a railway junction at which one or more diverging or converging tracks in a multiple-track route cross other tracks on the route by bridge to avoid conflict with other train movements. A more technical term is " g ...
, the line splits, with the Richmond branch heading south on elevated tracks along No. 3 Road and terminating at
Richmond–Brighouse station Richmond–Brighouse is an elevated station on the Canada Line of Metro Vancouver's SkyTrain rapid transit system. Located in the Brighouse area of Richmond, British Columbia, Canada, it is one of the outbound terminus stations of the Canada L ...
(). The airport branch turns west and crosses the
Middle Arm Bridge The Middle Arm Bridge is one of three transit bridges in Metro Vancouver. It spans the middle arm of the Fraser River, linking Lulu Island with the Vancouver International Airport on Sea Island. It is used by the airport branch of the Canada Lin ...
over the Middle Arm of the Fraser River, connecting to stations on Sea Island and terminating at
YVR–Airport station YVR–Airport is an elevated station on the Canada Line of Metro Vancouver's SkyTrain rapid transit system. The station is located at Vancouver International Airport's main terminal in Richmond, British Columbia, and is one of the outbound termi ...
(). Portions of the airport branch are at grade in order to accommodate a future elevated taxiway for aircraft over the line. Both branches narrow to a single track as they approach their respective terminus stations. Just before Bridgeport station is the Operations and Maintenance Centre (OMC) facility, which houses Canada Line trains that are not in use.


Stations

Station construction was designed as a two-stage process. Sixteen original stations opened at the same time as the line did. Three additional stations are planned, and may be built in the future. The stations are listed below. Each Canada Line station is slightly different in appearance, designed to blend in with the surrounding neighbourhood. For example, Langara–49th Avenue station is designed to fit into the area's low-density residential neighbourhood. The five busiest stations have platforms long, while the rest of the stations have platforms that can be easily extended to 50 metres. The termini at YVR–Airport and Richmond–Brighouse stations are single-tracked, whereas the Waterfront station terminus is double-tracked. The double-tracking is necessary to accommodate the three-minute headways between trains on the Waterfront–Bridgeport portion of the line. King Edward station is the only station with a stacked configuration, and Broadway–City Hall station is the only station with a double-height ceiling over the platforms.
Vancouver City Centre station Vancouver City Centre is an underground station on the Canada Line of Metro Vancouver's SkyTrain rapid transit system. The station is located on Granville Street, between West Georgia Street and Robson Street in Downtown Vancouver, and serves th ...
is linked to
Pacific Centre Pacific Centre (officially CF Pacific Centre since 2015) is a shopping mall located in Vancouver, British Columbia, Canada. It is owned by Cadillac Fairview, the Ontario Pension Board, and the Workplace Safety and Insurance Board, and is manage ...
mall and Vancouver Centre Mall, in addition to having street level access. All direct transfers to the Expo and Millennium Lines must be made at Waterfront station; there is no direct connection from Vancouver City Centre station to Granville station. However, it is possible to transfer between those two stations via a short walk through Pacific Centre or Vancouver Centre Mall. File:Canada Line 001.JPG, Real-time information is provided on every station platform. File:Canada Line False Creek tunnel construction.jpg, Construction taking place on the south shore of False Creek, at the site of
Olympic Village station Olympic Village is an underground station on the Canada Line of Metro Vancouver's SkyTrain rapid transit system. The station is located at the intersection of Cambie Street and West 2nd Avenue, adjacent to the Cambie Street Bridge in Vancouver ...
, April 14, 2006 Image Granvillemallskytrain.jpg, Construction of Vancouver City Centre station, below Granville Street between Robson and Georgia, April 9, 2008
Stations were configured to allow for the future installation of fare gates, and received fare gates in 2013 as part of full implementation throughout all SkyTrain stations. Every station has an up escalator and an elevator, but only the three terminal stations have down escalators. Until late 2019, six stations (Vancouver City Centre, Olympic Village, Broadway–City Hall,
Marine Drive Marine Drive may refer to: Roads Bangladesh * Cox Bazar-Tekhnaf Marine Drive, world's longest marine drive road. Canada *Marine Drive (Nova Scotia), a scenic route in Nova Scotia *Marine Drive (Greater Vancouver), a number of roadways in Metropo ...
, Templeton, and YVR–Airport) were equipped with self-service flight check-in kiosks which allowed customers to check into their flights at
Vancouver International Airport Vancouver International Airport is an international airport located on Sea Island in Richmond, British Columbia, serving the city of Vancouver and the Lower Mainland region. It is located from Downtown Vancouver. It is the second busie ...
while at these stations.


Additional stations

Provisions have been made to allow for the addition of the following stations in the future: * 33rd Avenue (Cambie Street at West 33rd Avenue, next to Queen Elizabeth Park) * 57th Avenue (Cambie Street at West 57th Avenue) *: The future of a 57th Avenue (Cambie Street and West 57th Avenue) in Vancouver is not fully known at this time. The original plan was that one day a station could be built, but new documents and talk between TransLink and the City of Vancouver raise the possibility of it never happening. The station was part of the broad policy statement adopted in 2014 by city council for the redevelopment of the Pearson Dogwood lands. But in June 2017 Susan Haid, city assistant director of planning for Vancouver South, submitted a report to Vancouver council stating that "though it is desirable to achieve a future station at 57th Avenue there are a number of key challenges," Haid wrote in her report. "Currently, the station is not considered in regional transportation plans and is not considered a regional priority such as the Broadway Corridor line." Haid also added to her report that, "Should the station not be attainable in the long-term future, the financial contribution towards a future station would be re-allocated to address the amenity priorities identified for Pearson Dogwood and those in and around the Cambie Corridor consistent with the respective public benefit strategies." * Capstan Way *: A future station at Capstan Way (No. 3 Road and Capstan Way) in Richmond had been planned but was cancelled in March 2009. Pinnacle International and Concord Pacific, the developers of the Sun Tech City project, could not fund the $25 million required to build the station. The developers could only offer $15 million up-front, but this sum was not accepted by TransLink and the City of Richmond. In May 2012, the city of Richmond made an agreement with TransLink and the developers to fund the project in a special way: the developers would pay a fee of just over $8,500 per unit with the specific amount adjusted in October to account for inflation. In November 2017, the City of Richmond released $3.5 million to TransLink to cover costs of designing the Capstan Way station. As of September 30, 2017, about $19.36 million of the $27.8 million required has been collected. In 2012 when the agreement was struck, it was expected to take about 15 years to collect the required funds, but based on development permit applications, it was possible the full $27.8 million could be achieved by mid-2018, a full nine years early than expected. By May 2019, $32million had been raised, exceeding the required $27.8million, which had been reached in November 2018. By December 2019, the station was still in the detailed design stage. Construction on the station began in September 2021, with the station expected to open in March 2023. * YVR Terminal 3 (near YVR Terminal 3) *: The master plan for the Vancouver International Airport for 2027 indicates that this station would be built alongside the airport's proposed Northeast Terminal expansion.


Transit connections

Many transit services connect with the Canada Line and form an important part of the service. With the opening of the line, most bus routes in Richmond, and connecting services from White Rock, Tsawwassen, and Ladner, doubled their service frequency. Waterfront station provides connections to the
R5 Hastings St The R5 Hastings St is an express bus service with bus rapid transit elements in Metro Vancouver, Canada. Part of TransLink (British Columbia), TransLink's RapidBus (TransLink), RapidBus network, it travels along Hastings Street (Vancouver), Hasti ...
, Expo Line,
West Coast Express The West Coast Express is a commuter railway serving the Lower Mainland region of British Columbia, Canada. Opened in 1995, it provides a link between Metro Vancouver and the Fraser Valley Regional District and is the only commuter railway in ...
, and
SeaBus The SeaBus is a passenger-only ferry service in Metro Vancouver, British Columbia, Canada. It crosses Burrard Inlet to connect the cities of Vancouver ( Waterfront station) and North Vancouver (Lonsdale Quay). Owned by TransLink and operated by ...
. Broadway–City Hall provides a connection to the 99 B-Line service. Except for night service, when trains are not running, there is no longer any TransLink bus service to the airport. The Airport Station exchange was closed on September 7, 2009, a few weeks after the opening of the line. Bus routes that used this loop were discontinued (as in the case of the 424 and the
98 B-Line The 98 B-Line was a bus rapid transit line in Metro Vancouver, British Columbia, Canada. It linked Richmond to Downtown Vancouver, with a connection to Vancouver International Airport. It travelled mainly along Granville Street in Vancouver and ...
), short-turned (as in the case of the 100, renamed 100 Marpole Loop), or redirected to Bridgeport station (as in the case of the 620, C90, and C92). Work began in May 2021 to extend the Millennium Line from
VCC–Clark station VCC–Clark is an elevated station on the Millennium Line of Metro Vancouver's SkyTrain rapid transit system. The station is named after the nearby Vancouver Community College (VCC) located in Vancouver, British Columbia, Canada and serves as ...
west along
Broadway Broadway may refer to: Theatre * Broadway Theatre (disambiguation) * Broadway theatre, theatrical productions in professional theatres near Broadway, Manhattan, New York City, U.S. ** Broadway (Manhattan), the street **Broadway Theatre (53rd Stree ...
to the new Arbutus station, allowing for a transfer to the Canada Line at Broadway–City Hall station. As indicated in material presented by the City of Vancouver at public meetings in early 2006, this station was designed with such a future extension in mind. A "knock-out" panel was installed in the concourse that would facilitate construction of a connection between the station and a Broadway-corridor SkyTrain extension. The Canada Line uses the same fare system as the rest of the transit system managed by TransLink, with two exceptions: * The YVR AddFare, started in January 2010, is a surcharge that applies to some passengers leaving the airport and travelling eastbound to Bridgeport station and beyond. Passengers headed away from the airport must pay a $5 AddFare on top of the regular fare to leave the Sea Island stations unless they are travelling on a monthly pass; or a DayPass or a single-use Compass Ticket not that was not purchased on Sea Island. * Travel between the Sea Island stations is free to everyone. There is no additional fare for passengers travelling toward the airport. Such trips require a special Sea Island ticket that is free to obtain at any ticket machine at the Sea Island stations. These tickets are not valid for tapping out at other stations; an exit ticket is required for Sea Island ticketholders exiting at any station outside of Sea Island. The Canada Line operates on a "Fare Paid Zone" system. Passengers are required by law to possess a valid fare when they are in Fare Paid Zones. Fare Paid Zones are clearly marked, and fares can be bought from Compass Vending Machines at all stations. Fare inspections are mostly conducted by the South Coast British Columbia Transportation Authority Police Service. Passengers who fail to pay the fare or do not have a valid fare may be fined $173 and/or removed from the station or train. Canada Line attendants are the customer service staff for the Canada Line. They are easily identifiable by their green uniforms. They provide customer service, troubleshoot certain problems with the trains, observe and report safety issues, and check fares.


Technology

The Canada Line uses a fleet of trains built by Rotem, a division of
Hyundai Motor Group The Hyundai Motor Group (HMG; ; ; stylized as HYUΠDAI) is a South Korean '' chaebol'' (loosely similar to a multinational conglomerate but without a central holding company or ownership structure) headquartered in Seoul, South Korea. The H ...
. The trains are powered by conventional electric motors, rather than the
linear induction motor A linear induction motor (LIM) is an alternating current (AC), asynchronous linear motor that works by the same general principles as other induction motors but is typically designed to directly produce motion in a straight line. Characteristica ...
s used by the Expo and Millennium Line's
Bombardier ART Innovia Metro is an automated rapid transit system manufactured by Alstom. Innovia Metro systems run on conventional metal rails and pull power from a third rail, but are powered by a linear induction motor that provides traction by pulling on ...
trains. Canada Line trains are operated by the same SelTrac automated train control system used in the rest of the SkyTrain network. The selection of Rotem was largely a consequence of the request for proposals process for the public-private partnership, whose terms did not allow Bombardier to consider efficiencies in combining operations or rolling-stock orders for the new line with those for the existing system. This placed all bidders on a level playing field, albeit at the cost of not necessarily picking the most efficient choice for long-term operation. The RFP also required that the system have a capacity of 15,000 passengers per hour in each direction (leaving the choice of technology and platform length to the proponent) and a maximum travel time between the airport and downtown Vancouver of 24 minutes. The fleet consists of 20 fully automated two-car articulated trains, for a total of 40 cars. The capacity of the trains is estimated at 334 people per pair of cars (comfortably) or 400 people at
crush load Crush may refer to: Film * ''Crush'' (1972 film), a Hong Kong film * ''Crush'' (1992 film), a New Zealand film by Alison Maclean * ''The Crush'' (1993 film), a film by Alan Shapiro, starring Cary Elwes and Alicia Silverstone * ''Crush'' (200 ...
. The trains have a top speed of in normal operation and in catch-up mode. Each married pair of gangway-connected cars is 41 metres long and 3 metres wide, similar in dimensions to
Ottawa Ottawa (, ; Canadian French: ) is the capital city of Canada. It is located at the confluence of the Ottawa River and the Rideau River in the southern portion of the province of Ontario. Ottawa borders Gatineau, Quebec, and forms the c ...
's
O-Train The O-Train is a light metro transit system in Ottawa, Ontario, Canada, operated by OC Transpo. The O-Train system has two lines, the electrically-operated Confederation Line (Line 1) and the diesel-operated Trillium Line (Line 2). Since May ...
, and longer and wider than the Bombardier ART fleet used on the Expo and Millennium lines. Each train has LED electronic displays on the exterior to indicate the terminus station and on the interior to display the next station and the terminus station, a useful feature considering the line has two branches. As of late 2017, Translink has ordered another 24 trains, sole sourced from Hyundai Rotem. The sole source contract will allow for commonality between the two train models, and reduce the number of specialized tools and parts required.


Canada Line Hyundai Rotem specifications

* Car builder:
Hyundai Rotem Hyundai Rotem (founded in 1977) is a South Korean company that manufactures rolling stock, defense products and plant equipment. It is a part of the Hyundai Motor Group. Its name was changed from Rotem to Hyundai Rotem in December 2007 to refl ...
, South Korea * Car body: brushed
stainless steel Stainless steel is an alloy of iron that is resistant to rusting and corrosion. It contains at least 11% chromium and may contain elements such as carbon, other nonmetals and metals to obtain other desired properties. Stainless steel's r ...
, with a
vinyl Vinyl may refer to: Chemistry * Polyvinyl chloride (PVC), a particular vinyl polymer * Vinyl cation, a type of carbocation * Vinyl group, a broad class of organic molecules in chemistry * Vinyl polymer, a group of polymers derived from vinyl ...
wrap at the outer ends * Unit numbers: pairs numbered 1xx and 2xx where xx increments from 01 to 32 * Fleet of: 20 two-car train sets * Train length: * Car width: * Car height: *
Track gauge In rail transport, track gauge (in American English, alternatively track gage) is the distance between the two rails of a railway track. All vehicles on a rail network must have wheelsets that are compatible with the track gauge. Since many ...
: * Total weight: (empty) *
Propulsion system Propulsion is the generation of force by any combination of pushing or pulling to modify the translational motion of an object, which is typically a rigid body (or an articulated rigid body) but may also concern a fluid. The term is derived from ...
: Conventional AC
traction motor A traction motor is an electric motor used for propulsion of a vehicle, such as locomotives, electric or hydrogen vehicles, elevators or electric multiple unit. Traction motors are used in electrically powered rail vehicles ( electric multip ...
s * Max. speed: *
Power Power most often refers to: * Power (physics), meaning "rate of doing work" ** Engine power, the power put out by an engine ** Electric power * Power (social and political), the ability to influence people or events ** Abusive power Power may a ...
: 750 V DC *
Braking system A brake is a machine, mechanical device that inhibits motion by absorbing energy from a moving system. It is used for Acceleration, slowing or stopping a moving vehicle, wheel, axle, or to prevent its motion, most often accomplished by means of ...
:
Pneumatic Pneumatics (from Greek ‘wind, breath’) is a branch of engineering that makes use of gas or pressurized air. Pneumatic systems used in industry are commonly powered by compressed air or compressed inert gases. A centrally located and ...
wheel
disc brake A disc brake is a type of brake that uses the calipers to squeeze pairs of pads against a disc or a "rotor" to create friction. This action slows the rotation of a shaft, such as a vehicle axle, either to reduce its rotational speed or to h ...
* Capacity (per train set): 342 passengers (41 seats) * Capacity: 5,000 to 15,000 passengers per hour * Coupling/numbering arrangement: All
married Marriage, also called matrimony or wedlock, is a culturally and often legally recognized union between people called spouses. It establishes rights and obligations between them, as well as between them and their children, and between t ...
pairs. * Price per car * Overall cost: $2billion * Signalling system
Moving block In railway signalling, a moving block is a signalling block system where the blocks are defined in real time by computers as safe zones around each train. This requires both knowledge of the exact location and speed of all trains at any given ti ...
controlled by cable Loop,
Thales Rail Signalling Solutions Thales Rail Signalling Solutions is a division of Thales Group that supplies transportation-based automation solutions for railways. Its operations are controlled from several locations: *its head office in Paris, France *its railway business divi ...
from Toronto, Canada


Name

During the planning and public consultation stages, the line was known as the "Richmond-Airport-Vancouver Line", or RAV for short. The name "Canada Line" was adopted in 2005 to coincide with the beginning of construction. Some early documents also refer to it as the "Olympic Line", in recognition of the
2010 Winter Olympics )'' , nations = 82 , athletes = 2,626 , events = 86 in 7 sports (15 disciplines) , opening = February 12, 2010 , closing = February 28, 2010 , opened_by = Governor General Michaëlle Jean , cauldron = Catriona Le May DoanNancy Greene Wayne G ...
, continuing the practice by which the Expo and Millennium lines were named after significant events occurring at the time of construction. This name was adopted for the demonstration modern
streetcar A tram (called a streetcar or trolley in North America) is a rail vehicle that travels on tramway tracks on public urban streets; some include segments on segregated right-of-way. The tramlines or networks operated as public transport a ...
service that operated along the Downtown Historic Railway for a two-month period centred on the Olympics.


Timeline

* Between 1990 and 1992, BC Transit and N. D. Lea (now WSP Global) consultants studied intermediate-capacity transit system options in the Vancouver–Richmond corridor. * From September 1991 through August 1993, the TRANSPORT 2021 Steering Committee carried out an extensive program of research and public consultation to create "A Long Range Transportation Plan for Greater Vancouver". Under Project Director M. L. (Martin Crilly), a comprehensive transportation investment and financing strategy was envisioned for the region. Until today all existing and proposed road and transit investments have been put forth in this plan. The plan calls for the provision of an intermediate-capacity transit system from Richmond to Vancouver's central business district. * In fall of 1994, N. D. Lea and Delcan consultants carried out studies examining technologies, operating feasibility, ridership, capital and operating costs, traffic impacts, and development potential in three corridors, including the Richmond–Vancouver corridor. These studies were prepared as input into BC Transit's 10-Year Development Plan. They did not include a spur line to the Vancouver International Airport. * In 1995, BC Transit (a crown corporation responsible for public transit) expressed a desire to create a special
bus rapid transit Bus rapid transit (BRT), also called a busway or transitway, is a bus-based public transport system designed to have much more capacity, reliability and other quality features than a conventional bus system. Typically, a BRT system includes ...
(BRT) or automated rapid transit (ART) service connecting the cities of
Richmond Richmond most often refers to: * Richmond, Virginia, the capital of Virginia, United States * Richmond, London, a part of London * Richmond, North Yorkshire, a town in England * Richmond, British Columbia, a city in Canada * Richmond, Californi ...
and
Vancouver Vancouver ( ) is a major city in western Canada, located in the Lower Mainland region of British Columbia. As the most populous city in the province, the 2021 Canadian census recorded 662,248 people in the city, up from 631,486 in 2016. ...
and the
Vancouver International Airport Vancouver International Airport is an international airport located on Sea Island in Richmond, British Columbia, serving the city of Vancouver and the Lower Mainland region. It is located from Downtown Vancouver. It is the second busie ...
in one of the transit improvement plans. ** Underground rights-of-way were reserved at the Concord Pacific development close to the Cambie bridge. * From mid-1997 to mid-1998 a number of BRT routes for Vancouver-airport/Richmond were evaluated, and the preferred route and station locations were selected. * June 24, 1998, the minister in charge of BC Transit,
Joy MacPhail Joy Kathryn MacPhail (born March 6, 1952) is a Canadian former politician in British Columbia. A longtime member of the British Columbia New Democratic Party, she served as a member of the Legislative Assembly (MLA) from 1991 to 2005 and as a ...
, announced plans to build a Vancouver–Richmond ALRT: "The new line would link Richmond city centre, the airport and Downtown Vancouver—probably running north-south through Vancouver along the Cambie Street corridor." "MacPhail said the province wants to accelerate the construction of rapid transit to Richmond as part of a bid to bring the 2010 Winter Olympics to the Lower Mainland." * In 1999, detailed design of the Vancouver-Airport/Richmond BRT was carried out. * On April 1, 1999, The Greater Vancouver Transportation Authority (TransLink) was created under the direction of CEO Ken Dobell, previously city manager for the City of Vancouver. * In April 2000, TransLink adopted its Strategic Transportation Plan 2000–2005. The plan noted that future transit lines have equal priority, and recommended the planning and design of a Richmond-Airport-Vancouver (RAV) rapid transit line. * May 2000 saw the approval of the RAV study, while construction had begun on the BRT service between Richmond Centre, Airport Station exchange, and downtown Vancouver. * In 2000, a Transport Canada report on rail access to the airport estimated it would cost $1.3billion for a SkyTrain expansion using the Cambie route and $738million for a light rail system along the Arbutus corridor. * In December 2000, TransLink received the report on public-private partnerships for road and transportation infrastructure, the model that would be used to finance, construct, and operate the new Canada Line. * On April 1, 2001, bus operators and other CMBC employees went on strike, delaying full implementation of the Vancouver-Airport-Richmond BRT by four months. * That same month, TransLink reaffirmed a Vancouver–Richmond line including a connection to the airport, and approved a recommendation by the TransLink CEO that, based on greater benefits from a private-sector perspective and community concerns, at-grade rail transit be excluded from further analysis and that analysis in Vancouver be restricted to underground options. * On August 1, 2001, the 98 B-Line BRT service began service in the corridor, ultimately carrying over 20,000 passengers per day, while plans were already under way for an ART service to replace it. This proposed service was projected to carry over 100,000 passengers per day. * On December 10, 2001, the federal government under Jean Chrétien announced over $2.0billion in funding for large infrastructure projects; the Canada Strategic Infrastructure Fund established by this budget would fund the federal government's contribution to the Canada Line. The government stipulated that the fund promote private-public partnerships where appropriate. * In April 2002, work was started on the third phase, project definition. This ten-month task consisted of a technical evaluation to determine if it was possible to build the line by 2010. * In 2003, ten companies or consortia submitted expressions of interest in the project. * In December 2003, this was shortlisted to the following three consortia, which were given a request for proposal: ** RAVLink Transportation, which included Fluor Canada,
Siemens AG Siemens AG ( ) is a German multinational conglomerate corporation and the largest industrial manufacturing company in Europe headquartered in Munich with branch offices abroad. The principal divisions of the corporation are ''Industry'', ''E ...
Canada,
MTR Corporation MTR Corporation Limited is a majority government-owned public transport operator and property developer in Hong Kong which operates the Mass Transit Railway, the most popular public transport network in Hong Kong. It is listed on the Hon ...
, and
Balfour Beatty Balfour Beatty plc () is an international infrastructure group based in the United Kingdom with capabilities in construction services, support services and infrastructure investments. A constituent of the FTSE 250 Index, Balfour Beatty works acr ...
Capital Projects; ** RAVxpress, which included Bombardier,
AMEC Amec Foster Wheeler plc was a British multinational consultancy, engineering and project management company headquartered in London, United Kingdom. In October 2017, it was acquired by Wood Group. It was focused on the Oil, Gas & Chemicals, ...
,
Bouygues Bouygues S.A. () is a French industrial group headquartered in the 8th arrondissement of Paris, France. Bouygues is listed on the Euronext Paris exchange and is a blue chip in the CAC 40 stock market index. The company was founded in 1952 by F ...
Travaux Publics, and
Bilfinger Berger Bilfinger SE (previously named Bilfinger Berger AG) is a German company specialized in civil and industrial construction, engineering and services based in Mannheim, Germany. History Bilfinger dates back to 1880 when August Bernatz founded Be ...
; and ** SNC-Lavalin/Serco, which included
SNC-Lavalin SNC-Lavalin Group Inc. is a Canadian company based in Montreal that provides engineering, procurement, and construction (EPC) services to various industries, including mining and metallurgy, oil and gas, environment and water, infrastructure, a ...
and
Serco Serco Group plc is a British company with headquarters based in Hook, Hampshire, England. Serco primarily derives income as a contractor for the provision of government services, most prominently in the sectors of health, transport, justice, ...
. * On April 16, 2004, the federal government under Prime Minister Paul Martin increased its funding promise from $300 million to $450 million. * On June 10, 2004, the provincial government restated its commitment to the Canada Line, increasing funding from $300 to $370 million, and earmarked $170 million for the Evergreen Line. * On June 30, 2004, after twice voting to cancel the project, the TransLink Board approved the RAV line but maintained the right to cancel the project if none of the bids met the approved budget of $1.35 billion. * On November 19, 2004, RAVCO recommended that the
SNC-Lavalin SNC-Lavalin Group Inc. is a Canadian company based in Montreal that provides engineering, procurement, and construction (EPC) services to various industries, including mining and metallurgy, oil and gas, environment and water, infrastructure, a ...
/
Serco Serco Group plc is a British company with headquarters based in Hook, Hampshire, England. Serco primarily derives income as a contractor for the provision of government services, most prominently in the sectors of health, transport, justice, ...
(now known as InTransitBC) proposal for a fully automated, grade-separated system be accepted. This "best and final offer" bid was $343 million over the approved budget. The project was, however, brought within the funding allowance through various cost-trimming measures, including design changes, the contractor agreeing to lower its bid, and the province contributing another $65 million. * On December 1, 2004, the TransLink board gave final approval for the project. * On July 29, 2005, the final contract to design, build, and operate the RAV Line was signed by InTransitBC and TransLink. Serco was no longer a partner to InTransitBC, and two pension funds were brought into the partnership. * In October 2005, the utilities relocation and road work was started. * On November 25, 2005, the design of the new trains was unveiled, and
Hyundai Rotem Hyundai Rotem (founded in 1977) is a South Korean company that manufactures rolling stock, defense products and plant equipment. It is a part of the Hyundai Motor Group. Its name was changed from Rotem to Hyundai Rotem in December 2007 to refl ...
was announced as the supplier of the trains. It was announced that the new line would be called the Canada Line as a funding condition from the federal government. * The line opened at 1 p.m. local time on August 17, 2009, on budget and three and a half months ahead of schedule, and six months ahead of the
2010 Winter Olympics )'' , nations = 82 , athletes = 2,626 , events = 86 in 7 sports (15 disciplines) , opening = February 12, 2010 , closing = February 28, 2010 , opened_by = Governor General Michaëlle Jean , cauldron = Catriona Le May DoanNancy Greene Wayne G ...
held in Vancouver. It began normal revenue service on the following day. * On September 30, 2009, it was announced that the Canada Line had seen an average of 82,500 passengers per day since opening, putting it well on track to reach its ridership target of 100,000 per day within two years. * On December 28, 2009, it was revealed that the average daily ridership (including weekends) has grown to 93,000 and has occasionally exceeded 100,000, three years ahead of expectations. * On February 5, 2010, ridership reached a (then) record of 135,000 during a campaign to encourage residents to use transit prior to the Olympics. Further single-day records included 157,000 on February 11, 2010, and 210,000 on February 15, 2010, with all 20 trains running. * Overall, the
2010 Winter Olympics )'' , nations = 82 , athletes = 2,626 , events = 86 in 7 sports (15 disciplines) , opening = February 12, 2010 , closing = February 28, 2010 , opened_by = Governor General Michaëlle Jean , cauldron = Catriona Le May DoanNancy Greene Wayne G ...
saw the Canada Line's ridership increase by 118 percent to an average of 228,190 per day for 17 days, with a single-day record of 287,400 on February 19, 2010. Its regular non-Olympic ridership was stated as being 104,674 per weekday. * In February 2011, Translink revealed that the average daily ridership of the Canada Line had grown to 110,000 per day. * In September 2021, construction began for the
Capstan station Capstan is an elevated station under construction on the Canada Line of Metro Vancouver's SkyTrain rapid transit system. It will be located at the intersection of No. 3 Road and McMyn Way, one block north of Capstan Way in Richmond Richmond m ...
at Capstan Way, which is expected to open in 2022.


Project funding

The Canada Line was built as a public-private partnership. Funding was provided by both government agencies and a private partner, the proponent. As of March 2009, the entire project was expected to cost $2.054 billion. The premier of BC stated that the project was on budget and ahead of schedule. When approved in December 2004, the cost was given as $1.76 billion.Richmond keeps RAV on track, Joel Baglole and Jonathan Fowlie, with files from Jim Beatty and Frances Bula. The Vancouver Sun, November 30, 2004, pg. B.2 The public contributions to the budget come from the following sources: *
Government of Canada The government of Canada (french: gouvernement du Canada) is the body responsible for the federal administration of Canada. A constitutional monarchy, the Crown is the corporation sole, assuming distinct roles: the executive, as the ''Crown-i ...
: $450 million * Government of
British Columbia British Columbia (commonly abbreviated as BC) is the westernmost province of Canada, situated between the Pacific Ocean and the Rocky Mountains. It has a diverse geography, with rugged landscapes that include rocky coastlines, sandy beaches, for ...
: $435 million *
Vancouver Airport Vancouver International Airport is an international airport located on Sea Island in Richmond, British Columbia, serving the city of Vancouver and the Lower Mainland region. It is located from Downtown Vancouver. It is the second busiest ...
Authority: $300million * TransLink: $334 million * City of
Vancouver Vancouver ( ) is a major city in western Canada, located in the Lower Mainland region of British Columbia. As the most populous city in the province, the 2021 Canadian census recorded 662,248 people in the city, up from 631,486 in 2016. ...
: $29 million These sums are all in 2006 dollars, except for the government of Canada's contribution, which will be paid out when constructed, and is estimated to be equivalent of $419 million 2003 dollars. The private partner was expected to contribute $200 million, and be responsible for any construction cost overruns. As of November 7, 2009, InTransitBC has invested $750 million. InTransitBC is a joint venture company owned by SNC-Lavalin, the Investment Management Corporation of BC (bcIMC), and the
Caisse de dépôt et placement du Québec Caisse de dépôt et placement du Québec (CDPQ; ) is an institutional investor that manages several public and parapublic pension plans and insurance programs in Quebec. CDPQ was founded in 1965 by an act of the National Assembly, under the go ...
. The BC government had committed $370 million, but when the bid came in over budget, it contributed an extra $65 million. TransLink also put in extra money by committing money from the sale of the Sexsmith Park and Ride in Richmond and from the introduction of a special fare in the Airport Zone. In November 2004, bid costs were reduced by postponing the construction of a walkway between Waterfront station and the cruise ship terminal, removing Westminster station, and moving Richmond Centre station and the end of the line several hundred metres north. TransLink would further pay for the cost of reinstallation of the trolley wires along Cambie. As a way to further reduce the best and final offer, RAVCO no longer required that the proponent provide for 59 ticket vending machines and 38 ticket validating machines or for a police unit to operate on the RAV line. RAVCO also shifted responsibility for moving trolley wires from SNC-Lavalin to TransLink. Costs were also decreased due to decisions to single-track sections on the Richmond and airport branches. The Richmond branch was single-tracked from Ackroyd Road onward in large part due to Richmond's city council pressuring for the visual profile of the overhead line to be reduced for esthetic reasons. On July 11, 2006, a decision was made to relocate Broadway station half a block north at a cost of $3million to allow for better integration of the station with Broadway and a new development in the area. The funding was provided as follows: one third from the City of Vancouver, one third from TransLink, and one third from surplus funding available to CLCO. In February 2007, TransLink approved the addition of a pedestrian and bicycle path to the Canada Line Bridge and agreed not to postpone the construction of a station at 2nd Avenue (Olympic Village station), but instead build it to be ready when the line opens. The $10million cost of the bridge bike path was paid for by TransLink and not considered part of the cost of the Canada Line. The Olympic Village station cost an additional $29million.RAV bridge to take pedestrians, Frank Luba, The Province, February 17, 2005. pg. A.21 RAVCO was set up by the agencies funding the transit line to oversee project design, procurement, construction, and implementation. This TransLink subsidiary, later renamed Canada Line Rapid Transit Inc (CLCO), made distributions to the builder as work progressed. The table below lists the year-by-year contributions (in millions of dollars) made by various governments on a year-by-year basis up to December 31, 2008. Contributions by TransLink are total disbursements minus contributions from the City of Vancouver, the government of British Columbia, and the government of Canada. Calculations show that TransLink has contributed $271million to date. It has committed an additional $52million in its 2009 budget. The private sector will operate the line for 35 years in return for a share of its operating revenue. In early 2006, TransLink decided not to install turnstiles at Canada Line stations, but stations would be designed to accommodate controlled access to allow TransLink to install them for less cost if it wished to do so in the future. On April 9, 2009, TransLink, the provincial government, and the government of Canada announced joint funding of $100 million to introduce turnstiles at all 49 SkyTrain stations. While a large portion of this funding will be used on the Expo and Millennium Lines, a portion will be used on the Canada Line stations. The federal government is contributing $30 million and the province is adding $40 million toward fare gates, or controlled access gates.


Construction

Construction began in October 2005 and was completed in August 2009. At initial completion, the line comprised the following construction elements: In addition to the of track above, there are about of track in the OMC. File:Canada Line cut and cover construction 2007.JPG, Cut and cover construction on Cambie Street just south of 25th Avenue, February 23, 2007 File:Canada Line Construction, Vancouver, Cambie Street at 25th.jpg, Cut and cover construction on Cambie Street just north of 25th Avenue, February 23, 2007 File:Canada Line Construction 2007, Vancouver, BC.jpg, Cut and cover construction on Cambie Street between 41st and 49th Avenue, June 7, 2007 File:Canada Line Construction Vancouver 2007 Cambie and 41st.jpg, Cut and cover construction on Cambie Street at Cambie and 41st Avenue, June 7, 2007 File:Elevated guideway construction, YVR, Nov 18, 2006.jpg, Elevated guideway construction at YVR, November 18, 2006 File:Span to span launching or overhead cantilever truss system.PNG, Graphical representation of movement of truss system used to install guideway segments File:Elevated guideway construction, YVR, Nov 18, 2006, end view.jpg, Elevated guideway construction at YVR, November 18, 2006, end view File:Guideway segment installation, September 30, 2006.jpg, Detail of crane component of overhead cantilever truss system, September 30, 2006, near Sea Island Centre File:Canada Line TBM Installation, June 10, 2006, 3.jpg, TBM installation in preparation for boring tunnel under False Creek June 10, 2006 File:TBM Installation, June 10, 2006.jpg, TBM installation apparently required construction of round portals on south side of excavation, June 10, 2006 File:Bored tunnel, Oct 5, 2006.jpg, Configuration of site reflects support for tunnelling operation underway under False Creek Inlet on October 5, 2006 File:TBM Installation, June 10, 2006, 2.jpg, Detail of
tunnel boring machine A tunnel boring machine (TBM), also known as a "mole", is a machine used to excavate tunnels with a circular cross section through a variety of soil and rock strata. They may also be used for microtunneling. They can be designed to bore thro ...
showing wheels that allow the machine to roll along the round contoured concrete track. June 10, 2006.


Controversies

Opponents have claimed that the approval process was undemocratic and dishonest. They say that the projected ridership figures were grossly inflated; if actual ridership levels are less than projection, taxpayers and transit passengers may have to cover the shortfall in revenue. Opponents also argue that the official claim that the project had nothing to do with Vancouver's bid to host the
2010 Winter Olympics )'' , nations = 82 , athletes = 2,626 , events = 86 in 7 sports (15 disciplines) , opening = February 12, 2010 , closing = February 28, 2010 , opened_by = Governor General Michaëlle Jean , cauldron = Catriona Le May DoanNancy Greene Wayne G ...
was not credible.


Public-private partnerships

Opponents of the RAV line's public-private partnership (P3) believe it was politically motivated and that it will cost more money because of the private involvement. The private involvement has, however, allowed for construction costs to be known and fixed up front. After raising its contribution to $435 million, the BC minister of transport and premier reaffirmed that this was the final contribution and that any cost overruns would be the responsibility of the proponent. The Canadian Union of Public Employees opposed the use of a P3 to design, build, and operate the Canada Line. The P3 process did not allow precise plans to be developed with public consultation, but limited discussion to certain abstract parameters, while leaving actual design details to the private partner.


Ridership projections

Before the building of the line, TransLink had projected that it would require a 100,000 passenger/day average to reach the "break even point". They also projected that it would take about three years for capacity to reach this point and that TransLink would be responsible for the loss. However, the Canada Line reached its projected ridership goal in late 2010, three years early. In 2017, TransLink CEO Kevin Desmond suggested that the Canada Line was underbuilt for its ridership, especially because more people moved into
transit-oriented development In urban planning, transit-oriented development (TOD) is a type of urban development that maximizes the amount of residential, business and leisure space within walking distance of public transport. It promotes a symbiotic relationship between ...
s along the line following its completion.


Alignment and grade separation


Vancouver

Although the latest proposal for rapid transit did not include an option for rapid transit down the Arbutus corridor along the abandoned CPR right of way, Vancouver council reopened debate on this issue. Given that the rail right of way is currently zoned for transit use with space available for transit lines, running the line down the Arbutus corridor may have been more cost-effective than tunnelling under Cambie. The planners and RAVCO, however, countered that the Arbutus corridor does not have the major concentration of transit destinations and origins that exist along the Cambie Street corridor, such as
Vancouver City Hall Vancouver City Hall is home to Vancouver City Council in Vancouver, British Columbia, Canada. Located at 453 West 12th Avenue, the building was ordered by the Vancouver Civic Building Committee, designed by architect Fred Townley and Matheson, and ...
,
Vancouver General Hospital Vancouver General Hospital (locally known as VGH, or Vancouver General) is a medical facility located in Vancouver, British Columbia. It is the largest facility in the Vancouver Hospital and Health Sciences Centre (VHHSC) group of medical facilit ...
, Oakridge Centre, and
Langara College , mottoeng = Knowledge is Freedom , established = April 1, 1994 , type = Public , endowment = C$5.8 million , administrative_staff = , faculty = , president = Paula Burns , students = 22,000 , city = Vancouver, British Columbia , coun ...
, which are necessary to provide the ridership required for this project to be successful. Also the Arbutus corridor is longer than the Cambie corridor and would cause longer travel times. The Cambie corridor further had greater potential for future ridership growth. The Project Definition Report further specified that any service had to be able to travel from Waterfront station in downtown Vancouver to the airport in 25 minutes or less. At-grade transit, either along Cambie or the Arbutus corridor, was ruled out as a result. The reason or origin for this exact requirement was not specified, although travel times were considered an important factor in attracting new riders and in retaining existing riders, who were now required to make an extra transfer relative to the existing bus service. All partner contributions were made upon the specifications set in the Project Definition Report. Any "significant change" would allow each partner to reconsider its respective contribution. As the Arbutus corridor proposal could not meet the specifications, this could put participation of funding partners in jeopardy. Residents along Cambie Boulevard created the Cambie Boulevard Heritage Society in 1994, which opposed any alteration to a wide green centre median that is currently a grassy area with various species of trees, including cherry trees donated by the City of Yokohama on occasion of the 1967 Canadian Centennial. The residents had already been mobilized in 1989 in response to the possibility of elevated rail along Cambie Boulevard. In effect the residents were opposed to surface, trench, or elevated rail along much of Cambie Street. Even cut-and-cover construction raised concerns over construction impacts and temporary traffic diversions. Cost and ridership risks were also concerns to property tax–paying residents. Advertisements asked residents to join "to prevent Vancouver's worst traffic nightmare and from burdening ourselves and our children with unnecessary tax risks for years to come". The society suggested that the line instead be constructed along Arbutus, where its impact and cost would be minimal. Despite the society's concerns, one of the final two proposals for the Canada Line in 2004 involved a trench in the centre of Cambie Street from 49th to 64th Avenues. On June 18, 2004, the TransLink Board voted 6–6 to oppose sending the project to the "best and final offer" stage. Opponents of the project favoured a proposal to build a line along the Cambie corridor involving a minimal amount of tunnelling, at a saving of about $300 million over the previously fully grade-separated proposal. The province responded to the suggestion by withdrawing funding until after the 2010 Olympics; Minister of Transport Kevin Falcon said that such a change of scope could no longer be accommodated in the time left before 2010. Mayors and councillors sitting on the TransLink Board, however, could not come to an agreement on this alternate plan of action. The impasse created a stir in the business community, which joined together and called for the province to take over control of the project. "The Coalition FOR a Lower Mainland Rapid Transit Solution" in a newspaper ad called on the premier to "please rescue our rapid transit". The Vancouver Board of Trade, the Council of Tourism Associations, and Tourism Vancouver led the call on the premier. While the board ultimately voted to proceed, the incident had lasting repercussions for TransLink.


Richmond

When the results of the bidding process indicated that an elevated option in Richmond was the winning bid, Richmond council engaged in some last-minute opposition to the RAV line and refused to give RAVCO the green light. Objections to the elevated line included its visual impact and the impact and cost of any extensions into Richmond. The line would have varied impact on businesses along No. 3 Road. It was said that an at-grade option would cost an extra $90 million due to the need to purchase cars that could accommodate drivers. To meet travel-time criteria, it was also argued that several intersections would have to be closed. It was also said that an at-grade option would require a large wall to protect the track along No. 3 Road. In November 2004, a survey of 11,750 people was conducted by RAVCO to determine if people in Richmond supported an elevated or at-grade service in Richmond. Of the respondents, 58 percent favoured an elevated option. Even after the survey, however, another option was brought forward. On November 22, 2004, Richmond council considered whether an elevated guideway along No. 3 Road in Richmond was appropriate. If an at-grade service was not feasible, council had instructed staff to look into the possibility of relocating the elevated guideway further west, along Minoru Boulevard. In response, residents along Minoru Boulevard presented a petition containing 666 signatures opposing the Minoru alignment. In the petition they "indicated that if Translink and RAVCO were not prepared to construct an at-grade system on No. 3 Road, then the project should be abandoned in favour of bus service on No. 3 Road." When further surveys and public consultation conducted by city staff in December indicated that residents did not support the realignment along Minoru Boulevard, council was left to either turn down the development or support the best and final offer. They chose to go ahead with the project. As a final compromise, part of the elevated track in Richmond was single-tracked to reduce visual impact.


Impact on local businesses

For the entire consultation process, it was assumed that any underground construction along the Cambie corridor would be by bored tunnel. It was only upon the publication of the winning bid that it became apparent that the portion of the line from 64th to 2nd Avenues would be constructed using cut-and-cover construction. This raised concern over the disruption of local business on
Cambie Street Cambie Street is a street in Vancouver, British Columbia, Canada. It is named for Henry John Cambie, chief surveyor of the Canadian Pacific Railway's western division (as is Cambie Road, a major thoroughfare in nearby Richmond). There are two ...
. Businesses in
Yaletown Yaletown is an area of Downtown Vancouver, Canada, bordered by False Creek and Robson and Homer Streets. Formerly a heavy industrial area dominated by warehouses and rail yards, since the 1986 World's Fair it has been transformed into one of the ...
and No. 3 Road in Richmond would also be affected by the construction. Although construction in the downtown was mostly by bored tunnel, businesses in Yaletown were caught off guard when it turned out that Yaletown-Roundhouse station would be north of Pacific Boulevard on Davie Street, rather than south of Pacific Boulevard. InTransitBC responded by launching an advertising campaign promoting local business on the line. Despite these efforts, businesses on Cambie Street experienced significant loss of business. After numerous failed appeals to the provincial government for compensation, store operators unsuccessfully sued for compensation. However, since the completion of the Canada Line, the line has been linked to rising property values along Cambie Street and in Richmond.


Impact on expansion of other transit options

It had been pointed out that construction of the Canada Line would do little to improve transit or alleviate congestion on the Broadway corridor to UBC, which serves more than 100,000 weekday trips on bus services, with many trips continuing to
University of British Columbia The University of British Columbia (UBC) is a public research university with campuses near Vancouver and in Kelowna, British Columbia. Established in 1908, it is British Columbia's oldest university. The university ranks among the top thr ...
. In addition, the
Evergreen Extension The Evergreen Extension (previously known as the Evergreen Line) is a extension of the Millennium Line of Metro Vancouver's SkyTrain rapid transit system. The extension runs from Lougheed Town Centre in Burnaby to Lafarge Lake–Douglas in Co ...
rapid transit project was delayed (until 2016). As TransLink is solely responsible for funding bus operations, any shortage of funding may translate into cuts in bus service.


Hiring practices

There were several labour disputes related to wages and unionization between employees and contractors working on the construction of the Canada Line. To excavate the final of the tunnel underneath the downtown core a crew of 36 Latin American workers were brought to Canada from Costa Rica, Ecuador and Colombia in April 2006. The employer, a joint partnership of SELI Canada and SNC (Pacific) engaged workers to assemble the tunnel boring machine (TBM) and begin excavations. Pay stubs and testimony evidence from the workers indicated that they were paid US$1,000 monthly in exchange for 65-hour work weeks (less than $4 per hour). The Latin Americans, all on temporary work permits, joined the Construction and Specialized Workers Unions Local 1611 and, in a majority vote, won union certification on June 23, 2006. This was the first time in Canadian history that a group of temporary foreign workers in the construction industry had successfully exercised their right to form a union. Before the union had a chance to begin collective bargaining, workers' wages were increased to $14.21 per hour and hours were reduced to 40 hours per week with overtime concessions as required by BC labour law. The union was not consulted, and the unilateral pay raise led to an unfair labour practice complaint from the CSWU 1611. The BC Labour Relations Board (BCLRB) sided with the employer's (SELI–SNCP) explanation that there had been a mistake in calculations of wages during the months before the workers voted to join the union. The employer stalled negotiations for a collective agreement until they were ordered back to the bargaining table in August 2006 by the BCLRB. In September, bargaining broke down. On September 21, 2006, CSWU 1611 workers threatened a strike vote to bring the employer back to the bargaining table. After almost two years of litigation, the BC Labour Relations Board ruled against the union's claims of unfair labour practices. In a separate complaint, the union claimed discrimination against the workers based on their country of origin. Even with the newly imposed wage of $14.21 per hour, the Latin Americans were earning half the wages of European (Italian, Spanish and Portuguese) workers with whom they worked alongside and performed the same underground TBM operations. On November 9, 2007, the BC Human Rights Tribunal ruled that the Latin American workers had been intimidated to sign a petition against being represented by their union. The tribunal found that the workers were intimidated and coerced to sign a petition in the fear of possibly losing future job prospects with their employer. The petition would have prevented them from being represented by a union before the tribunal and would also have created evidence that could have jeopardized the ongoing investigation by the tribunal over perceived discrimination. Upon completion of the tunnels in March 2008, the workers were laid-off and returned to their home countries. Only five of the workers were re-hired by SELI after their arrival back to their home countries. On December 3, 2008, the BC Human Rights Tribunal found in favour of the discrimination complaint. The decision prohibits employers from discrimination based on a workers' country of origin. Migrant workers must not suffer wage discrimination based on low wage labour markets in their countries of origin. The Latin Americans workers were awarded the difference in wages with an additional $10,000 each in punitive damages. The total award averaged approximately $50,000 per worker or $2.5million. SELI Canada appealed the decision to the BC Supreme Court. In December 2012, SELI agreed to a settlement offer by the union. The Latin American workers voted unanimously to accept a settlement. The settlement provided payments worth 50% of the original award.


See also

* SkyTrain rolling stock


Notes


References


External links


The Canada Line website

Canada Line
TransLink's page for the line
High Risk – An Analysis of the Proposed Public-Private Partnership for the Richmond/Airport/Vancouver Rapid Transit Project
May 2003, by Blair Redlin, Report by the
Canadian Centre for Policy Alternatives The Canadian Centre for Policy Alternatives (CCPA) is an independent think tank in Canada. It has been described as "left leaning". The CCPA concentrates on economic policy, international trade, environmental justice and social policy. It is ...

TransLink
– regional transportation authority of
Metro Vancouver The Metro Vancouver Regional District (MVRD), or simply Metro Vancouver, is a Canadian political subdivision and corporate entity representing the metropolitan area of Greater Vancouver, designated by provincial legislation as one of the 28 ...
{{TransLink Services Airport rail links in Canada Railway lines opened in 2009 2009 establishments in British Columbia Transport in Greater Vancouver Transport in Richmond, British Columbia Public–private partnership projects in Canada Rapid transit lines in Canada