CRH2
   HOME

TheInfoList



OR:

The CRH2 Hexie (simplified Chinese: 和谐号; traditional Chinese: 和諧號; pinyin: Héxié Hào; literally: "Harmony") is one of the high-speed train models in
China China, officially the People's Republic of China (PRC), is a country in East Asia. It is the world's List of countries and dependencies by population, most populous country, with a Population of China, population exceeding 1.4 billion, slig ...
. The CRH2 is based on the E2-1000 Series
Shinkansen The , colloquially known in English as the bullet train, is a network of high-speed railway lines in Japan. Initially, it was built to connect distant Japanese regions with Tokyo, the capital, to aid economic growth and development. Beyond l ...
design from
Japan Japan ( ja, 日本, or , and formally , ''Nihonkoku'') is an island country in East Asia. It is situated in the northwest Pacific Ocean, and is bordered on the west by the Sea of Japan, while extending from the Sea of Okhotsk in the n ...
with the license purchased from a consortium formed of
Kawasaki Heavy Industries (or simply Kawasaki) is a Japanese Public company, public multinational corporation manufacturer of motorcycles, engines, Heavy equipment (construction), heavy equipment, aerospace and Military, defense equipment, rolling stock and ships, headq ...
,
Mitsubishi Electric , established on 15 January 1921, is a Japanese multinational electronics and electrical equipment manufacturing company headquartered in Tokyo, Japan. It is one of the core companies of Mitsubishi. The products from MELCO include elevators an ...
, and
Hitachi () is a Japanese multinational conglomerate corporation headquartered in Chiyoda, Tokyo, Japan. It is the parent company of the Hitachi Group (''Hitachi Gurūpu'') and had formed part of the Nissan ''zaibatsu'' and later DKB Group and Fuyo G ...
, and represents the second Shinkansen train model to be exported. In 2004, the Ministry of Railway in China purchased an initial 60 sets of the train from
Kawasaki Heavy Industries (or simply Kawasaki) is a Japanese Public company, public multinational corporation manufacturer of motorcycles, engines, Heavy equipment (construction), heavy equipment, aerospace and Military, defense equipment, rolling stock and ships, headq ...
with a maximum speed of . However, the newer versions of the CRH2 are not related to the E2-1000 Series despite having the same exterior shell.Japan Inc Shoots Itself on the Foot
/ref>


Variants


CRH2A

On October 20, 2004, the Ministry of Railway in China ordered 60 sets of CRH2A trains from
Kawasaki Heavy Industries (or simply Kawasaki) is a Japanese Public company, public multinational corporation manufacturer of motorcycles, engines, Heavy equipment (construction), heavy equipment, aerospace and Military, defense equipment, rolling stock and ships, headq ...
in
Japan Japan ( ja, 日本, or , and formally , ''Nihonkoku'') is an island country in East Asia. It is situated in the northwest Pacific Ocean, and is bordered on the west by the Sea of Japan, while extending from the Sea of Okhotsk in the n ...
. Along with 60 sets of Bombardier's Regina-based CRH1A, and 40 sets of
Alstom Alstom SA is a French multinational corporation, multinational rolling stock manufacturer operating worldwide in rail transport markets, active in the fields of passenger transportation, signalling, and locomotives, with products including the A ...
's
Pendolino Pendolino (from Italian ''pendolo'' "pendulum", and ''-ino,'' a diminutive suffix) is an Italian family of tilting trains used in Italy, Spain, Germany, Poland, Portugal, Slovenia, Finland, Russia, the Czech Republic, Slovakia, the UK, the US, ...
-based CRH5A, these train sets are consider as first batch of CRH trains. Each of the CRH2A set consists of 8 cars. The first 3 sets (CRH2-001A - CRH2-003A) were built in Japan, the next 6 sets (CRH2-004A - CRH2-009A) were delivered in
complete knock down A knock-down kit (also knockdown kit, knocked-down kit, or simply knockdown or KD) is a collection of parts required to assemble a product. The parts are typically manufactured in one country or region, then exported to another country or region ...
form and assembled by CSR Sifang Locomotive and Rolling Stock. The remaining 51 sets (CRH2-010A - CRH2-060A) were built by Sifang through technology transfer from Japan. The first train arrived at
Qingdao Qingdao (, also spelled Tsingtao; , Mandarin: ) is a major city in eastern Shandong Province. The city's name in Chinese characters literally means " azure island". Located on China's Yellow Sea coast, it is a major nodal city of the One Belt ...
port on March 8, 2006 with little fanfare, and was not even publicized in China. These trains have a maximum operation speed of and started providing high-speed train service from April 18, 2007, the date of the sixth national railway speed-up. According to Chinese and Japanese media, CRH2A trains started test trials ahead of commercial operation on the Shanghai-Hangzhou and Shanghai-Nanjing lines on January 28, 2007. On September 14, 2010, the Chinese MOR ordered additional 40 sets of CRH2A trains (CRH2-151A - CRH2-190A) from CSR Sifang.


CRH2B

In November 2007, the Ministry of Railway in China ordered 10 CRH2 sets with 16 cars per set (8M8T). These trains have been given designations CRH2B (CRH2-111B - CRH2-120B). Each CRH2B has three 1st seating cars (ZY), twelve 2nd seating cars (ZE), and one dining car (CA). Designed maximum operation speed is with a power of . The first units were delivered on June 29, 2008,关于动卧车票及CRH2系列列车的一些最新消息!
/ref> and came into service on the Hefei–Nanjing Passenger Railway on August 1, 2008.


CRH2C (CRH2-350)

After the introduction of the modified E2-1000 Series, Sifang built its own CRH2 with a maximum safe operating speed of . The original train sets imported from Kawasaki had a maximum safe operating speed of . During June 2005 and September 2005, The Chinese Ministry of Railways launched bidding for High speed trains with a top speed over . Along with
Siemens Siemens AG ( ) is a German multinational conglomerate corporation and the largest industrial manufacturing company in Europe headquartered in Munich with branch offices abroad. The principal divisions of the corporation are ''Industry'', ''E ...
's Velaro-based CRH3C, CSR Sifang bid 60 sets of CRH2C, includes 30 sets of CRH2C stage one with a top speed of , and 30 sets of CRH2C stage two with a top speed of . In development and research of the high speed train, The CRH2-300 project was launched by Chinese MOR and CSR. In 2006 the China Development Bank provided CNY 15 billion developmental financial loans to CSR Group for the projects of high speed trains. Over 50 academics, 150,000 technicians, 600
contractors A general contractor, main contractor or prime contractor is responsible for the day-to-day oversight of a construction site, management of vendors and trades, and the communication of information to all involved parties throughout the course of ...
were involved in the project.High Speed Rail (HSR) in China: 5 Years Equals 40 Years
This train's livery is not like the CRH2A, which the blue stripe does not end at the fronts of trainsets.


CRH2C stage one

CRH2C Stage one is a modified version of CRH2A. It has a maximum operating speed up to by replacing two intermediate trailer cars with motorized cars. Equipped with an array of the state-of-the-art technologies, including aluminum alloy body with a reduced weight, high speed turntable, high speed pantograph, and optic-fiber based integrated control system. Chinese MOR ordered 30 sets of CRH2C stage one, name code CRH2-061C - CRH2-090C. The first set, CRH2-061C was unveiled on December 22, 2007. During the test on April 22, 2008, CRH2-061C reached a top speed of over on Beijing-Tianjin high-speed rail. During the test on December 11, 2009, CRH2-061C reached a top speed of on Zhengzhou-Xi'an high-speed rail. Together with CRH3C, the CRH2C stage one first came into service on Beijing-Tianjin Intercity high-speed rail on August 1, 2008, and all CRH2C stage one trains have been replaced by CRH3C in April, 2009. Currently, most of these trains are serving on the Shanghai-Nanjing high speed rail.


CRH2C stage two

CRH2C Stage two is the "re-design" version of the CRH2. Some of the details, like the aluminum body structure, noise reduction technology & reduction technique, draw on the CRH3C. According to CSR Sifang, the improvements include the following aspects: * The axle weight of the bogie increased from , to prevent tremble of the train body at a higher speed, the gear ratio has been optimized from 3.036 to 2.379, the critical instability speed is . * The thermal capacity of the bogie has been increased, which satisfied the continuous operation at * With the YQ-365 type AC traction motor. It has a maximum operating speed up to with a power of . * The rigidity of the car body has been increased to lower the noise and vibration. * Optimized car body and window design for better air tightness and strength. * Added pressure protection system to avoid pressure fluctuation in the compartment and improvement of comfort. * Optimized design of the roof antenna, exterior windscreen and windows for a lower air resistance. Chinese MOR ordered 30 sets of CRH2C stage two, name code CRH2-091C - CRH2-110C and CRH2-141C - CRH2-150C. The first set, CRH2-091C was unveiled in January 2010 and came into service on Zhengzhou-Xi'an high-speed rail in February, 2010.


CRH2E

In November and December 2007, the Ministry of Railway in China ordered 20 CRH2 sleeper trains with 16 cars per set (8M8T). These trains are modified CRH2Bs, outfitted with traditional railway sleeping berths ( couchette car) and have been given designations CRH2E (numbered CRH2-121E - CRH2-140E). Each CRH2E has thirteen 1st class sleeping cars (WR), two 2nd class seating cars (ZE), and one buffet car (CA) or one second class/dining car (ZEC). Designed maximum operation speed is with of power output. The first batch of CRH2E, CRH2-121E - CRH2-126E, came into service on Beijing-Shanghai railway on December 21, 2008. On 23 July 2011, one sleeper coach on CRH2-139E trainset has been derailed in the
2011 Wenzhou train collision The Wenzhou train collision occurred on 23 July 2011 when two high-speed trains travelling on the Yong-Tai-Wen railway line collided on a viaduct in Lucheng District, Wenzhou, Zhejiang province, People's Republic of China. The two trains d ...
, together with CRH1-046B. The rest of CRH2Es were deployed on Beijing–Guangzhou–Shenzhen–Hong Kong High-Speed Railway since January 2015, operating overnight sleeper trains between Beijing and Guangzhou (including some trains to Shenzhen).


Double Deck CRH2E

A brand new variant of the CRH2E entered service in 2017 numbered beyond CRH2E-2463. Instead of a traditional railway sleeping berth the sleeper train is organized with the corridor running down the middle of the traincar with double deck "capsules" on each side. Each capsule is similar in layout to airplane first class, and passengers are no longer sharing the room. Each capsule comes with independent tables, outlets, lamps, hangers and curtains. The body of the train is redesigned to reduce noise levels during travel. The trains have been dubbed "moving hotels".


CRH2G

CRH2G is a specialized cold and sand/windstorm resistant version of the CRH2 manufactured by
CRRC Qingdao Sifang CRRC Qingdao Sifang Co., Ltd. () is a Chinese rolling stock manufacturer based in Qingdao, Shandong province. Founded in 1900 during the German occupation, Qingdao Sifang is one of the oldest rolling stock manufacturers in China. History Qi ...
. The trains were tested on the Lanzhou–Xinjiang HSR and Harbin–Dalian HSR. Tests where completed on November 10, 2015 and the first sets were assigned to Lanzhou–Xinjiang HSR.


CRH2-380

In 2008, the Chinese MOR & CSR launched CRH2-380 project, the main purpose is to develop new-generation of high speed trains with maximum operation speed of . CRH2 is one of the fundamental platforms of the new trains, which is designated as CRH380A.


Formation

At the time of the sixth national railway speed-up, at least 37 CRH2A sets had been delivered by Kawasaki and Sifang.52列動車組將投入運營 37列為南車四方制造的和諧號CRH2型
,
Science and Technology Daily ''Science and Technology Daily'' (, Keji Ribao) is the official newspaper of the Ministry of Science and Technology of the People's Republic of China. It is published in Chinese and based in Beijing. Historically, it was one of the few Chinese ...
In 2008, all 60 CRH2A sets had been delivered by Kawasaki. The post-2008 production model of the CRH2 are designed and made solely by Sifang with a maximum safe operation speed of . Power Destination * M - Motor car * T - Trailer car * C - Driver cabin * P - Pantograph Coach Type * ZY - First Class Coach * ZE - Second Class Coach * ZYE - First Class/Second Class Coach * ZEC - Second Class Coach/Buffet Car * CA - Buffet Car * WR - Soft Sleeper Car * WRC - Soft Sleeper Car / Dining Coach CRH2A First Class Coach 200908.jpg, First Class Coach 201603 ZE Interior of CRH2A-2006.JPG, Second Class Coach Buffet Car of CRH2B.JPG, Buffet Car Buffet Car of CRH2E.JPG, The
buffet car A buffet car is a passenger car of a train, where food and beverages can be bought at a counter and consumed.CRH 1-046B was stopped by a power failure or a faulty signal hit by lightning. The light that the second train was supposed to stop at was hit by lightning, malfunctioned and showed a green signal while it was supposed to be red. The second train was a CRH 2-139E. The CRH2 front cars fell off the viaduct and one standing at a 90° angle between the viaduct and the ground. The cars that fell to the ground are cars 1-3 and the fourth one was the one standing.


Distribution

:


See also

* China Railway CRH1 *
China Railway CRH3 The CRH3 Hexie (simplified Chinese: 和谐号; traditional Chinese: 和諧號; pinyin: Héxié Hào; literally: "Harmony") is a version of the Siemens Velaro high-speed train used in China on the Beijing–Tianjin intercity railway line, Wuha ...
* China Railway CRH5 *
China Railway CRH380A The CRH380A Hexie (train), Hexie (simplified Chinese: 和谐号; traditional Chinese: 和諧號; pinyin: Héxié Hào; literally: "Harmony") is a Chinese electric high-speed train that was developed by CSR Corporation Limited (CSR) and is current ...
* China Railway CRH6 *
China Railway CIT trains China Railway comprehensive inspection trains, or CITs, are high-speed test trains used on the high-speed rail network of China and the Jakarta-Bandung High Speed Rail in Indonesia are normally owned and operated by China Railway or the China A ...
*
List of high-speed trains The following is a list of high-speed trains that have been, are, or will be in commercial service. A high-speed train High-speed rail (HSR) is a type of rail system that runs significantly faster than traditional rail, using an integrate ...


References


External links

* {{DEFAULTSORT:China Railways Crh2
CRH2 The CRH2 Hexie (simplified Chinese: 和谐号; traditional Chinese: 和諧號; pinyin: Héxié Hào; literally: "Harmony") is one of the high-speed train models in China. The CRH2 is based on the E2-1000 Series Shinkansen design from Japan wi ...
Electric multiple units of China Kawasaki multiple units CRRC multiple units Passenger trains running at least at 250 km/h in commercial operations CSR Sifang Co Ltd. Passenger trains running at least at 200 km/h in commercial operations 25 kV AC multiple units