BC Hydro
   HOME

TheInfoList



OR:

The British Columbia Hydro and Power Authority, operating as BC Hydro, is a Canadian
electric utility An electric utility is a company in the electric power industry (often a public utility) that engages in electricity generation and distribution of electricity for sale generally in a regulated market. The electrical utility industry is a majo ...
in the province of
British Columbia British Columbia (commonly abbreviated as BC) is the westernmost province of Canada, situated between the Pacific Ocean and the Rocky Mountains. It has a diverse geography, with rugged landscapes that include rocky coastlines, sandy beaches, for ...
. It is the main electricity distributor, serving more than 4 million customers in most areas, with the exception of the City of New Westminster, where the city runs its own electrical department and portions of the
West Kootenay The Kootenays or Kootenay ( ) is a region of southeastern British Columbia. It takes its name from the Kootenay River, which in turn was named for the Kutenai First Nations people. Boundaries The Kootenays are more or less defined by the Koot ...
,
Okanagan The Okanagan ( ), also known as the Okanagan Valley and sometimes as the Okanagan Country, is a region in the Canadian province of British Columbia defined by the basin of Okanagan Lake and the Canadian portion of the Okanagan River. It is par ...
, the
Boundary Country The Boundary Country is a historical designation for a district in southern British Columbia lying, as its name suggests, along the boundary between Canada and the United States. It lies to the east of the southern Okanagan Valley and to the west ...
and Similkameen regions, where FortisBC, a subsidiary of Fortis Inc. directly provides electric service to 213,000 customers and supplies municipally owned utilities in the same area. As a provincial
Crown corporation A state-owned enterprise (SOE) is a government entity which is established or nationalised by the ''national government'' or ''provincial government'' by an executive order or an act of legislation in order to earn profit for the government ...
, BC Hydro reports to the BC Ministry of Energy, Mines and Low Carbon Innovation, and is regulated by the
British Columbia Utilities Commission The British Columbia Utilities Commission (BCUC) is an independent agency of the government of the Province of British Columbia responsible for regulating rates and standards of service quality. The Commission's primary responsibility is the regu ...
(BCUC). Its mandate is to generate, purchase, distribute and sell electricity. BC Hydro operates 32
hydroelectric Hydroelectricity, or hydroelectric power, is electricity generated from hydropower (water power). Hydropower supplies one sixth of the world's electricity, almost 4500 TWh in 2020, which is more than all other renewable sources combined an ...
facilities and three
natural gas Natural gas (also called fossil gas or simply gas) is a naturally occurring mixture of gaseous hydrocarbons consisting primarily of methane in addition to various smaller amounts of other higher alkanes. Low levels of trace gases like carbon d ...
-fueled thermal power plants. As of 2014, 95 per cent of the province's electricity was produced by hydroelectric generating stations, which consist mostly of large hydroelectric dams on the
Columbia Columbia may refer to: * Columbia (personification), the historical female national personification of the United States, and a poetic name for America Places North America Natural features * Columbia Plateau, a geologic and geographic region i ...
and
Peace Peace is a concept of societal friendship and harmony in the absence of hostility and violence. In a social sense, peace is commonly used to mean a lack of conflict (such as war) and freedom from fear of violence between individuals or groups. ...
rivers. BC Hydro's various facilities generate between 43,000 and 54,000 gigawatt hours of electricity annually, depending on prevailing water levels. BC Hydro's nameplate capacity is about 11,000 megawatts.
Electricity Electricity is the set of physical phenomena associated with the presence and motion of matter that has a property of electric charge. Electricity is related to magnetism, both being part of the phenomenon of electromagnetism, as describe ...
is delivered through a network of 18,286 kilometers of transmission lines and 55,254 kilometers of distribution lines. For the 2013-2014 fiscal year, the domestic electric sales volume was 53,018 gigawatt hours, revenue was and net income was .


History

BC Hydro was created in 1961 when the government of British Columbia, under Premier
W. A. C. Bennett William Andrew Cecil Bennett (September 6, 1900 – February 23, 1979) was a Canadian politician. He was the 25th premier of British Columbia from 1952 to 1972. With just over 20 years in office, Bennett was and remains the longest-serving prem ...
, passed the ''BC Hydro Act''. This act led to the expropriation of the BC Electric Company and its merging with the BC Power Commission, to create the British Columbia Hydro and Power Authority (BCHPA). The BC Power Commission had been established with the Electric Power Act in 1945 by Premier John Hart. The mandate of the Power Commission was to amalgamate existing power and generating facilities across the province not served by BC Electric, and to extend service to the many smaller communities without power. BC Electric Company began as the
British Columbia Electric Railway The British Columbia Electric Railway (BCER) was an historic railway which operated in southwestern British Columbia, Canada. Originally the parent company for, and later a division of, BC Electric Company (now BC Hydro), the BCER assumed contr ...
(streetcar and lighting utility) in Victoria,
Vancouver Vancouver ( ) is a major city in western Canada, located in the Lower Mainland region of British Columbia. As the most populous city in the province, the 2021 Canadian census recorded 662,248 people in the city, up from 631,486 in 2016. ...
and New Westminster in 1897. Power was generated by coal-fired steam plants. Increasing demand in the
Edwardian The Edwardian era or Edwardian period of British history spanned the reign of King Edward VII, 1901 to 1910 and is sometimes extended to the start of the First World War. The death of Queen Victoria in January 1901 marked the end of the Victori ...
boom years meant BC Electric sought expansion through developing Hydro power at Buntzen Lake, and later at Stave Lake. Sensible growth and expansion of the power, streetcar and
coal gas Coal gas is a flammable gaseous fuel made from coal and supplied to the user via a piped distribution system. It is produced when coal is heated strongly in the absence of air. Town gas is a more general term referring to manufactured gaseous ...
utilities meant that BC Electric was a major company in the region. Also about this time, sawmills and factories converted to electricity, further increasing the demand for electric power. BC Electric developed more hydro stations in the province. Similarly, small towns also built and operated their own power stations. More power transmission lines were also built. Dams and hydro-electric generating stations were built on Vancouver Island on the Puntledge,
Jordan Jordan ( ar, الأردن; tr. ' ), officially the Hashemite Kingdom of Jordan,; tr. ' is a country in Western Asia. It is situated at the crossroads of Asia, Africa, and Europe, within the Levant region, on the East Bank of the Jordan Rive ...
, and Elk rivers in the 1920s. By the time of the
First World War World War I (28 July 1914 11 November 1918), often abbreviated as WWI, was List of wars and anthropogenic disasters by death toll, one of the deadliest global conflicts in history. Belligerents included much of Europe, the Russian Empire, ...
, private cars and jitneys were beginning to affect streetcar traffic. New dams were planned, including the diversion from the Bridge River to Seton Lake, near Lillooet, but the economic depression of the 1930s halted this business expansion. Also with the depression came an increase in the ridership, and a decrease in the maintenance of the streetcar system. In 1947, the BC Power Commission completed the John Hart Generating Station at Campbell River. In the early 1950s the ageing streetcars and interurban trains were replaced by electric trolley buses, and diesel buses. BC Electric finally completed the Bridge River Generating Station in 1960. In 1958, BC Electric began construction of the oil-fired (later converted to natural gas) Burrard Generating Station near Port Moody. It opened in 1961 and operated only intermittently when needed. In 2001, it represented over 9% of BC Hydro's gross metered generation. Burrard Generating Station was decommissioned in 2016 after the completion of enough replacement capacity at the Mica Generating Station. With completion of new transmission capacity to the Lower Mainland from the interior of BC, Burrard Generating Station is being converted into a large synchronous condenser facility. On August 1, 1961, just days after company president Dal Grauer died, the BC government passed the legislation which changed BC Electric from a private company to a
crown corporation A state-owned enterprise (SOE) is a government entity which is established or nationalised by the ''national government'' or ''provincial government'' by an executive order or an act of legislation in order to earn profit for the government ...
known as BC Hydro. In 1988, BC Hydro sold its Gas Division which distributed
natural gas Natural gas (also called fossil gas or simply gas) is a naturally occurring mixture of gaseous hydrocarbons consisting primarily of methane in addition to various smaller amounts of other higher alkanes. Low levels of trace gases like carbon d ...
in the lower mainland and Victoria to Inland Natural Gas. Inland was acquired by
Terasen Gas FortisBC is a Canadian owned, British Columbia based regulated utility focused on providing safe and reliable energy, including natural gas, Renewable Natural Gas, electricity and propane. FortisBC has approximately 2,600 employees serving more t ...
in 1993.


Modern era

Between 1960 and 1980, BC Hydro completed six large hydro-electric generating projects. The first large dam was built on the
Peace River The Peace River (french: links=no, rivière de la Paix) is a river in Canada that originates in the Rocky Mountains of northern British Columbia and flows to the northeast through northern Alberta. The Peace River joins the Athabasca River in ...
near Hudson's Hope. The
W. A. C. Bennett Dam The W. A. C. Bennett Dam is a large hydroelectric dam on the Peace River in northern British Columbia, Canada. At high, it is one of the world's highest earth fill dams. Construction of the dam began in 1961 and culminated in 1968. At the da ...
was built to create an energy reservoir for the Gordon M. Shrum Generating Station, which has a capacity of 2,730 Megawatts of electric power and generated 13,810 gigawatt-hours of electricity per year on average 2012–16. When it was completed in 1968, the dam was the largest earth-fill structure ever built. The
Williston Lake Williston Lake is a reservoir created by the W. A. C. Bennett Dam and is located in the Northern Interior of British Columbia, Canada. Geography The lake fills the basin of the upper Peace River, backing into the Rocky Mountain Trench which i ...
reservoir is the largest lake in British Columbia. A second smaller concrete dam was later built downstream, closer to Hudson's Hope for the Peace Canyon Generating Station which was completed in 1980. Under the terms of the
Columbia River The Columbia River ( Upper Chinook: ' or '; Sahaptin: ''Nch’i-Wàna'' or ''Nchi wana''; Sinixt dialect'' '') is the largest river in the Pacific Northwest region of North America. The river rises in the Rocky Mountains of British Columbia ...
Treaty with the US, BC Hydro built a number of dams and hydro-electric generating stations including two large projects at
Mica Micas ( ) are a group of silicate minerals whose outstanding physical characteristic is that individual mica crystals can easily be split into extremely thin elastic plates. This characteristic is described as perfect basal cleavage. Mica is ...
and Revelstoke on the Columbia River. The Keenleyside Dam on the Columbia River north of Castlegar and the Duncan Dam north of Kootenay Lake were also built under the same treaty and are used mainly for water control. Two generators were installed at Keenleyside in 2002, though these are owned and operated by the Columbia Power Corporation (a separate Crown Corporation). Kootenay Canal Generating Station on the
Kootenay River The Kootenay or Kootenai river is a major river in the Northwest Plateau, in southeastern British Columbia, Canada, and northern Montana and Idaho in the United States. It is one of the uppermost major tributary, tributaries of the Columbia Ri ...
between Nelson and Castlegar was completed in 1976. The
Seven Mile Dam Seven Mile Dam is a concrete gravity-type hydroelectric dam on the Pend d'Oreille River 15 km SE of Trail, 18 km downstream from Boundary Dam and 9 km upstream from Waneta Dam in the Canadian province of British Columbia. The power ...
and Generating Station on the
Pend d'Oreille River The Pend Oreille River ( ) is a tributary of the Columbia River, approximately long, in northern Idaho and northeastern Washington in the United States, as well as southeastern British Columbia in Canada. In its passage through British Colum ...
near Trail were completed in 1979. In the late 1970s and early 1980s BC Hydro investigated the feasibility of geothermal power production at Meager Creek, north of Pemberton. They concluded from their testing that the underground rock wasn't permeable enough to justify large-scale production of electricity. Around the same time, BC Hydro initiated a project to develop a coal-fired thermal generating station at Hat Creek near Cache Creek, but abandoned the effort in 1981 due to strong environmental opposition. In 1989 the Power Smart and Resource Smart programs were initiated by BC Hydro to promote energy conservation as an alternative to the cost of creating new generating facilities. Since 2001, BC Hydro has focused on its conservation and energy efficiency programs, re-investing in its existing facilities, and purchasing clean,
renewable energy Renewable energy is energy that is collected from renewable resources that are naturally replenished on a human timescale. It includes sources such as sunlight, wind, the movement of water, and geothermal heat. Although most renewable energy ...
from Independent Power Producers. According to the "British Columbia Energy Plan", released in 2007, BC Hydro must ensure that clean or renewable electricity generation continues to account for at least 90 percent of total generation. As of 2014, 97 percent of BC Hydro's electricity generation comes from clean or renewable sources and this generation only emits 730,000 tonnes of annually from thermal plants.


Organization and financial performance

In 1980 the BC Government established the BC Utilities Commission (BCUC) to regulate public energy utilities and to act as an independent, quasi-judicial regulatory agency regarding energy rates. In 2003 the BC government passed several pieces of legislation to redefine and regulate power utilities in British Columbia. The Transmission Corporation Act created the British Columbia Transmission Corporation (BCTC) which plans, operates and maintains the transmission system owned by BC Hydro. Also in 2003, BC Hydro privatized the services provided by 1540 of its employees in its Customer Service, Westech IT Services, Network Computer Services, Human Resources, Financial Systems, Purchasing, and Building and Office Services groups. These services are now provided under contract by
Accenture Accenture plc is an Irish-American professional services company based in Dublin, specializing in information technology (IT) services and consulting. A ''Fortune'' Global 500 company, it reported revenues of $61.6 billion in 2022. Accentu ...
.


Site C Dam

While BC Hydro initially looked at Site C on the Peace River near Fort St. John in the late 1950s, it wasn't until 1982 that it submitted a Site C development project to the
British Columbia Utilities Commission The British Columbia Utilities Commission (BCUC) is an independent agency of the government of the Province of British Columbia responsible for regulating rates and standards of service quality. The Commission's primary responsibility is the regu ...
(BCUC). It was turned down by the BCUC at that time. Another attempt to revive it in the 1990s was blocked by environmental concerns. In 2004 the BC government's Energy Plan instructed BC Hydro to begin discussions with First Nations, the Province of Alberta and communities to discuss Site C as a future option. In May 2014, a federal-provincial Joint Review Panel released a report into the project's environmental, economic, social, heritage, and health effects. A notice of Site C construction commencing in 2015 was issued July 2015. Revelstoke Dam built in 1984 was the last new dam built by BC Hydro.


Independent Power Producers

The BC Hydro Public Power Legacy and Heritage Contract Act requires BC Hydro to meet the province's future needs for power through private developers. These acts have allowed Independent Power Producers (IPPs) to sell power to BC Hydro, which is required by law to buy it from them even at a loss. In 2011 BC Hydro spent $567.4 million on electricity from IPPs. In 2013, BC Hydro had 127 Electricity Purchase Agreements in its supply portfolio, representing 22,200 gigawatt hours of annual energy and over 5,500 megawatts of capacity. In 2013 those purchases will be $781.8 million in 2013 and $939.8 million in 2014, representing about 20% of domestic supply.


Exports

BC Hydro exports and imports electric power through its wholly owned power marketing and trading subsidiary, Powerex, which was established in 1988. Powerex also markets the Canadian Entitlement energy from the Columbia River Treaty. BC Hydro belongs to a power sharing consortium which includes electric utilities in Alberta, Washington, Oregon, Idaho and California. In 2013 British Columbia's minister of energy and mines, Bill Bennett spoke to why BC Hydro was agreeing to a $750 million settlement with California over claims Powerex manipulated electricity prices.


Financial performance


Renewable energy and conservation initiatives

BC Hydro's Power Smart program encourages energy conservation among its residential, commercial, and industrial customers. The program also aims to promote energy saving retail products and building construction, and includes a "Sustainable Communities Program". Its in-house Resource Smart program is used to identify and implement efficiency gains at existing BC Hydro facilities. BC Hydro also practices energy conservation at its generating facilities through the continuous monitoring and efficient use of the water resources used to power its generators. BC Hydro is committed by the BC government's Energy Plan to achieve electric power self-sufficiency in the province by 2016, with all new generation plants having zero net greenhouse gas emissions by the same year. In 2013, BC Hydro released an Integrated Resource Plan which includes meeting at least 66 percent of the expected increase in electricity demand through increased energy efficiency. BC Hydro has also entered into energy purchase contracts with a new category of company created by special legislation, Independent Power Producers (IPPs) to buy electricity generated from intermittent renewable sources, mainly from small capacity
run of river Run-of-river hydroelectricity (ROR) or run-of-the-river hydroelectricity is a type of hydroelectric generation plant whereby little or no water storage is provided. Run-of-the-river power plants may have no water storage at all or a limited amou ...
hydro and more recently, wind power, wood residue energy, and energy from organic municipal waste. There has been some criticism of this policy on the basis that it will result in Hydro paying significantly higher rates to private producers than it would have if the power were self-generated. BC has a policy not to develop nuclear power. As of July 2018, BC Hydro operated 58
electric vehicle An electric vehicle (EV) is a vehicle that uses one or more electric motors for propulsion. It can be powered by a collector system, with electricity from extravehicular sources, or it can be powered autonomously by a battery (sometimes ch ...
charging stations in the province.


Cost of Electricity

In November 2013 the BC Minister of Energy and Mines announced a 10-year plan that will keep electricity rates as low as possible. Increases during the first five years will be between 9 and 3 percent annually. BC Hydro's profitability is affected by its large debt, estimated to reach five billion dollars by 2017.


Smart Meters

BC Hydro's Smart Metering Program in 2011 introduced the installation of Itron C2S0D
Smart meter A smart meter is an electronic device that records information such as consumption of electric energy, voltage levels, current, and power factor. Smart meters communicate the information to the consumer for greater clarity of consumption be ...
s as mandatory. In 2013 BC Hydro offered the Meter Choices Program for $20 to $30 monthly.


See also

* 2015 British Columbia blackout * Columbia Power Corporation * FortisBC * Alberta interdependence * Energy in Canada * List of power stations in British Columbia *
List of power stations in Canada Canada is home to a wide variety of power stations (or generating stations). The lists below outline power stations of significance by type, or by the province/territory in which they reside. By type The following pages lists the power stations ...
* Western North America Interconnection


References


External links

*
Power Pioneers

Small grid map
!--from http://knowbc.com/limited/Books/Encyclopedia-of-BC/B/BC-Hydro-and-Power-Authority . Voltage at https://www.eia.gov/todayinenergy/images/2012.11.27/electricitymap.png --> {{DEFAULTSORT:Bc Hydro * Companies based in Vancouver Crown corporations of British Columbia Electric power companies of Canada Energy companies established in 1961 Hydroelectric power companies of Canada 1961 establishments in British Columbia Canadian companies established in 1961