Apollo 5
   HOME

TheInfoList



OR:

Apollo 5 (launched January 22, 1968), also known as AS-204, was the uncrewed first flight of the
Apollo Lunar Module The Apollo Lunar Module (LM ), originally designated the Lunar Excursion Module (LEM), was the lunar lander spacecraft that was flown between lunar orbit and the Moon's surface during the United States' Apollo program. It was the first crewed ...
(LM) that would later carry
astronaut An astronaut (from the Ancient Greek (), meaning 'star', and (), meaning 'sailor') is a person trained, equipped, and deployed by a human spaceflight program to serve as a commander or crew member aboard a spacecraft. Although generally r ...
s to the surface of the Moon. The
Saturn IB The Saturn IB (also known as the uprated Saturn I) was an American launch vehicle commissioned by the National Aeronautics and Space Administration (NASA) for the Apollo program. It uprated the Saturn I by replacing the S-IV second stage (, 43 ...
rocket bearing the LM lifted off from Cape Kennedy on January 22, 1968. The mission was successful, though due to programming problems an alternate mission to that originally planned was executed. Like Apollo 4, this flight was long delayed, due in part to setbacks in development of the LM, manufactured by
Grumman Aircraft The Grumman Aircraft Engineering Corporation, later Grumman Aerospace Corporation, was a 20th century American producer of military and civilian aircraft. Founded on December 6, 1929, by Leroy Grumman and his business partners, it merged in 199 ...
. The original Saturn IB rocket that was to take the first LM (LM-1) to space was taken down during the delays and replaced with the one that would have launched
Apollo 1 Apollo 1, initially designated AS-204, was intended to be the first crewed mission of the Apollo program, the American undertaking to land the first man on the Moon. It was planned to launch on February 21, 1967, as the first low Earth orbit ...
if the spacecraft fire that killed three astronauts had not taken place. LM-1 arrived at the
Kennedy Space Center The John F. Kennedy Space Center (KSC, originally known as the NASA Launch Operations Center), located on Merritt Island, Florida, is one of the National Aeronautics and Space Administration's (NASA) ten field centers. Since December 196 ...
in June 1967; the following months were occupied in testing and placing the LM atop the Saturn IB. After final delays due to equipment trouble, the countdown began on January 21, 1968, and the space vehicle was launched the following day. Once the craft reached orbit and the LM separated from the S-IVB booster, the program of orbital testing began, but a planned burn was aborted automatically when the
Apollo Guidance Computer The Apollo Guidance Computer (AGC) was a digital computer produced for the Apollo program that was installed on board each Apollo command module (CM) and Apollo Lunar Module (LM). The AGC provided computation and electronic interfaces for guidanc ...
detected the craft was not going as fast as planned. Flight Director
Gene Kranz Eugene Francis "Gene" Kranz (born August 17, 1933) is an American aerospace engineer who served as NASA's second Chief Flight Director, directing missions of the Mercury, Gemini and Apollo programs, including the first lunar landing mission, Ap ...
and his team at Mission Control in
Houston Houston (; ) is the most populous city in Texas, the most populous city in the Southern United States, the fourth-most populous city in the United States, and the sixth-most populous city in North America, with a population of 2,304,580 ...
quickly decided on an alternate mission, during which the mission's goals of testing LM-1 were accomplished. The mission was successful enough that a contemplated second uncrewed mission to test the LM was cancelled, advancing
NASA The National Aeronautics and Space Administration (NASA ) is an independent agency of the US federal government responsible for the civil space program, aeronautics research, and space research. NASA was established in 1958, succeedin ...
's plans to land an astronaut on the Moon by the end of the 1960s.


Background

In 1961, United States President John F. Kennedy challenged his nation to land an astronaut on the
Moon The Moon is Earth's only natural satellite. It is the fifth largest satellite in the Solar System and the largest and most massive relative to its parent planet, with a diameter about one-quarter that of Earth (comparable to the width of ...
by the end of the decade, with a safe return to Earth. After considerable debate,
NASA The National Aeronautics and Space Administration (NASA ) is an independent agency of the US federal government responsible for the civil space program, aeronautics research, and space research. NASA was established in 1958, succeedin ...
(the US government's spaceflight agency) decided in late 1962 that lunar missions would use a lunar orbit rendezvous in which the complete
Apollo spacecraft The Apollo spacecraft was composed of three parts designed to accomplish the American Apollo program's goal of landing astronauts on the Moon by the end of the 1960s and returning them safely to Earth. The expendable (single-use) spacecraft ...
would be propelled towards lunar orbit by the
Saturn V Saturn V is a retired American super heavy-lift launch vehicle developed by NASA under the Apollo program for human exploration of the Moon. The rocket was human-rated, with multistage rocket, three stages, and powered with liquid-propellant r ...
launch vehicle's third stage (called the S-IVB). Once in lunar orbit, those astronauts who would land on the Moon would enter what was then called the lunar excursion module (LEM) (later called the
lunar module The Apollo Lunar Module (LM ), originally designated the Lunar Excursion Module (LEM), was the lunar lander spacecraft that was flown between lunar orbit and the Moon's surface during the United States' Apollo program. It was the first crewed ...
(LM)). This craft would separate from the Apollo's command and service module (CSM) and land on the Moon. When the astronauts were ready to return, they would enter the LM, take off, and re-dock with the CSM. Once the crew reentered the CSM, they would discard the lunar module and return to Earth in the CSM. In 1962, NASA invited eleven companies to bid for the contract to construct the LM. On November 7, 1962, NASA announced that it had awarded the contract to
Grumman The Grumman Aircraft Engineering Corporation, later Grumman Aerospace Corporation, was a 20th century American producer of military and civilian aircraft. Founded on December 6, 1929, by Leroy Grumman and his business partners, it merged in 1994 ...
in
Bethpage, New York Bethpage (formerly known as Central Park) is a hamlet and census-designated place (CDP) located within the Town of Oyster Bay in Nassau County, on Long Island, in New York, United States. The population was 16,429 at the 2010 United States Cens ...
.


Delays

As with Apollo 4, there were significant delays for Apollo 5. The primary cause of the Apollo 5 delays was the LM, which was behind schedule. Apollo Program Manager
Major General Major general (abbreviated MG, maj. gen. and similar) is a military rank used in many countries. It is derived from the older rank of sergeant major general. The disappearance of the "sergeant" in the title explains the apparent confusion of ...
Samuel C. Phillips had originally hoped that the uncrewed test flight of LM-1, the first lunar module, would launch in April 1967. Anticipating six months for checkout and testing of the vehicle, NASA asked Grumman to have LM-1 delivered to
Kennedy Space Center The John F. Kennedy Space Center (KSC, originally known as the NASA Launch Operations Center), located on Merritt Island, Florida, is one of the National Aeronautics and Space Administration's (NASA) ten field centers. Since December 196 ...
in Florida by September 1966, but due to difficulties in manufacturing LM-1, delivery was repeatedly delayed. The delivery date was still uncertain when AS-206, the
Saturn IB The Saturn IB (also known as the uprated Saturn I) was an American launch vehicle commissioned by the National Aeronautics and Space Administration (NASA) for the Apollo program. It uprated the Saturn I by replacing the S-IV second stage (, 43 ...
launch vehicle planned to boost LM-1 to orbit, was erected at Launch Complex 37 in January 1967. After the fire that month that killed the
Apollo 1 Apollo 1, initially designated AS-204, was intended to be the first crewed mission of the Apollo program, the American undertaking to land the first man on the Moon. It was planned to launch on February 21, 1967, as the first low Earth orbit ...
crew, the launch vehicle planned for Apollo 1, AS-204, was moved from
Launch Complex 34 Launch Complex 34 (LC-34) is a deactivated launch site on Cape Canaveral Space Force Station, Florida. LC-34 and its companion LC-37 to the north were used by NASA from 1961 through 1968 to launch Saturn I and IB rockets as part of the Apol ...
to Launch Complex 37 and replaced AS-206. This was done because AS-204 was the last Saturn IB with full research and development instrumentation, and, with crewed flight on hold, NASA wanted to use that booster for the first flight of the LM. With no LM yet available, Grumman built a plywood mockup of one at Launch Complex 37 to aid in facilities verification. On May 12, 1967, Apollo Program Spacecraft Manager
George M. Low George Michael Low (born Georg Michael Löw, June 10, 1926 – July 17, 1984) was an administrator at NASA and the 14th president of Rensselaer Polytechnic Institute. Low was one of the senior NASA officials who made numerous decisions as ...
informed NASA headquarters that Grumman was committed to a June 28 delivery of LM-1, though Low noted that the goal would be hard to meet. On June 23, LM-1 arrived at Cape Kennedy on board
Aero Spacelines Aero Spacelines, Inc. was an American aircraft manufacturer from 1960 to 1968 that converted Boeing 377 Stratocruisers into the famous Guppy line of airplanes, re-engineered to transport oversized cargo such as space exploration vehicles. ...
'
Super Guppy Super may refer to: Computing * SUPER (computer program), or Simplified Universal Player Encoder & Renderer, a video converter / player * Super (computer science), a keyword in object-oriented programming languages * Super key (keyboard butt ...
; the stages were mated to each other four days later. A 400-person team under John J. Williams, a veteran of launch operations for both Mercury and Gemini, checked to see that LM-1 met specifications, after which they supervised Grumman technicians, who tested and modified the vehicle. Due to leaks in the LM's ascent stage, the two stages were demated in August, and after these were fixed and the stages remated, another leak developed and the stages were demated again in September. During this time, several pieces of equipment were removed for repair by Grumman; the stages were remated again in October. As of September 6, 1967, Apollo 5 was running about 39 days behind the plan established on July 18, but all known issues were being dealt with, with the exception of some leaks from the propulsion system. Most mission documents were ready by late 1967; Mission Director
William C. Schneider William Charles Schneider () served in the United States Naval Reserve 1942–1946 as an Aviation Machinist's Mate, 1st Class Petty Officer. He joined NASA in June 1963 and served as the Gemini mission director for seven of the ten piloted Gemini ...
issued mission rules on November 18, 1967. The following day, LM-1 was mated to its launch vehicle, and the space vehicle readiness test was completed in December. In early January 1968, the office of NASA Administrator James E. Webb announced that Apollo 5 would be launched no earlier than January 18, 1968. Minor faults such as clogged filters led to some additional delays. The countdown demonstration test concluded on January 19 and an abbreviated 22-hour countdown began on January 21.


Objectives

Apollo 5 was intended to verify the operation of the subsystems of the LM. During the flight, the ascent and descent engines would be fired. A " fire in the hole" test would be conducted to verify that the ascent stage could still fire while attached to the descent stage, a procedure that would be used on the lunar surface and in the event of an aborted lunar landing. It involved shutting down the descent stage, switching control and power to the ascent stage, and starting the ascent engine while the two stages were still mated. The term "fire in the hole" derived from a term used in mining when explosives are about to be used. Additional testing was to check that the LM engines could be restarted after initial use. In addition to testing LM systems, Apollo 5 was to test the Instrument Unit in its Saturn V configuration. It was expected that the ascent stage of LM-1 would remain in orbit for about two years before re-entering the atmosphere and disintegrating, and the descent stage for about three weeks.


Equipment

Apollo 5 was launched into orbit by the Saturn IB, designated SA-204R, which had been assigned to Apollo 1. Originally brought to Cape Kennedy in August 1966, it had survived the fire unscathed, having been inspected after the fire for corrosion or other damage. Ignition weight for the launch vehicle, including the spacecraft and propellant, was . The space vehicle for this mission was tall, but had a stubby appearance since it had neither a CSM nor a launch escape system. Instead, the LM was housed within the spacecraft-lunar module adapter (SLA) at the top of the vehicle stack. The SLA, numbered as SLA-7, was just below the nose cap in the stack, and had four panels that would open once the nose cap was jettisoned in orbit, allowing the LM room to separate and move away. The LM, designated as LM-1, was the first flight-ready Apollo lunar module. To save weight, and because they would not be necessary during the test mission, LM-1 had no landing legs.LM-5 (which would fly on
Apollo 11 Apollo 11 (July 16–24, 1969) was the American spaceflight that first landed humans on the Moon. Commander Neil Armstrong and lunar module pilot Buzz Aldrin landed the Apollo Lunar Module ''Eagle'' on July 20, 1969, at 20:17 UTC, ...
) broke during testing in December 1967, NASA officials decided to replace the windows of LM-1 with aluminum plates out of concern a window might fail in flight. Since there would be no astronauts aboard, LM-1 had a mission programmer installed, which could control the craft remotely. Not all LM-1 systems were fully activated nor was it given a full load of consumables: for example, its primary batteries were partially discharged to avoid over-voltage complications, and the oxygen tanks for the environmental control systems were only partially full.


Flight

On January 22, 1968, Apollo 5 lifted off from Launch Complex 37B at Cape Kennedy Air Force Station at 17:48:08 Eastern Standard Time (22:48:08 UTC). The Saturn IB worked perfectly, inserting the second stage and LM into an orbit. The nose cone was jettisoned, and after a coast of 43 minutes 52 seconds, the LM separated from its adapter, in a orbit. After two orbits, the first planned 39-second descent-engine burn was started, but this was aborted after only four seconds by the
Apollo Guidance Computer The Apollo Guidance Computer (AGC) was a digital computer produced for the Apollo program that was installed on board each Apollo command module (CM) and Apollo Lunar Module (LM). The AGC provided computation and electronic interfaces for guidanc ...
, which detected that the spacecraft was not going as fast as expected. This happened because one of the engine's valves was suspected of being leaky and was not armed until it was time to ignite the engine, in orbit, which meant that the propellant took longer to reach the engine, leading to the lag. Programmers could have adjusted the software to account for this, but were not told. In addition, the tanks were only half full, and this contributed to the slowness of the ship. Had this occurred on a crewed mission, the astronauts would have been able to analyze the situation and decide whether the engine should be restarted.
Gene Kranz Eugene Francis "Gene" Kranz (born August 17, 1933) is an American aerospace engineer who served as NASA's second Chief Flight Director, directing missions of the Mercury, Gemini and Apollo programs, including the first lunar landing mission, Ap ...
was the flight director for Apollo 5. Mission Control, under Kranz's command, decided on a plan to conduct the engine and "fire-in-the-hole" tests under manual control. There were communication problems with the spacecraft, and omitting these tests would have meant the mission was a failure. Despite this, Kranz's team accomplished every burn. The ascent stage spun out of control eight hours into the mission, after completion of the engine burns, due to a problem with the guidance system. The stages were left in a low enough orbit that atmospheric drag would soon cause their orbits to decay and re-enter the atmosphere. The ascent stage re-entered on January 24 and burned up; the descent stage re-entered on February 12, falling into the Pacific several hundred miles southwest of
Guam Guam (; ch, Guåhan ) is an organized, unincorporated territory of the United States in the Micronesia subregion of the western Pacific Ocean. It is the westernmost point and territory of the United States (reckoned from the geographic cent ...
. Simulations showed that the S-IVB stage of the launch vehicle (1968-007B) re-entered about 15.5 hours into the flight. Apollo Spacecraft Program Manager
George M. Low George Michael Low (born Georg Michael Löw, June 10, 1926 – July 17, 1984) was an administrator at NASA and the 14th president of Rensselaer Polytechnic Institute. Low was one of the senior NASA officials who made numerous decisions as ...
said that Apollo 5's success "was due to the fact that we had a good piece of hardware; it was due to the fact that we had outstanding flight control teams under Gene Kranz' able leadership." Despite the trouble during the descent-engine burn,
NASA The National Aeronautics and Space Administration (NASA ) is an independent agency of the US federal government responsible for the civil space program, aeronautics research, and space research. NASA was established in 1958, succeedin ...
deemed the mission a success in demonstrating the LM systems, and a second uncrewed flight test using LM-2 was cancelled. The first crewed LM flight took place on
Apollo 9 Apollo 9 (March 313, 1969) was the third human spaceflight in NASA's Apollo program. Flown in low Earth orbit, it was the second crewed Apollo mission that the United States launched via a Saturn V rocket, and was the first flight of the ful ...
in March 1969.


Notes


References


Sources

* * * * * * *


External links


U.S. Registry of Objects Launched into Outer Space
* {{DEFAULTSORT:Apollo 05 Apollo 05 1968 in the United States Spacecraft launched in 1968 January 1968 events Spacecraft launched by Saturn rockets