Ōito Line
   HOME

TheInfoList



OR:

The is a railway line in Japan which connects Matsumoto Station in Nagano Prefecture with
Itoigawa Station is a railway station in Itoigawa, Niigata, Japan, operated by West Japan Railway Company (JR West) and the third-sector railway operator Echigo Tokimeki Railway. It is also a freight terminal for the Japan Freight Railway Company. Lines Itoig ...
in
Niigata Prefecture is a prefecture in the Chūbu region of Honshu of Japan. Niigata Prefecture has a population of 2,227,496 (1 July 2019) and is the fifth-largest prefecture of Japan by geographic area at . Niigata Prefecture borders Toyama Prefecture and ...
. There are two operators on the line: East Japan Railway Company (JR East) operates the section north of Minami-Otari Station in Otari, Nagano Prefecture, and
West Japan Railway Company , also referred to as , is one of the Japan Railways Group (JR Group) companies and operates in western Honshu. It has its headquarters in Kita-ku, Osaka. It is listed in the Tokyo Stock Exchange, is a constituent of the TOPIX Large70 index, and ...
(JR West) operates the remaining section. Minami-Otari is the boundary for the two companies. The section of the line, operated by JR East, between Minami-Otari and Matsumoto is electrified and trains are fairly regular along this section. The JR West section from Minami-Otari to Itoigawa, however, is not electrified and is used very little, compared to the electrified JR East section. Trains run far less regularly along this part.


Route data

*Operators, services: ** East Japan Railway Company (Services and tracks) ***Matsumoto — Minami-Otari: 70.1 km **
West Japan Railway Company , also referred to as , is one of the Japan Railways Group (JR Group) companies and operates in western Honshu. It has its headquarters in Kita-ku, Osaka. It is listed in the Tokyo Stock Exchange, is a constituent of the TOPIX Large70 index, and ...
(Services and tracks) ***Minami-Otari — Itoigawa: 35.3 km *Stations: **JR East: 34 **JR West: 8 including Itoigawa, excluding Minami-Otari *Double-tracked section: None *Electrification: Matsumoto - Minami-Otari (1,500 V DC)
Minami-Otari - Itoigawa (None) * Railway signalling: **Matsumoto — Itoigawa: Automatic Train Stop, S-type


Services


JR East section

;Limited express, Rapid , the following services are operated. ;Local :Matsumoto – Shinano-Ōmachi: every 30-60 minutes :Shinano-Ōmachi – Minami-Otari: every 60-180 minutes


JR West section

;Local :Minami-Otari - Itoigawa: every 120-180 minutes No limited-stop services like rapids operate on the JR West section. All trains are local services, which stop at every station.


Rolling stock


JR East section

* E127-100 series EMU *
211 series The is a suburban electric multiple unit (EMU) train type introduced in 1985 by the Japanese National Railways (JNR). It is operated by East Japan Railway Company (JR East) and Central Japan Railway Company (JR Central). It was formerly operated ...
EMU * E353 series EMU - ''Azusa''


JR West section

* KiHa 120 series DMU


Stations


JR East section

All stations are within Nagano Prefecture. :A: Limited Express ''Azusa'' :R: Rapid :Trains stop at stations marked "O", skip at stations marked ", ". Closed Stations Yanabaskijōmae Station closed on 16 March 2019


JR West section


History

The section between Matsumoto and was built between 1915 and 1916 by the , which electrified the line in 1926. The company was nationalised in 1937 and was not the same entity as the present
Shinano Railway The is a Japanese third-sector railway operating company established in 1996 to operate passenger railway services on the section of the JR East Shinetsu Main Line within Nagano Prefecture when it is separated from the JR East network in Octob ...
. The rest of the line was built by the
Japanese Government Railways The Japanese Government Railways (JGR) was the national railway system directly operated by the Japanese Ministry of Railways ( ja, 鉄道省, Tetsudō-shō, ) until 1949. It was a predecessor of Japanese National Railways and the later Japan Ra ...
(JGR) and the
Japanese National Railways The abbreviated JNR or , was the business entity that operated Japan's national railway network from 1949 to 1987. Network Railways As of June 1, 1949, the date of establishment of JNR, it operated of narrow gauge () railways in all 46 pref ...
(JNR) between 1929 and 1957. The Shinano-Ōmachi to Minami Otari section was electrified between 1959 and 1967. CTC signalling was commissioned in 1983, and freight services ceased in 1987. Following privatization of JNR on 1 April 1987, the line was divided and assigned to JR East and JR West. Station numbering was introduced on the line by JR East from 12 December 2016, with stations numbered in sequence from 9 (Minami-Otari) to 42 (Matsumoto).


See also

* List of railway lines in Japan


References

{{DEFAULTSORT:Oito Line Lines of East Japan Railway Company Lines of West Japan Railway Company Railway lines in Nagano Prefecture Rail transport in Niigata Prefecture Railway lines opened in 1915 1067 mm gauge railways in Japan