Government procurement or public procurement is undertaken by the public authorities of the
European Union The European Union (EU) is a supranational political and economic union of member states that are located primarily in Europe. The union has a total area of and an estimated total population of about 447million. The EU has often been de ...
(EU) and its member states in order to award contracts for
public works Public works are a broad category of infrastructure projects, financed and constructed by the government, for recreational, employment, and health and safety uses in the greater community. They include public buildings ( municipal buildings, sc ...
and for the purchase of
goods In economics, goods are items that satisfy human wants and provide utility, for example, to a consumer making a purchase of a satisfying product. A common distinction is made between goods which are transferable, and services, which are not t ...
and
services Service may refer to: Activities * Administrative service, a required part of the workload of university faculty * Civil service, the body of employees of a government * Community service, volunteer service for the benefit of a community or a p ...
in accordance with principles derived from the
Treaties of the European Union The Treaties of the European Union are a set of international treaties between the European Union (EU) member states which sets out the EU's constitutional basis. They establish the various EU institutions together with their remit, procedures ...
. Such
procurement Procurement is the method of discovering and agreeing to terms and purchasing goods, services, or other works from an external source, often with the use of a tendering or competitive bidding process. When a government agency buys goods or serv ...
represents 14% of EU GDP ,European Commission
Communication from the Commission to the European Parliament, the Council, the European Economic and Social Committee and the Committee of the Regions: Making Public Procurement work in and for Europe
COM(2017) 572 final, published 3 October 2017, accessed 20 October 2021
and has been the subject of increasing European regulation since the 1970s because of its importance to the European single market. According to a 2011 study prepared for the
European Commission The European Commission (EC) is the executive of the European Union (EU). It operates as a cabinet government, with 27 members of the Commission (informally known as "Commissioners") headed by a President. It includes an administrative body ...
by PwC, London Economics and Ecorys, the UK, France, Spain, Germany, Poland and Italy were together responsible for about 75% of all public procurement in the EU and
European Economic Area The European Economic Area (EEA) was established via the ''Agreement on the European Economic Area'', an international agreement which enables the extension of the European Union's single market to member states of the European Free Trade As ...
, both in terms of the number of contracts awarded through EU-regulated procedures and in value. The UK awarded the most contracts in value terms and France had the highest number of contracts. Although the United Kingdom left the EU on 31 January 2020, the existing regulations continued to apply until 31 December 2020 in accordance with the
Brexit withdrawal agreement The Brexit withdrawal agreement, officially titled Agreement on the withdrawal of the United Kingdom of Great Britain and Northern Ireland from the European Union and the European Atomic Energy Community, is a treaty between the European Uni ...
.


Legislative history


Primary legislation

The basis of European procurement regulation lies in the provisions of the European Union treaties which prohibit barriers to intra-Union trade, provide the freedom to provide services and the right to establishment (three of the "
Four Freedoms The Four Freedoms were goals articulated by U.S. President Franklin D. Roosevelt on Monday, January 6, 1941. In an address known as the Four Freedoms speech (technically the 1941 State of the Union address), he proposed four fundamental freed ...
"), prohibit discrimination on the basis of national origin and regulate public undertakings and public monopolies.Bovis (2007), 10. But these rules, being prohibitive in character, proved insufficient to eliminate the protection afforded by the Member States to domestic enterprises by preferential procurement practices. For this, positive regulation through
secondary legislation Primary legislation and secondary legislation (the latter also called delegated legislation or subordinate legislation) are two forms of law, created respectively by the legislative and executive branches of governments in representative democra ...
which harmonized the procurement laws of Member States appeared to be needed.


First generation of secondary legislation: Supply and Works Directives

The European Communities (EC)
Council of Ministers A council is a group of people who come together to consult, deliberate, or make decisions. A council may function as a legislature, especially at a town, city or county/ shire level, but most legislative bodies at the state/provincial or nati ...
adopted ''General Programmes'' in 1962 which envisaged the abolition of national quotas and restrictions in public procurement. Directive 66/683/EEC prohibited rules requiring the use of national products or prohibiting the use of foreign products in public procurement, and Directive 70/32 applied the same rule to public supply contracts. The procedures for awarding public supply contracts were co-ordinated with Directive 77/62/EEC,Publications Office of the European Union
Council Directive 77/62/EEC of 21 December 1976 coordinating procedures for the award of public supply contracts
accessed 14 September 2022
which introduced three fundamental principles: contracts had to be advertised community-wide, discriminatory
technical specification A specification often refers to a set of documented requirements to be satisfied by a material, design, product, or service. A specification is often a type of technical standard. There are different types of technical or engineering specificati ...
s were prohibited, and tendering and award procedures had to be based on objective criteria. However, it did not apply to
public utilities A public utility company (usually just utility) is an organization that maintains the infrastructure for a public service (often also providing a service using that infrastructure). Public utilities are subject to forms of public control and ...
, or to products originating outside the EC until its amendment by Directive 80/767 following Community approval of the 1979 General Agreement on Tariffs and Trade (GATT) Agreement on Government Procurement. Similar principles of transparency and non-discrimination were applied to the awarding of
public works Public works are a broad category of infrastructure projects, financed and constructed by the government, for recreational, employment, and health and safety uses in the greater community. They include public buildings ( municipal buildings, sc ...
contracts with Directive 71/305, taking the form of the "prohibition of technical specifications that have a discriminatory effect", a requirement for "adequate advertising" and "the fixing of objective criteria for participation"; these, however, did not replace national tendering procedures and practices with a set of common rules.


Second generation of secondary legislation: Utilities Directive

The
European Commission The European Commission (EC) is the executive of the European Union (EU). It operates as a cabinet government, with 27 members of the Commission (informally known as "Commissioners") headed by a President. It includes an administrative body ...
's 1985 ''
White Paper A white paper is a report or guide that informs readers concisely about a complex issue and presents the issuing body's philosophy on the matter. It is meant to help readers understand an issue, solve a problem, or make a decision. A white pape ...
for the Completion of the Internal Market'' identified Member States' public procurement policy and practice as a significant
non-tariff barrier Non-tariff barriers to trade (NTBs; also called non-tariff measures, NTMs) are trade barriers that restrict imports or exports of goods or services through mechanisms other than the simple imposition of tariffs. The Southern African Development C ...
to the free circulation of goods and provision of services in Europe because it tended to favour national providers, thereby sheltering markets from competition and distorting trade patterns. The paper and the
Single European Act The Single European Act (SEA) was the first major revision of the 1957 Treaty of Rome. The Act set the European Community an objective of establishing a single market by 31 December 1992, and a forerunner of the European Union's Common Forei ...
of 1986 which it led to are the conceptual foundation of current EU procurement law. On this basis, Directive 88/295 amended all previous public supplies directives. Open tendering procedures were now the norm and negotiated procedures were allowed only in exceptional circumstances. Purchasing authorities now had to publish advance notices of their annual procurement programmes as well as details of each award decision. National technical standards now had to be mutually recognised, and the exempted sectors were more clearly defined. Directive 89/440 likewise amended the previous public works directives. Their scope of application was widened, now also covering concession contracts and certain state-subsidized works, and consortial participation in contracts was allowed. The most important change was the adoption of the first Utilities Directive, Directive 90/531.
Public utilities A public utility company (usually just utility) is an organization that maintains the infrastructure for a public service (often also providing a service using that infrastructure). Public utilities are subject to forms of public control and ...
– the energy, telecommunications, transport and water sectors – had so far escaped European procurement law harmonisation because of the strongly divergent national legal regimes governing them, and possibly also because their large purchasing volume constituted an instrument of national industrial policy that governments were reluctant to give up. The removal of market access barriers in this sector was largely enabled by the concurrent liberalisation of the European telecommunications industry and by the envisaged global liberalisation of public procurement in the
Uruguay Round The Uruguay Round was the 8th round of multilateral trade negotiations (MTN) conducted within the framework of the General Agreement on Tariffs and Trade (GATT), spanning from 1986 to 1993 and embracing 123 countries as "contracting parties". The R ...
of GATT negotiations. The first Utilities Directive generally followed the approach of the Supply and Works directives, but provided for the exemption of several sectors such as broadcasting, or for utilities operating under competitive conditions. Moreover, with the first Remedies Directives, 89/665/EEC (relating to public works and supply contracts) and 92/13/EEC (relating to public utilities), Member States were required to ensure rapid and effective review of decisions made by contracting authorities.European Commission
Remedies Directives
accessed 6 February 2021
The directives also introduced the "attestation procedure" as a way for contracting authorities to certify the compliance of their purchase procedures and practices with procurement law.


Third generation of secondary legislation: Services Directive and consolidation

Following the official completion of the single market project in 1992, the attention of the European institutions shifted towards the service sector, in view of its ever-increasing macroeconomic importance. The Services Directive, 92/50, attempted to contribute to the liberalisation of public sector services by introducing a régime similar to that governing the procurement of goods, works and by public utilities. It also introduced a new award procedure, the Design Contest. But its scope excluded several specific services, as well as service concessions, which may have been due to certain national constitutional restrictions against the outsourcing of public services. It also distinguished between "priority" services, to which the whole range of procurement disciplines applied, and "non-priority" services, whose procurement was subject only to basic non-discrimination and publicity rules. In 1993, the older Supplies, Works and Utilities directives were re-adopted in a consolidated form as Directives 93/36, 93/37 and 93/38. This was to make the legal framework more homogeneous, but the changes to the Works Directive included significant clarifications and a special, mitigated régime for the award of concession contracts.


Fourth generation of secondary legislation: further consolidation

In 2004, procurement legislation was again consolidated following the principles of simplification and modernisation. The new legal framework is based on a clear-cut dichotomy between utilities and the rest of the public sector. While the procurement of the former remains governed by a new Utilities Directive, Directive 2004/17 "coordinating the procurement procedures of entities operating in the water, energy, transport and postal services sectors", the other three directives were amalgamated into a single "Public Sector Directive", Directive 2004/18 "on the coordination of procedures for the award of public works contracts, public supply contracts and public service contracts", which now governs procurement by public authorities other than utilities. The 2004 directives, apart from simplifying and clarifying the existing law, introduce a new procurement procedure, the
competitive dialogue Competition is a rivalry where two or more parties strive for a common goal which cannot be shared: where one's gain is the other's loss (an example of which is a zero-sum game). Competition can arise between entities such as organisms, indivi ...
, and allow the procurement of
framework agreements In the context of negotiations, a framework agreement is an agreement between two parties that recognizes that the parties have not come to a final agreement on all matters relevant to the relationship between them, but have come to agreement on e ...
. They were required to be transposed into national law by 31 January 2006. In 2007, the Remedies Directives were also updated by Directive 2007/66/EC, which amended Directives 89/665/EEC and 92/13/EEC with regard to improving the effectiveness of review procedures concerning the award of public contracts.


Fifth generation: 2014 Directives

New Directives on Public Procurement, Utilities Procurement and Concessions were adopted by the European Council on 24 February 2014. The Member States were allowed until 18 April 2016 to transpose the new rules into their national laws (except with regard to e-procurement, where the deadline was September 2018). In the UK, the Public Contracts Regulations 2015 implementing the 2014 Directive on Procurement came into force on 26 February 2015. The
Irish Irish may refer to: Common meanings * Someone or something of, from, or related to: ** Ireland, an island situated off the north-western coast of continental Europe ***Éire, Irish language name for the isle ** Northern Ireland, a constituent unit ...
Office of Government Procurement undertook a public consultation process between 31 October and 12 December 2014 with a view to transposing the new Directives into
Irish law Law of Ireland or Irish law may refer to: * Early Irish law (Brehon law) of Medieval Ireland * Alternative law in Ireland prior to 1921 * Law of the Republic of Ireland * Law of Northern Ireland The law of Northern Ireland is the legal syste ...
by 17 April 2016. The 2014 Public Procurement Directive introduced an obligation to take into account accessibility criteria for
disabled persons Disability is the experience of any condition that makes it more difficult for a person to do certain activities or have equitable access within a given society. Disabilities may be cognitive, developmental, intellectual, mental, physical, se ...
in the specification for any works, goods or services intended for use by the general public or by staff of the contracting authority, unless there was justification for not doing so. On 26 May 2016 the European Commission issued letters of formal notice to 21 member states who had failed to notify the Commission of their transposition of one or more of the three new directives into their national law by the due date. The commission's letter of formal notice was sent to Austria, Belgium, Bulgaria, Croatia, the Czech Republic, Cyprus, Estonia, Ireland, Greece, Latvia, Lithuania, Luxembourg, Malta, the Netherlands, Poland, Portugal, Romania, Slovenia, Finland, Spain and Sweden.


Aims and principles

The
European Commission The European Commission (EC) is the executive of the European Union (EU). It operates as a cabinet government, with 27 members of the Commission (informally known as "Commissioners") headed by a President. It includes an administrative body ...
estimates that the elimination of
trade barrier Trade barriers are government-induced restrictions on international trade. According to the theory of comparative advantage, trade barriers are detrimental to the world economy and decrease overall economic efficiency. Most trade barriers work o ...
s resulting from discriminatory and preferential procurement practices may bring about savings to the European economy of about 0.5% of EU GDP, which would be about US$92 billion in 2008. These savings are thought to be the result of three effects: The ''trade effect'' represents the actual and potential savings as a result of lower purchase prices than can be had from a broader pool of suppliers. The ''competition effect'' represents the improvement, as a result of increased competition, in the efficiency and performance of previously sheltered national firms, and manifests as price convergence. Finally, the ''restructuring effect'' represents the long-term structural adjustment of the industries servicing the public sector in reaction to the trade and competition effects. To effect this, the Public Procurement Directives seek to base procurement on principles "derived from" the European Union Treaty. Within the EU Treaty itself, freedom of movement of goods, freedom of establishment and freedom to provide services are specified; these freedoms, along with free movement of capital, are the "four freedoms" which underpin the European Single Market. In the commission's ''Interpretative Communication on the Community law applicable to contract awards not or not fully subject to the provisions of the Public Procurement Directives'', published in August 2006, it was explained that certain other principles, equal treatment, non-discrimination, mutual recognition, proportionality and transparency, were derived from the Treaty principles and apply to all government procurement within the EU, and should be applied to all purchasing, taking account of proportionality, regardless of the level of expenditure.


Strategic use of procurement

The European Commission states that public procurement should be used in a "strategic manner", in order to secure value for money and also to contribute to innovation and sustainable, inclusive and competitive economic development; for example, the 2016 Pact of Amsterdam identified public procurement as one of the means of dealing with the urban challenges facing many European cities.


Transparency

Transparency in European government procurement is achieved through the publication, in the
Official Journal A government gazette (also known as an official gazette, official journal, official newspaper, official monitor or official bulletin) is a periodical publication that has been authorised to publish public or legal notices. It is usually establis ...
, of three types of notices: * ''Prior Information Notices'' (PIN) giving advance information of a proposed procurement, and details of the procurement procedure to be applied The abbreviation "PIN" also refers to a ''periodic indicative notice'' issued for transparency purposes under Article 67 of the Utilities Directive of 2014 whereby "contracting entities may make known their intentions of planned procurement". * ''Contract notices'' are the formal invitations to suppliers to tender offers which initiate the process of awarding a contract. * ''Contract Award Notices'' (CAN) notify the public about the award of a contract to a successful tenderer, including the price and the reason for the selection. The European Court of Justice (ECJ) stated in 2004 that the principle of transparency "flows from" the principle of equal treatment which is stated in the irectives and both require that "the subject matter of each contract and the criteria governing its award ... be clearly defined". Transparency should enhance price competition among suppliers, resulting in lower purchase prices, because publication makes more suppliers aware of business opportunities, and they also know that their competitors will also have seen the opportunity. CANs also send important price signals to the market. However, the increased competition may drive down prices down to a level where poor quality or
predatory pricing Predatory pricing is a pricing strategy, using the method of undercutting on a larger scale, where a dominant firm in an industry will deliberately reduce the prices of a product or service to loss-making levels in the short-term. The aim is th ...
become concerns. It also wastes effort on the part of the many unsuccessful tenderers and of the authority who has to evaluate many tenders. A document issued for transparency purposes and in order to prevent or mitigate a challenge to a contract awarded without a suitable competitive process is called a Voluntary Ex-Ante Transparency Notice or VEAT Notice.


''De minimis'' thresholds

In part because of the above-mentioned problem, the Directives apply only to contracts whose value (excluding VAT) exceeds certain thresholds. Other contracts, whose value is considered '' de minimis'', are not required to be awarded under the Directives' procedures, although the basic rules of the European Union Treaties, such as non-discrimination, still apply. The European Commission published updated thresholds on 18 December 2017 and these apply to any procurement advertised or otherwise initiated on or after 1 January 2018: * €144,000 (previously €135,000) for public sector supply and service contracts as well as design contests of central government authorities: (Directive 2004/18/EC) article 7(a), article 67(1)(a)); the equivalent in the UK is £118,133 * €221,000 (previously €209,000) for wider public sector supply and service contracts as well as design contests of other authorities (Directive 2004/18/EC article 7(b), article 67(1)(b)); the equivalent in the UK is £181,302 * €221,000 (previously €209,000) for service contracts that are more than 50% state-subsidised: (Directive 2004/18/EC article 8(b)); the equivalent in the UK is £181,302 * €443,000 (previously €387,000) for utility supply and service contracts, including service design contests (Directive 2004/17/EC article 16(a), article 61); the equivalent in the UK is £363,424 * €80,000 (no change) for small lots within a project above the services threshold, allowing no more than 20% of the value of the project to be excluded from procurement in accordance with the directive; the equivalent in the UK is £65,630 * €750,000 (no change) for light touch regime contracts (also known as Annex XIV contracts); the equivalent in the UK is £615,278 * €5,548,000 (previously €5,225,000) for public sector and utility works contracts, as well as for contracts that are more than 50% state-subsidised and involve
civil engineering Civil engineering is a professional engineering discipline that deals with the design, construction, and maintenance of the physical and naturally built environment, including public works such as roads, bridges, canals, dams, airports, sewa ...
activities or hospital, sports, recreation or education facility construction (Directive 2004/17/EC article 16(b), Directive 2004/18/EC article 7(c), article 8(a)); the equivalent in the UK is £4,551,413 * €5,548,000 (previously €5,225,000) for public works and services concession contracts; the equivalent in the UK is £4,551,413 The ''de minimis'' principle allows authorities to avoid an expensive and lengthy tendering and award procedure for low-value contracts, where the costs of the procedure could exceed the public welfare benefits of the increased transparency and competition associated with the procedure. A 1995 Commission study shows that this "sub-dimensional" public purchasing, which remains unaffected by the procedural disciplines of the Directives, appears to be at least three times the size of "dimensional" (i.e., above-threshold) purchasing. The ''de minimis'' principle also provides an incentive for authorities to divide contracts into separate lots for the purpose of avoiding bothersome procedures. Although the Directives prohibit doing this, such avoidance of procurement law is difficult to detect and enforce (as of 2007 no case relating to it had ever been before the ECJ, and it is thought to be mainly responsible for the observed low percentage of all public contracts that are published in the Official Journal.


Mandatory exclusion

Regulation 57 provides for companies who have committed certain offences to be excluded from the supplier appraisal process and their tenders rejected. Mandatory exclusion applies in relation to offences relating to corruption, bribery, money laundering,
taxation A tax is a compulsory financial charge or some other type of levy imposed on a taxpayer (an individual or legal entity) by a governmental organization in order to fund government spending and various public expenditures (regional, local, o ...
offences,
people trafficking Human trafficking is the trade of humans for the purpose of forced labour, sexual slavery, or commercial sexual exploitation for the trafficker or others. This may encompass providing a spouse in the context of forced marriage, or the extracti ...
and drug trafficking.


Discretionary exclusion

The same regulation also allows contracting authorities to exclude businesses from the supplier appraisal process and reject their tenders where they have committed offences or undertaken activities relating to
misrepresentation In common law jurisdictions, a misrepresentation is a false or misleading '' R v Kylsant'' 931/ref> statement of fact made during negotiations by one party to another, the statement then inducing that other party to enter into a contract. The ...
,
undue influence Undue influence (UI) is a psychological process by which a person's free will and judgement is supplanted by that of another. It is a legal term and the strict definition varies by jurisdiction. Generally speaking, it is a means by which a per ...
on procurement procedures, grave professional misconduct, agreements to distort competition or demonstrated significant or persistent deficiencies in the performance of a public contract which led to early termination of that contract.


Self-cleaning

Regulation 57(13)-(17) recognises that businesses may have addressed the reasons why they may have previously committed excludable offences and demonstrated that they should now be considered a reliable and suitable business for performance of a public contract. The provision of evidence to this effect is known as 'self-cleaning'. To take advantage of this provision, businesses must demonstrate that they have paid fines or provided compensation for damages, "clarified the facts and circumstances in a comprehensive manner by actively collaborating with the investigating authorities" and taken appropriate steps relating to their organisation, policies, procedures and personnel to address the cause of previous failings.


Reliance on the capacities of other entities

An entity wishing to tender or to demonstrate that it meets the selection criteria (economic and financial standing, and technical and professional ability) for being invited to tender may rely on the capacities of one or more other entities,Directive 2014/24/EU of the European Parliament and the Council of 26 February 2014 on public procurement and repealing Directive 2004/18/EC
/ref> for example if it intends to sub-contract part of the delivery in an area where it lacks sufficient skills and resources. The 2014 Directive and its predecessor note the following points in relation to reliance on other entities: :- reliance is to be assessed in relation to the requirements of a ''specific'' contract :- an intention to rely on another entity does not depend any specific form of legal connection between the tenderer and the entities on which it wishes to rely :- an entity may only rely on educational and professional qualifications or experience if they relate to the work that the supporting entity will undertake :- the entity must prove to the contracting authority concerned that it has access to the resources necessary, e.g. by providing evidence of a commitment made by those entities :- if the supporting entity does not meet the selection criteria or needs to be excluded under a mandatory exclusion, the supporting entity can be replaced by another suitable entity :- where reliance on another entity relates to the tenderer's economic or financial standing, the contracting authority may require that supporting entity to accept joint liability for the execution of the contract. A provision was added into the 2014 Directive stating that for works contracts, service contracts and siting or installation operations in the context of a "supply-and-fit" contract, a contracting authority may require that certain critical tasks be performed directly by the tenderer itself or, where the tender is submitted by a group of economic operators ... by a participant in that group".


Termination of contract

Article 73 requires public authorities to include terms in public contracts which allow the contract to be terminated if its award or subsequent variation should not have taken place for reasons directly connected with the procurement regulations. These terms should deal with the mechanism for, and consequences of, termination. In the absence of such a term, a power for the contracting authority to terminate the contract on reasonable notice will be implied.


Electronic processes in public procurement

Regulation 22 of the 2015 Regulations came into effect on 18 October 2018, requiring that all communication and information with bidders, including tender submissions, should be performed using electronic means. Directive 2014/55/EU of the European Parliament and European Council on
electronic invoicing Electronic invoicing (also called e-invoicing or einvoicing) is a form of electronic billing. E-invoicing methods are used by trading partners, such as customers and their suppliers, to present and monitor transactional documents between one anoth ...
in public procurement (16 April 2014) applies to electronic invoices issued as a result of the performance of contracts to which Directive 2009/81/EC, Directive 2014/23/EU, Directive 2014/24/EU or Directive 2014/25/EU applies. This directive aims to secure the development and implementation of a European standard on electronic invoicing.


Procedures

There are several different procedures available for public authorities. These include the Open, Restricted, Negotiated and Competitive Dialogue procedures. Each of these procedures sets its own limitations on the procuring authority, which must be considered when choosing the appropriate procedure. Contracting authorities have "a degree of choice" as to which procedure they follow for each procurement exercise, but "once they have issued an invitation to tender under one particular procedure, they are required to observe the rules applicable to it until the contract has been finally awarded". The procedure is intended to be fully transparent with the intention of creating a free and competitive Europe-wide market. The rules state that for projects above a certain financial threshold (about €100K) a contract notice must be published in Supplement S of the Official Journal of the European Union OJEU previously known as JEC S-Series Nowadays the information is available immediately on the web from ''
Tenders Electronic Daily Government procurement or public procurement is undertaken by the public authorities of the European Union (EU) and its member states in order to award contracts for public works and for the purchase of goods and services in accordance with princ ...
'' ('TED'). Regulated minimum timescales apply, which vary according to the procedure chosen; if "a state of urgency duly substantiated by the contracting authority" makes it impracticable to comply with the relevant time limit, then an "accelerated procedure" may be followed, typically allowing a time limit of not less than 15 days "where a state of urgency duly substantiated by the contracting authority renders he ordinary timescaleimpracticable. The EU refers to third party communication systems with functionality which can submit notifications to OJEU as "TED eSenders". In 2007, the European Commission issued an instruction intended to ensure that links to intermediaries' websites within published contract notices led ''directly'' to the relevant tender documents and not to a promotional website or one which requires registration. The buyer can advertise the contract more widely, but cannot do so before it has dispatched a notice for publication in the OJEU, and is forbidden from including information not also included in the OJEU publication. After the prescribed date, the bids are opened and assessed, and either the "lowest cost" or "most economically advantageous tender" is chosen. The contract award must also be reported in the OJEU and be published electronically on Tenders Electronic Daily ('TED'). The system is under constant revision to avoid misuse. Rejected bidders are granted up to ten days to challenge a decision, and the
European Commission The European Commission (EC) is the executive of the European Union (EU). It operates as a cabinet government, with 27 members of the Commission (informally known as "Commissioners") headed by a President. It includes an administrative body ...
routinely acts to police infringements.


Professionalisation

The European Commission issued a recommendation in October 2017 directed towards the "long-term professionalisation" of Member States' public procurement, so that they could "attract,
develop Develop or DEVELOP may refer to: * ''Develop'' (magazine), a trade publication for the video game industry * ''Develop'' (Apple magazine), a technical magazine formerly published by Apple Computer * Develop (chess), moving a piece from its origina ...
and
retain RETAIN is a mainframe based database system, accessed via IBM 3270 terminals (or more likely, emulators), used internally within IBM providing service support to IBM field personnel and customers. The acronym RETAIN stands for Remote Technical A ...
" staff in public purchasing roles, focus on performance and "make the most of the available tools and techniques". The Commission anticipated that Member States would implement their own professionalisation strategies but chose not to prescribe any specific model because the Member States are "at different stages of their journey". A "Toolbox of Good Practices" was published at the same time.


Special forms of procurement


Framework agreements

Public contracting authorities may enter into framework agreements with one or more businesses, which prescribe the terms and conditions which would apply to any subsequent contract and make provision for selection and appointment of a contractor by reference directly to the agreed terms and conditions or by holding a competition inviting only the partners to the framework agreement to submit specific commercial proposals. These are not in themselves procurement contracts, but they set out the terms of such contract with suppliers in advance over a set time. The 2004 Public Sector Directive codified rules for the procurement of goods and services through framework agreements, and the 2014 Directive amended these rules. Under the 2004 Directive, either one economic operator or more than three were to be party to a framework agreement, but the 2014 Directive also allowed a framework agreement to operate with just two economic operators. The term of a framework agreement may not usually exceed 4 years, "save in exceptional cases duly justified, in particular by the subject-matter of the framework agreement".


Dynamic purchasing systems

Provision is made in article 34 of the 2014 Directive for contracting authorities to use a dynamic purchasing system (DPS) for the purchase of commonly used items which are "generally available on the market" and which can meet their needs. As defined within this article, a single dynamic system used by a contracting authority could operate across a range of goods, works and services, divided into appropriate and objectively defined categories. A system must be operated as a completely electronic procedure. DPS systems differ from framework agreements in that suitable new suppliers can join a DPS at any time, A survey of public sector organisations reported by the UK's Local Government Association in May 2017 identified the benefits attributable to use of a DPS as flexibility, cost savings, the ability to stimulate markets and scope to improve access to contracts for "harder-to-reach suppliers".


Competitive procedure with negotiation

A competitive procedure allowing for negotiation with companies before finalisation of their tenders was introduced through Article 29 of the 2014 Directive (Regulation 29 in the UK Regulations). Contracting authorities using this procedure are required to provide to the market a description of their needs, the characteristics of the goods, works or services to be procured, and the award criteria which will ultimately be used to determine which business is to be awarded the contract to supply. Companies are invited through a contract notice or prior indicative notice to express interest in being invited to tender, and selected companies are then invited to submit an initial tender. Negotiations may take place between the contracting authority and each business in order to "improve the content" of each tender, before invitations are issued to submit a final tender. Final tenders are then evaluated against the previously published award criteria and a contract awarded. The competitive procedure with negotiation may only be used in cases where the contracting authority's needs cannot be met through use of 'readily available solutions' without their adaptation, where there is a design or innovation element to the goods, works or services to be procured, where the nature, complexity or legal and financial aspects of contractual risk demand a negotiated solution. In addition, where a procurement for goods, works or services falling outside the above criteria has been undertaken and only irregular or unacceptable tenders have been received, the contracting authority may then adopt the competitive procedure with negotiation as the next stage of the procurement process. For example, on 3 June 2016, Bridgend County Borough Council issued an invitation to express interest in participating in a competitive procurement with negotiation for waste collection services.


Negotiated procedure without publication

The "negotiated procedure without publication" allows contracts to be awarded without publication of an OJEU contract notice "in the most urgent cases", but the circumstances allowing the use of this process are restricted and should be "interpreted restrictively".European Commission
Communication from the Commission to the European Parliament and the Council on Public Procurement rules in connection with the current asylum crisis
COM(2015) 454 final, published 9 September 2015, accessed 30 December 2020
In Case C-275/08 relating to use of the 1993 supplies directive,
Germany Germany,, officially the Federal Republic of Germany, is a country in Central Europe. It is the second most populous country in Europe after Russia, and the most populous member state of the European Union. Germany is situated betwe ...
was found to have misused the provision for awarding a contract without prior publication of a contract notice. In 2015 the European Commission issued guidance advising on how public procurement rules could be used in connection with the then-current " asylum crisis", recognising that "in many Member States, the number of persons seeking asylum has increased significantly nd unforseeably but whether this allowed Member States to conclude that "compliance with general deadlines" was impossible needed to be assessed on a case-by-case basis.


Public-private partnerships

Public-private partnerships are not subject to special rules in EU procurement law, but must follow the rules and principles resulting from the European Treaties, including those embodied in secondary legislation. In 2000, the European Commission published an "interpretative communication on concessions under Community law", and in 2004 it published a "
Green Paper In the United Kingdom, the Commonwealth countries, Hong Kong, the United States and the European Union, a green paper is a tentative government report and consultation document of policy proposals for debate and discussion. A green paper represen ...
on public-private partnerships and Community law on public contracts and concessions", which takes stock of existing practices from the perspective of European law and is intended to launch a debate on whether a specific legal framework should be drawn up at the European level. The competitive dialogue procedure was created with the aim of making the award of public-private partnerships easier, since before its creation, a Contracting Authority faced the choice of the restricted procedure, which is often too inflexible for such contracts, or the negotiated procedure, which is intended to be an exceptional procedure with specific legal justifications. Its use so far in the EU, has, however, been uneven. Up to June 2009, more than 80% of the award procedures using competitive dialogue have been launched in two EU Member States i.e. France and the United Kingdom.


Design contests

Articles 78 to 82 of the 2014 Directive (Regulations 78 to 82 in the UK Regulations) provide for the conduct of a design contest, which may be either a stage in a procurement process leading to the award of a services contract, or a competition for which a prize is to be awarded or payment to be made. The Directive suggests that design contests are held "mainly in the fields of town and country planning, architecture and engineering or data processing". A Design Contest Notice must be issued in the OJEU. Where a jury is used to assess the plans and projects submitted by candidate businesses, it must consider the plans anonymously and retain minutes of any clarification discussions which take place with candidates.


Example

The Danish
Herlev Hospital Herlev Hospital (former da, Amtssygehuset i Herlev) is a hospital in Herlev, Denmark, close to Copenhagen. The building is tall and has 25 floors. It is famous for being Denmark's tallest building. Its modern, functional architecture in bright ...
issued a Design Contest Notice on 13 April 2016 for the design of the Steno Diabetes Center Copenhagen, intending to award a service contract to the winner or winners of the contest.


Innovation partnerships

The 2014 Directive provides for a new type of contract, the Innovation Partnership, whereby businesses are invited to submit "research and innovation projects aimed at meeting the needs identified by the contracting authority that cannot be met by existing solutions". An Innovation Partnership is a contractual relationship formed between a public body and one or more businesses which enables the public body and the business(es) to work together through a partnership agreement in order to develop new products, works or services, where these are not already available on the market. Innovation Partnerships were first endorsed among a series of public procurement reforms introduced in the 2014 Directive, and implemented in the UK's Public Contracts Regulations 2015. The EU is expected to publish its guidance in 2016 as to how it sees Innovation Partnerships working and other EU states are expected to implement the new regulations by April 2016.Rowan, A.
The Innovation Partnership
accessed 4 January 2016
Innovation Partnerships are likely to be long-term in nature and may involve contracts across three phases covering research and
proof of concept Proof of concept (POC or PoC), also known as proof of principle, is a realization of a certain method or idea in order to demonstrate its feasibility, or a demonstration in principle with the aim of verifying that some concept or theory has prac ...
, an intermediate development phase and a purchase phase. The
European Parliament The European Parliament (EP) is one of the legislative bodies of the European Union and one of its seven institutions. Together with the Council of the European Union (known as the Council and informally as the Council of Ministers), it adopts ...
welcomed the new option as an opportunity 'to strengthen innovative solutions in public procurement' by 'allow ngpublic authorities to call for tenders to solve a specific problem without pre-empting the solution, thus leaving room for the contracting authority and the tenderer to come up with
innovative Innovation is the practical implementation of ideas that result in the introduction of new goods or services or improvement in offering goods or services. ISO TC 279 in the standard ISO 56000:2020 defines innovation as "a new or changed entit ...
solutions together'. The European Commission issued guidance in May 2018 noting that the Innovation Partnership is just one of a number of routes a public authority may consider in order to procure an innovative product or service.European Commission
Guidance on Innovation Procurement
C(2018)3051 Final, published 15 May 2018, accessed 8 July 2018


Objectives

The promotion of innovation forms part of the European Union's
Europe 2020 Europe 2020 is a 10-year strategy proposed by the European Commission on 3 March 2010 for advancement of the economy of the European Union. It aims at a " smart, sustainable, inclusive growth" with greater coordination of national and European po ...
ten-year growth strategy. The EU seeks "to create an innovation-friendly environment that makes it easier for great ideas to be turned into products and services that will bring our economy growth and jobs" and the objectives of Innovation Partnerships can be seen as: * to open up this process within the context of public procurement * to help resolve societal challenges * to overcome the problem which arose under previous public procurement directives whereby public bodies could partner with private businesses to develop innovative solutions but once these were developed they were required to reopen competition before awarding a contract, therefore could not commit in advance to purchasing goods and services from any company they were supporting with product development.


Process

To commence the process of establishing an Innovation Partnership, a contracting authority must publish a Contract Notice in the
Official Journal of the European Union An official is someone who holds an office (function or mandate, regardless whether it carries an actual working space with it) in an organization or government and participates in the exercise of authority, (either their own or that of their su ...
(OJEU), which will 'identify the need for an innovative product, service or works that cannot be met by purchasing products, services or works already available on the market, and indicate which elements of this description define the minimum requirements to be met by all tenders'. There is a 30-day statutory minimum period from dispatch of the Contract Notice to the OJEU office to the closing date for requests from businesses wishing to participate in the process. From the companies who have asked to participate within the application period, the contracting authority will select suitable businesses based on objective criteria, which must include "capacity in the field of research and development and of developing and implementing innovative solutions". At least three businesses must be selected provided that there are three suitably qualified businesses interested. The selected businesses will then be invited to submit "research and innovation projects aimed at meeting the needs identified by the contracting authority that cannot be met by existing solutions". Once project proposals have been received, the contracting authority will assess them against pre-determined and published criteria and may select one or more projects to proceed. For any project that the contracting authority wishes to pursue, they will then negotiate a contract with the project proposers which is likely to cover: * the scope of the project * the value and terms of the contracting authority's financial investment * provisions for
intellectual property rights Intellectual property (IP) is a category of property that includes intangible creations of the human intellect. There are many types of intellectual property, and some countries recognize more than others. The best-known types are patents, cop ...
and
confidentiality Confidentiality involves a set of rules or a promise usually executed through confidentiality agreements that limits the access or places restrictions on certain types of information. Legal confidentiality By law, lawyers are often required ...
* provisions for terminating the innovation partnership with the business concerned. At intermediate stages, the number of businesses involved in the partnership may be reduced, for example, where
proof of concept Proof of concept (POC or PoC), also known as proof of principle, is a realization of a certain method or idea in order to demonstrate its feasibility, or a demonstration in principle with the aim of verifying that some concept or theory has prac ...
stages do not produce satisfactory or economic proposals which the contracting authority would contemplate purchasing in due course. Once a product or service has been developed which meets the contracting authority's needs, each of the partners is invited to submit a final and non-negotiable tender for the manufacture and supply of the products to the contracting authority or for performance of the service, and these tenders are evaluated to identify which offers the best combination of price and quality with a view to one of them being awarded a long-term supply contract.


Responses

Initial expectations are that the procedure will see limited use. Concerns have been raised by some commentators, particularly in relation to the potentially
anti-competitive Anti-competitive practices are business or government practices that prevent or reduce competition in a market. Antitrust laws differ among state and federal laws to ensure businesses do not engage in competitive practices that harm other, usuall ...
effect of the procedure.


Examples

Examples are limited to date. On 23 July 2015
The Christie NHS Foundation Trust The Christie NHS Foundation Trust in Withington, Manchester, manages the Christie Hospital, one of the largest cancer treatment centres of its type in Europe. The Christie became a NHS Foundation Trust in 2007 and is also an international leade ...
based in
Manchester Manchester () is a city in Greater Manchester, England. It had a population of 552,000 in 2021. It is bordered by the Cheshire Plain to the south, the Pennines to the north and east, and the neighbouring city of Salford to the west. The t ...
issued a Prior Indicative Notice regarding an intention to procure "a patient information/entertainment platform delivering patient tailored content over wireless infrastructure to mobile devices within the Trust" and stated that the Trust "intends to use the Innovation Partnership procedure for any subsequent procurement process" and wishes "to enter a long-term partnership with an organisation to develop a new patient focused extensible information/entertainment platform.".
Worcestershire County Council Worcestershire County Council is the county council for the non-metropolitan county of Worcestershire in England. The most recent elections to it were in 2021. Worcestershire County Council has its headquarters at County Hall in Worcester, w ...
issued a Prior Indicative Notice on 16 December 2015 seeking to appoint up to five businesses interested in "developing, test ngand bring ngto the market innovative technology in care solutions".


Joint procurement

The 2014 Directive makes provision for "occasional joint procurement", whereby two or more contracting authorities undertake an entire procurement process or aspects of it together, including occasions when contracting authorities from different EU member states undertake procurement jointly. The Directive makes provision for authorities to assume joint responsibility for compliance with regulations applicable to the procurement process. According to the commission's 2017 ''Communication ... on Making Public Procurement work in and for Europe'', only 11% of procurement procedures are conducted by cooperative procurement procedures; the Commission considers that this low level rate of aggregation suggests that opportunities are being missed.


Light-touch regime

The light-touch regime (LTR) is a specific set of rules for certain service contracts which tend to be of lower interest to cross-border competition. Those service contracts include certain social, health and education services, defined by Common Procurement Vocabulary (CPV) codes. The list of services to which the Light-Touch Regime applies is set out in Schedule 3 of the Public Contracts Regulations 2015 (Annex A). This regime allows for significantly fewer procedural limitations and only applies to services contracts valued over €750,000 (£615,278 in the UK).


Exceptions

The ''Teckal'' exception (or exemption), derived from a 1999 ECJ ruling, allows a contracting authority to award a contract directly to a separate entity provided these two requirements are both met: *the public authority awarding the contract must exercise control over the separate entity, to an extent similar to the control which the public authority exercises over its own departments (the "similar control" requirement), and *a substantial part, at least 80%, of the activities of the separate entity must be carried out for the public authority awarding the contract. The ''Hamburg Waste'' exception applies to genuine inter-authority agreements through which separate entities, each with a public service duty to perform, agree to carry out that duty together, where the cooperation is governed only by consideration relating to the public interest. In the Hamburg waste case, four German district administrations,
Rotenburg (Wümme) Rotenburg may refer to: *Rotenburg (district), Lower Saxony, Germany *Rotenburg an der Wümme, capital of the district * Rotenburg an der Fulda, near Kassel in Hesse * Rothenburg ob der Tauber, in the Franconia region of Bavaria * Hersfeld-Rotenbur ...
, Harburg,
Soltau-Fallingbostel Heidekreis ("Heath district") is a district (''Landkreis'') in Lower Saxony, Germany. It is bounded by (from the north and clockwise) the districts of Harburg, Lüneburg, Uelzen, Celle, Hanover, Nienburg, Verden and Rotenburg. History Histo ...
and Stade, signed a contract with the City of Hamburg for
waste disposal Waste management or waste disposal includes the processes and actions required to manage waste from its inception to its final disposal. This includes the collection, transport, treatment and disposal of waste, together with monitorin ...
without a call for tenders.A third way to share public contracts
published March 2017, accessed 16 August 2020
The ECJ found that public-public co-operation could be exempt from the public procurement rules where: *the arrangement involves only contracting authorities (i.e., there is no participation of private capital); *the nature of the agreement is one of genuine cooperation aimed at the joint performance of a common task, as opposed to a normal public contract; and *co-operation is governed only by considerations relating to the public interest. A third exception has been identified through the case of Remondis GmbH & Co. KG Region Nord v. Region Hannover. The Oberlandesgericht Celle (Higher Regional Court of Celle, Germany) made a request for a preliminary ruling under Article 267 of the
Treaty on the Functioning of the European Union The Treaty on the Functioning of the European Union (TFEU) is one of two treaties forming the constitutional basis of the European Union (EU), the other being the Treaty on European Union (TEU). It was previously known as the Treaty Establishi ...
(TFEU) in this case. The
Hannover Hanover (; german: Hannover ; nds, Hannober) is the capital and largest city of the German state of Lower Saxony. Its 535,932 (2021) inhabitants make it the 13th-largest city in Germany as well as the fourth-largest city in Northern Germany ...
region and the city of
Hanover Hanover (; german: Hannover ; nds, Hannober) is the capital and largest city of the German state of Lower Saxony. Its 535,932 (2021) inhabitants make it the 13th-largest city in Germany as well as the fourth-largest city in Northern Germany ...
, the state capital, had delegated their waste management responsibilities and powers to a special purpose association created by themselves to take on these responsibilities. In Datenlotsen Informationssysteme GmbH v Technische Universität Hamburg-Harburg, the ECJ was asked to consider whether the Teckal exception could be extended to "horizontal" in-house contracts between a public contracting authority and a body wholly-owned by the German state. In an earlier 1999 ruling, the fifth chamber of the European Court stated that article 55 of the EC Treaty (now article 45 of TFEU) did not apply to situations where "all the facts f the caseare confined to within a single Member State" and therefore the freedom of movement for persons and freedom to provide services are not engaged. This case, also a waste collection case, did not concern the award of a public contract to a third party for the latter to provide a service, but the selection of a financial company to become a partner in a mixed-capital company with a majority public shareholding, which would then provide the waste collection service. RI.SAN srl, an Italian company, challenged the
Comune The (; plural: ) is a local administrative division of Italy, roughly equivalent to a township or municipality. It is the third-level administrative division of Italy, after regions ('' regioni'') and provinces (''province''). The can also ...
of
Ischia Ischia ( , , ) is a volcanic island in the Tyrrhenian Sea. It lies at the northern end of the Gulf of Naples, about from Naples. It is the largest of the Phlegrean Islands. Roughly trapezoidal in shape, it measures approximately east to west ...
's selection of GEPI SpA, an Italian In 2014, the European Court ruled that "where the contractor ... is a non-profit association which, at the time of the award of the contract, has as partners not only public sector entities but also private social solidarity institutions carrying out non-profit activities, the requirement for 'similar control' ... is not met". This ruling was declared in relation to a
Portuguese Portuguese may refer to: * anything of, from, or related to the country and nation of Portugal ** Portuguese cuisine, traditional foods ** Portuguese language, a Romance language *** Portuguese dialects, variants of the Portuguese language ** Portu ...
case whereby Eurest (Portugal) (''Sociedade Europeia de Restaurantes Lda'') had challenged the award of a hospital catering contract by ''Centro Hospitalar de
Setúbal Setúbal (, , ; cel-x-proto, Caetobrix) is a city and a municipality in Portugal. The population in 2014 was 118,166, occupying an area of . The city itself had 89,303 inhabitants in 2001. It lies within the Lisbon metropolitan area. In the ti ...
to Serviço de Utilização Comum dos Hospitais'' (SUCH) without a tender exercise.Centro Hospitalar de Setúbal EPE and Serviço de Utilização Comum dos Hospitais (SUCH) v. Eurest (Portugal) – Sociedade Europeia de Restaurantes Lda
case C574/12, published 19 June 2014, accessed 25 January 2021
SUCH was established by legislative decree and enjoyed a "public service mission" concerned with the efficiency of the Portuguese
National Health Service The National Health Service (NHS) is the umbrella term for the publicly funded healthcare systems of the United Kingdom (UK). Since 1948, they have been funded out of general taxation. There are three systems which are referred to using the " ...
, but its ownership and management involved both a number of public authorities and a number of charitable organisations: of 88 partners in total, 23 were non-governmental organisations in the "social sector".Mengozzi, P.
Centro Hospitalar de Setúbal EPE and Serviço de Utilização Comum dos Hospitais (SUCH) v. Eurest (Portugal) – Sociedade Europeia de Restaurantes Lda – Opinion of the Advocate General
published 27 February 2014, accessed 26 January 2021
The court argued that the participation of non-governmental interests meant that there was opportunity for SUCH to pursue interests which may be "commendable", but not the same as the interests of the public authorities, and although those interests were not the same as the profit motive driving private sector capital interests, they still meant that the "similar control" requirement had not been met. The 2014 Directive incorporated the ''Teckal'' case law into article 12, which outlines circumstances in which a public contract falls outside the scope of the Directive.


Defence procurement

Procurement of arms, munitions, war material and related works and services acquired for defence purposes and procurement of sensitive supplies, works and services required for security purposes are subject to EU Directive 2009/81/EC on defence and sensitive security procurement, not the Directives on Public Procurement. The purpose of the directive is to balance the need for transparency and openness in defence markets within the European Single Market with the need to protect individual countries' security interests.European Commission
Defence procurement
accessed 9 June 2018
The European Commission has been working to improve cross-border access for
small and medium-sized enterprise Small and medium-sized enterprises (SMEs) or small and medium-sized businesses (SMBs) are businesses whose personnel and revenue numbers fall below certain limits. The abbreviation "SME" is used by international organizations such as the World Ban ...
s in defence contracts and on 20 April 2018 the Commission published a 'Recommendation on cross-border market access for sub-suppliers and SMEs in the defence sector' calling for earlier and clearer publication of information regarding member states' long-term plans and priorities in defence procurement.


Infrastructure procurement

An "Ex-ante Assessment Mechanism", introduced in November 2017, allows the European Commission and contracting authorities to share information about the public procurement aspects of various infrastructure projects. The mechanism was established via the European Commission's Communication on "Helping investment through a voluntary ex-ante assessment of the procurement aspects for large infrastructure projects" of 3 November 2017,European Commission
Communication from the Commission to the Institutions: Helping investment through a voluntary ex-ante assessment of the procurement aspects for large infrastructure projects
COM (2017) 573, published 3 October 2017, accessed 11 May 2021
and includes a helpdesk, notification mechanism and information exchange mechanism, whose shared aim is to help public authorities manage large procurement projects as efficiently as possible, irrespective of whether they are funded by the EU itself or not.


Third country access

"Third country access" refers to access to a
common market The European Economic Community (EEC) was a regional organization created by the Treaty of Rome of 1957,Today the largely rewritten treaty continues in force as the ''Treaty on the functioning of the European Union'', as renamed by the Lisbo ...
by goods, services or traders who are based outside the common market borders, for example countries which are not part of the European Union and have not negotiated an international agreement which includes market access commitments. Resolutions were adopted by the European Council on 21 December 1976 (referenced in Directive 77/62/EEC issued on the same date) and 22 July 1980 regarding non-member state access to community public supply contracts, which noted the scope for individual Member States to apply their own commercial policy measures but also anticipated a Commission proposal on the "co-ordination and progressive standardization" of policies. The European Commission put forward an international procurement policy proposal in 2012 which would have established a
Regulation Regulation is the management of complex systems according to a set of rules and trends. In systems theory, these types of rules exist in various fields of biology and society, but the term has slightly different meanings according to context. Fo ...
on the access of third country goods and services to the EU's internal market in the field of public procurement. The proposed regulation would also have addressed access of EU goods and services to the public procurement markets of third countries. An amended proposal was put forward in 2016. As an EU Regulation it would have been directly applicable within EU Member States, including the United Kingdom at the time. The regulation would have enabled contracting authorities to reject high value tenders (over €5m) with more than 50% third country content, subject to European Commission approval, and allow the commission to restrict access to EU public procurement markets where third countries did not offer open access to EU companies to compete for public contracts. Cabinet Office
Procurement Policy Note – European legislative proposals on third country access to the EU public procurement market. Information Note 03/12 5 April 2012
accessed 16 August 2021
The UK government at the time was "strongly opposed" to restrictions on third country access to EU markets, fearing that "tit-for-tat
protectionism Protectionism, sometimes referred to as trade protectionism, is the economic policy of restricting imports from other countries through methods such as tariffs on imported goods, import quotas, and a variety of other government regulatio ...
" would result. Significant reservations were expressed by members and committee rapporteurs in the European Parliament. The Commission published an amended proposal in 2016,European Commission
Amended proposal for a Regulation of the European Parliament and of the Council on the access of third-country goods and services to the Union’s internal market in public procurement and procedures supporting negotiations on access of Union goods and services to the public procurement markets of third countries
COM(2016) 34 final, published 29 January 2016, accessed 16 August 2021
which maintained the position that world procurement markets lacked a "level playing field". No formal consideration of the proposal has been reported since October 2019.


Administration

Within the European Commission's operations, public procurement policy is administered by unit GROW.C.2 within the Directorate-General for Internal Market, Industry, Entrepreneurship and SMEs, located in
Brussels Brussels (french: Bruxelles or ; nl, Brussel ), officially the Brussels-Capital Region (All text and all but one graphic show the English name as Brussels-Capital Region.) (french: link=no, Région de Bruxelles-Capitale; nl, link=no, Bruss ...
.Publications Office of the European Union
Public Procurement (GROW.C.2)
accessed 29 November 2022


Bibliography

* * * * * *
Pdf.


See also

*
Government procurement Government procurement or public procurement is the procurement of goods, services and works on behalf of a public authority, such as a government agency. Amounting to 12 percent of global GDP in 2018, government procurement accounts for a sub ...
– includes details of transposition of EU procurement law into the legal regimes of each EU member state. *
List of European Court of Justice rulings The following is a list of notable judgments of the European Court of Justice. Principles of Union Law Direct effect Treaties, Regulations and Decisions * Van Gend en Loos 26/62 963ECR 1 "The uropean EconomicCommunity constitutes a n ...
, especially sections covering the procurement procedures of entities operating in the water, energy, transport and postal services sectors, and public procurement


References


External links

* * {{cite news, url=https://www.economist.com/news/europe/21710315-government-contracting-growing-less-competitive-and-often-more-corrupt-rigging-bids, title=Rigging the bids – Government contracting is growing less competitive, and often more corrupt, newspaper=
The Economist ''The Economist'' is a British weekly newspaper printed in demitab format and published digitally. It focuses on current affairs, international business, politics, technology, and culture. Based in London, the newspaper is owned by The Eco ...
, date=19 November 2016
Procurement Procurement is the method of discovering and agreeing to terms and purchasing goods, services, or other works from an external source, often with the use of a tendering or competitive bidding process. When a government agency buys goods or serv ...
European Union competition law